会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 1. 发明专利
    • REFUSE COLLECTING SYSTEM FOR STAND FACILITIES
    • JPH06239403A
    • 1994-08-30
    • JP2511993
    • 1993-02-15
    • TAKENAKA KOMUTEN CO
    • MATSUKAWA TOSHIMASAKADOKAWA KIYOYUKIOHIRA SHIGEHIKO
    • B65F5/00E04F17/10E04H3/12
    • PURPOSE:To reduce labor for recovering refuse for improving the efficiency or collecting refuse in stand parts by providing a port opened and closed to transfer the refuse down to respective stand parts in stand facilities haing a plurality of stand part spaced by vertical intervals from each other and provided with seats. CONSTITUTION:In a dome stadium D, seats K are provided around an arena A and further a storied structure part F is provided around the outer periphery of the seats. The seats K are composed of a plurality of stand parts 3 disposed vertically, i.e., a main stand part 4 conically inclined centering around the arena A, sub-stand part 5 similarly inclined and spaced upward from the main stand part and further special stand part 6 formed above the same. The main and sub-stand parts 4, 5 are provided with refuse transfer ports 9 and refuse dumped into the port 9 is dropped and recovered in a refuse accumulating part 8 through a fixed chute 7. Also, the storied structure part F is provided with the fixed chute 7 extending from an upper layer story to a lower one so that the refuse discharged from the respective stories is similarly dropped and recovered in the refuse accumulating part 8.
    • 2. 发明专利
    • HANDRAIL WALL MOUNTING STRUCTURE
    • JPH10169137A
    • 1998-06-23
    • JP33056296
    • 1996-12-11
    • TAKENAKA KOMUTEN CO
    • OHIRA SHIGEHIKOHONDA TOMOTSUNE
    • E04F11/18
    • PROBLEM TO BE SOLVED: To execute a high-efficient mounting work and to improve the decoration properties of a mounting spot by a method wherein a smoke-proofing wall hanging down from a ceiling for a lower floor is integrally built at the lower end part of a handrail wall body built at the side end part of the open ceiling part of a slab to partition upper and lower floors from each other. SOLUTION: A mounting fitment 3 comprises a mounting bolt 3a; and a fitment body 3b joined in a screwed-in state with the bolt 3a. The foundation part of the fitment body 3b is securely welded to a tie part 6 and a fitment fixing plate 8. Further, a fire-resistant sealant 9 is located between a floor plate part 1b and a handrail wall body 4 for closure. In this case, the sealant 9 can be seen through a sheet glass from the open ceiling part V side and hardly noticed by using the same color as that of a slab part 1 on the back. Further, the sealant 9 is arranged in a state to be placed on a catching part 10 formed at the end part of the floor plate part 1b so as to catch the sealant 9 at a gap. This constitution prevents leakage of smoke to an upper floor through the gap when smoke generated at a lower floor is dammed up by a smoke-proofing wall part 4b hanging down from a ceiling, and relieves labor required for mounting.