会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 1. 发明专利
    • Radio communication system
    • 无线电通信系统
    • JP2014072791A
    • 2014-04-21
    • JP2012218341
    • 2012-09-28
    • Panasonic Corpパナソニック株式会社
    • UEDA SHINSUKEYOSHIKI KAZUHISAHIGASHIHAMA HIROTADA
    • H04W84/18H04W72/04
    • PROBLEM TO BE SOLVED: To stably and efficiently transmit/receive signals while avoiding collision of signals even in the case where a repeater is used between a controlled device and a control device, in two-way radio communication between the controlled device and the control device in a radio communication system.SOLUTION: A radio communication system 1 comprises a controller 2 (control device) which performs two-way radio communication with a switch 4 (controlled device) directly or via a repeater 5. While defining a control signal to be transmitted as a starting point, the controller 2 sets time slots including a control signal relay slot which is specified in accordance with the number of repeaters 5, a response signal transmission slot which is specified in accordance with the number of switches 4, and a response signal relay slot which is specified in accordance with the number of repeaters 5. The switch 4 determines a slot to be used in accordance with a controlled device number, and the repeater 5 determines a slot to be used in accordance with a repeater number.
    • 要解决的问题:即使在受控设备和控制设备之间使用中继器的情况下,即使在受控设备和控制设备之间的双向无线电通信中,也能够在避免信号冲突的同时稳定有效地发送/接收信号 在无线电通信系统中。无线电通信系统1包括直接或经由中继器5与开关4(受控设备)进行双向无线电通信的控制器2(控制设备)。在将控制信号定义为 作为起点发送,控制器2设定包括根据中继器5的数量指定的控制信号中继槽的时隙,根据开关数4指定的响应信号发送时隙,以及响应 信号中继槽,其根据中继器5的数量来指定。开关4根据受控设备号码确定要使用的时隙 r,并且中继器5根据中继器号码确定要使用的时隙。
    • 2. 发明专利
    • Load controller
    • 负载控制器
    • JP2013196969A
    • 2013-09-30
    • JP2012064211
    • 2012-03-21
    • Panasonic Corpパナソニック株式会社
    • KATO KAZUSUKEKAWAI ATSUSHIHIGASHIHAMA HIROTADAAKAHORI YASUHIROMURAYAMA KANAKOSHIBAMURA ICHIRO
    • H05B37/02
    • PROBLEM TO BE SOLVED: To provide a load controller including fewer operation units for downsizing.SOLUTION: A load controller 1 includes a signal processing section 11, touch sensors 12, and an output circuit 13. The touch sensor 12 consists of an electrostatic-capacitive type sensor, and a plural of touch sensors are disposed on a back side of an operation unit, and are configured to vary their electrostatic capacitance values when a finger of an operator touches to the operation unit. The signal processing section 11 detects which of a tap operation or a flick operation is performed when the operation unit is operated, on the basis of a plurality of outputs of the touch sensors 12. The signal processing section 11 instructs the output circuit 13 to output a different control command to an LED lighting fixture 100 depending on which of the tap operation or detecting the flick operation is detected, thereby controlling the LED lighting fixture 100 in a different state.
    • 要解决的问题:提供一种负载控制器,其具有较少的用于小型化的操作单元。解决方案:负载控制器1包括信号处理部分11,触摸传感器12和输出电路13.触摸传感器12由静电电容 并且多个触摸传感器设置在操作单元的背面,并且被配置为当操作者的手指触摸操作单元时改变其静电电容值。 信号处理部11基于触摸传感器12的多个输出,检测在操作单元被操作时执行抽头操作或轻拂操作中的哪一个。信号处理部11指示输出电路13输出 根据抽头操作中的哪一个或检测到轻拂操作,对LED照明器具100的不同的控制命令被检测到,从而将LED照明器具100控制在不同的状态。
    • 3. 发明专利
    • Power selling schedule presentation system
    • 电力销售时间表介绍系统
    • JP2013110917A
    • 2013-06-06
    • JP2011255953
    • 2011-11-24
    • Panasonic Corpパナソニック株式会社
    • UMEDA NAOKIHIGASHIHAMA HIROTADASHIGEZUMI ITSUKIKAMIMURA MITSUHISA
    • H02J3/00
    • PROBLEM TO BE SOLVED: To provide a power selling schedule presentation system capable of facilitating efficient use of surplus power.SOLUTION: A management server at power firm forecasts a power demand in one or several future days for each area on the basis of previous past record, etc., and generates a schedule (power selling schedule) representing allowance of power selling for each area from the forecast result. The generated power selling schedule is delivered to an interphone master unit 3 as a presentation unit via a reception terminal (master unit 1 and slave unit 2). The power selling schedule delivered from the management server at the power firm is displayed on an interphone master unit 3. With this, tenants are provided with information on allowable period of power selling and are given with an incentive to save the use of the power; and during non-power selling period, the tenants are encouraged to positively use the power. Thus, efficient use of surplus power is facilitated.
    • 要解决的问题:提供能够有效利用剩余电力的电力销售计划表示系统。 解决方案:电力公司的管理服务器根据以前的记录等对每个区域的一个或几个未来几天的电力需求进行预测,并生成一个计划表(电力销售时间表),表示电力销售的余额 每个区域从预测结果。 所生成的电力销售计划经由接收终端(主单元1和从单元2)作为呈现单元传送到对讲机主单元3。 从电力公司的管理服务器提供的电力销售计划显示在对讲机主单元3上。由此,向租户提供有关电力销售允许期间的信息,并给予动力以节省使用电力; 在非电力销售期间,鼓励租户积极利用电力。 因此,有助于有效利用剩余电力。 版权所有(C)2013,JPO&INPIT
    • 4. 发明专利
    • Two-channel load control device
    • 双通道负载控制装置
    • JP2013101784A
    • 2013-05-23
    • JP2011243931
    • 2011-11-07
    • Panasonic Corpパナソニック株式会社
    • SAITO YUTAKATOYODA ICHIROHIGASHIHAMA HIROTADA
    • H05B37/02
    • PROBLEM TO BE SOLVED: To perform control of a load from an on state to an off state even in the connection of a load with low power consumption in a two-channel load control device.SOLUTION: A two-channel load control device comprises: a switch element 12 connected between two input terminals; an off power supply unit 14 operating when the switch element 12 is in a non-conductive state; an on power supply unit 17 operating when the switch element 12 is in a conductive state; and a control unit 20 controlling the conduction and non-conduction of the switch element 12. The control unit 20 monitors the DC power output from the on power supply unit 17 and when the DC power becomes less than a predetermined threshold value while the switch element 12 is in the conductive state, the control unit 20 does not switch the switch element 12 from the conductive state to the non-conductive state.
    • 要解决的问题:即使在双通道负载控制装置中连接具有低功耗的负载的情况下,也可以将负载从接通状态控制到断开状态。 解决方案:双通道负载控制装置包括:连接在两个输入端之间的开关元件12; 断开电源单元14,其在开关元件12处于非导通状态时动作; 当开关元件12处于导通状态时工作的接通电源单元17; 控制单元20控制开关元件12的导通和非导通。控制单元20监视从接通电源单元17输出的直流电力,并且当直流功率变得小于预定阈值时,开关元件 12处于导通状态,控制单元20不将开关元件12从导通状态切换到非导通状态。 版权所有(C)2013,JPO&INPIT
    • 5. 发明专利
    • Load control device
    • 负载控制装置
    • JP2012198862A
    • 2012-10-18
    • JP2011064153
    • 2011-03-23
    • Panasonic Corpパナソニック株式会社
    • SAITO YUTAKAHIGASHIHAMA HIROTADA
    • G05F1/455
    • PROBLEM TO BE SOLVED: To reduce switching noise of a triac in a load control device using the triac as a primary opening and closing part and a thyristor as an auxiliary opening and closing part.SOLUTION: A load control device includes an auxiliary opening and closing part 17 and a primary opening and closing part 11. The auxiliary opening and closing part 17 is connected between a commercial power supply 2 and a load 3 in series and conducted earlier when energizing the load 3. The primary opening and closing part 11 supplies stabler power at a nearer side than the auxiliary opening and closing part 17 to the load 3 after the auxiliary opening and closing part 17 is conducted. The primary opening and closing part 11 employs a triac 11a as a primary switching element, and the load control device further includes an auxiliary power supply section 19 for reducing switching noise of the triac 11a. The auxiliary power supply section 19 is composed of a capacitor 191 charged by the commercial power supply, backflow prevention diodes 192 and 193, and switching elements 194 and 195 and the like.
    • 要解决的问题是:使用三端双向可控硅开关作为主要开闭部分和作为辅助开闭部分的晶闸管来减小三端双向双向可控硅开关元件的开关噪声。 解决方案:负载控制装置包括辅助开闭部17和主开闭部11.辅助开闭部17串联连接在商用电源2和负载3之间,并且较早地进行 当负载3通电时,辅助打开和关闭部分17被导通之后,主开闭部分11将比辅助开闭部分17更靠近的一侧提供给负载3。 主开闭部11采用三端双向可控硅开关元件11a作为一次开关元件,负载控制装置还包括用于降低三端双向晶闸管11a的开关噪声的辅助电源部19。 辅助电源部分19由由商用电源,防回流二极管192和193以及开关元件194和195等充电的电容器191组成。 版权所有(C)2013,JPO&INPIT
    • 6. 发明专利
    • Load control device
    • 负载控制装置
    • JP2012198661A
    • 2012-10-18
    • JP2011061356
    • 2011-03-18
    • Panasonic Corpパナソニック株式会社
    • SAITO YUTAKAHIGASHIHAMA HIROTADA
    • G05F1/455
    • PROBLEM TO BE SOLVED: To reduce switching noise of a thyristor in a load control device using a triac as a primary opening and closing part and the thyristor as an auxiliary opening and closing part.SOLUTION: A load control device includes an auxiliary opening and closing part 17 and a primary opening and closing part 11. The auxiliary opening and closing part 17 is connected between a commercial power supply 2 and a load 3 in series and conducted earlier when energizing the load 3. The primary opening and closing part 11 supplies stabler power at a nearer side than the auxiliary opening and closing part 17 to the load 3 after the auxiliary opening and closing part 17 is conducted. The auxiliary opening and closing part 17 employs a thyristor 17a as a switching element, and the load control device further includes an auxiliary power supply section 19 for reducing switching noise of the thyristor. The auxiliary power supply section 19 is a snubber circuit composed of a diode 191 and a capacitor 192, for example.
    • 要解决的问题:减少使用三端双向可控硅开关作为主要开闭部分的负载控制装置中的晶闸管的开关噪声以及作为辅助开闭部分的晶闸管。 解决方案:负载控制装置包括辅助开闭部17和主开闭部11.辅助开闭部17串联连接在商用电源2和负载3之间,并且较早地进行 当负载3通电时,辅助打开和关闭部分17被导通之后,主开闭部分11将比辅助开闭部分17更靠近的一侧提供给负载3。 辅助开闭部17采用晶闸管17a作为开关元件,负载控制装置还包括用于降低晶闸管的开关噪声的辅助电源部19。 辅助电源部分19是例如由二极管191和电容器192组成的缓冲电路。 版权所有(C)2013,JPO&INPIT
    • 7. 发明专利
    • Load control device
    • 负载控制装置
    • JP2012198660A
    • 2012-10-18
    • JP2011061347
    • 2011-03-18
    • Panasonic Corpパナソニック株式会社
    • SAITO YUTAKAHIGASHIHAMA HIROTADA
    • G05F1/45H05B37/02
    • PROBLEM TO BE SOLVED: To provide a two-wire load control device capable of preventing a malfunction of a load (erroneous emission of an LED bulb, etc.) even if the low load of power consumption of the LED bulb, etc. is connected.SOLUTION: A second power supply unit (off power supply unit) 15, which is connected in serious between a commercial power supply 2 and a load 3 and is for securing an internal power supply during an OFF state of the load 3, includes a voltage clamp circuit 15a for outputting electric power with an approximately trapezoidal voltage waveform by clamping a voltage of a pulsating flow rectified by a rectifier 12, and a smoothing circuit 15b which fills a part of a valley part of the approximately trapezoidal voltage waveform and which outputs the electric power having a DC voltage equivalent to a bottom of the filled valley part.
    • 要解决的问题:即使LED灯泡等的低功耗,也能够提供能够防止负载故障(LED灯泡等的错误发射)的二线负载控制装置 。 已连接。

      解决方案:在商用电源2和负载3之间严重连接的用于在负载3的OFF状态期间固定内部电源的第二电源单元(关闭电源单元)15, 包括用于通过钳位由整流器12整流的脉动流的电压而输出大致梯形电压波形的电力的电压钳位电路15a和填充大致梯形电压波形的谷部的一部分的平滑电路15b,以及 其输出具有与填充谷部的底部相当的直流电压的电力。 版权所有(C)2013,JPO&INPIT

    • 8. 发明专利
    • Illuminance detection circuit
    • 照明检测电路
    • JP2012145412A
    • 2012-08-02
    • JP2011003200
    • 2011-01-11
    • Panasonic Corpパナソニック株式会社
    • KOROGI TAKESHIHIGASHIHAMA HIROTADAKOKURI YOKO
    • G01J1/42G01J1/44H05B37/02
    • Y02B20/42Y02B20/46
    • PROBLEM TO BE SOLVED: To provide an illuminance detection circuit performing a correct illuminance determination during low illuminance while suppressing current consumption during high illuminance.SOLUTION: An illuminance detection circuit 11 makes an illuminance sensor IC21 into an inactive state when a sensor output sampled at a time T1 before a time Tr when the sensor output is stabilized is a threshold Dr or more after the illuminance sensor IC21 is made into an active state. When the sensor output sampled at the time T1 is less than the threshold Dr, a sensor output is sampled again at a time T2 after the time Tr.
    • 要解决的问题:提供在低照度期间执行正确的照度确定同时抑制高照度期间的电流消耗的照度检测电路。 解决方案:当在传感器输出稳定时在时间Tr之前的时间T1采样的传感器输出在照度传感器IC21为“否”之后,阈值Dr或更大时,照度检测电路11使得照度传感器IC21处于非活动状态 成为一个活跃的状态。 当在时间T1采样的传感器输出小于阈值Dr时,在时间Tr之后的时间T2再次对传感器输出进行采样。 版权所有(C)2012,JPO&INPIT
    • 9. 发明专利
    • Load control device
    • 负载控制装置
    • JP2012242910A
    • 2012-12-10
    • JP2011109778
    • 2011-05-16
    • Panasonic Corpパナソニック株式会社
    • SAITO YUTAKAHIGASHIHAMA HIROTADA
    • G05F1/455
    • PROBLEM TO BE SOLVED: To reduce switching noise of a triac and a thyristor in a load control device in which the triac and the thyristor are used as a main opening/closing part and as an auxiliary opening/closing part, respectively.SOLUTION: The load control device includes an auxiliary opening/closing part 17 and a main opening/closing part 11 connected in series between a commercial power source 2 and a load 3. When energizing the load 3, the auxiliary opening/closing part 17 is first conducted, and after the conduction the main opening/closing part 11 supplies power more stably at a side closer to the load 3 than the auxiliary opening/closing part 17. The auxiliary opening/closing part 17 uses a thyristor 17a as a switch element while the main opening/closing part 11 uses a triac 11a as a main switch element. The device also has an auxiliary power supply part 19 for reducing switching noise of the thyristor 17a and triac 11a. The auxiliary power supply part 19 is constituted by a series resonance circuit with a coil 19a and a capacitor 19b.
    • 要解决的问题:为了降低三端双向可控硅开关和晶闸管用作主开/关部分和辅助开/关部分的负载控制装置中的三端双向可控硅开关和晶闸管的开关噪声。 解决方案:负载控制装置包括在商用电源2和负载3之间串联连接的辅助开闭部17和主开/闭部11.当对负载3通电时,辅助开/ 首先进行部件17的导通,主开闭部11在比辅助开闭部17更靠近负载3的一侧更稳定地供给电力。辅助开闭部17使用晶闸管17a作为 开关元件,而主开闭部11使用三端双向可控硅开关元件11a作为主开关元件。 该装置还具有用于降低晶闸管17a和三端双向可控硅片11a的开关噪声的辅助电源部件19。 辅助电源部19由具有线圈19a和电容器19b的串联谐振电路构成。 版权所有(C)2013,JPO&INPIT
    • 10. 发明专利
    • Load controller
    • 负载控制器
    • JP2013196970A
    • 2013-09-30
    • JP2012064212
    • 2012-03-21
    • Panasonic Corpパナソニック株式会社
    • KAWAI ATSUSHIKATO KAZUSUKEHIGASHIHAMA HIROTADAAKAHORI YASUHIROMURAYAMA KANAKOSHIBAMURA ICHIRO
    • H05B37/02
    • Y02B20/42Y02B20/46
    • PROBLEM TO BE SOLVED: To provide a load controller including fewer operation parts for downsizing.SOLUTION: In a load controller, an operation unit 20 is cantilever-supported by a plate member 30 via an attachment piece 20c. A rear side of the operation unit 20 is provided with a touch board 21 on which a capacitance type touch sensor 12 is mounted. A main board 22 attached on a rear side of the plate member 30 is mounted with a tact switch 11 in which a push button 11a is driven by the operation unit 20. A signal processing unit mounted on the main board 22 executes a different load control depending on whether the tact switch 11 detects a push operation or the tap sensor 12 detects a tap operation.
    • 要解决的问题:提供一种负载控制器,其包括用于小型化的较少的操作部件。解决方案:在负载控制器中,操作单元20经由附接件20c由板构件30悬臂支撑。 操作单元20的后侧设置有安装有电容式触摸传感器12的触摸板21。 安装在板构件30的后侧的主板22安装有操作单元20驱动按钮11a的轻触开关11.安装在主板22上的信号处理单元执行不同的负载控制 取决于轻触开关11是否检测到按压操作,或者抽头传感器12检测到抽头操作。