会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 5. 发明专利
    • Designing method of avalanche-load resisting dike
    • AVALANCHE负载电阻的设计方法
    • JP2008088762A
    • 2008-04-17
    • JP2006273328
    • 2006-10-04
    • Maeda Kosen Co LtdPurotekku Engineering:Kk前田工繊株式会社株式会社プロテックエンジニアリング
    • NISHIDA YOICHIFUJII TOSHIHIROINOUE SHOICHIYOSHIDA MASATERUKOBAYASHI HIROFUMI
    • E01F7/04
    • PROBLEM TO BE SOLVED: To provide a designing method of a dike which can cope with avalanches of various loads and impact patterns.
      SOLUTION: A plurality of net-like reinforcing materials 2 are arranged inside the dike 1 in a substantially horizontal direction at proper vertical intervals. A hard shock-receiving plate 3 made of concrete, for example, is formed on a mountain-side slope of the dike 1 to cover the whole surface. An impact force, an acting force, etc. of the avalanche 4 are obtained, structural specifications of the dike 1 are presumed, a structure of the dike 1 is presumed, and a sliding surface with a fixed angle ϕ from the lowermost end of the hard shock-receiving plate 3 is presumed. A sliding force urging sliding movement along the sliding surface of the dike 1 is obtained, a resisting force generated by the load of the dike 1 and a reinforcing material 2 is obtained, and a safety ratio is obtained based on the ratio of the resisting force and the sliding force. Then the dike 1 is designed so that the safety ratio reaches a predetermined value or higher.
      COPYRIGHT: (C)2008,JPO&INPIT
    • 要解决的问题:提供能够应对各种负载和冲击模式的雪崩的堤坝的设计方法。 解决方案:多个网状增强材料2以适当的垂直间隔在大致水平的方向上布置在堤坝1的内部。 例如,在堤坝1的山侧坡面上形成由混凝土构成的硬质的受震板3,以覆盖整个表面。 获得雪崩4的冲击力,作用力等,推测堤堤1的结构规格,假定堤防1的结构,以及距离桩1的最下端具有固定角度φ的滑动面 推测硬震接收板3。 获得了沿着堤坝1的滑动面滑动运动的滑动力,获得了由堤坝1和加固材料2的载荷产生的抵抗力,并且基于阻力比 和滑动力。 然后设计堤防1使得安全比达到预定值或更高。 版权所有(C)2008,JPO&INPIT
    • 7. 发明专利
    • Dam body structure
    • AM体结构
    • JP2008121264A
    • 2008-05-29
    • JP2006305786
    • 2006-11-10
    • Maeda Kosen Co LtdPurotekku Engineering:Kk前田工繊株式会社株式会社プロテックエンジニアリング
    • NOMURA TOSHIMITSUINOUE SHOICHIYOKOTA YOSHIHIROYOSHIDA MASATERU
    • E01F7/04E02D17/20
    • PROBLEM TO BE SOLVED: To enable rapid construction without needing large-scale construction work or a construction machine, and also enable structural calculation.
      SOLUTION: A cubic or rectangular parallelepiped bag body 1 is filled with a granular matter 5 such as earth and sand to form a granular mass block 6. A plurality of such mass blocks 6 is stacked on the ground and juxtaposed laterally and longitudinally. A lower portion of a connecting pole 7 extending through the blocks is buried in the ground to form an anchor 8. An upper portion of the connecting column 7 may be connected with an anchor on natural ground or an auxiliary connecting pole 16. Since the bag body 1 is filled with the granular matter 5, the dam body structure can be constructed using only a simple construction device, and calculation as a structure therefor can be also performed.
      COPYRIGHT: (C)2008,JPO&INPIT
    • 要解决的问题:无需大型施工作业或施工机械即可实现快速施工,并能进行结构计算。 解决方案:立方体或长方体状的袋体1填充有诸如泥土和砂粒的颗粒状物质5以形成颗粒块6。多个这样的块块6堆叠在地面上并且横向和纵向并置 。 延伸穿过块体的连接杆7的下部被埋在地面中以形成锚固件8.连接柱7的上部可以与自然地面上的锚固件或辅助连接杆16连接。由于袋子 主体1填充有粒状物质5,因此可以仅使用简单的施工装置来构造坝体结构,并且还可以进行作为其结构的计算。 版权所有(C)2008,JPO&INPIT