会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 1. 发明专利
    • Method for controlling degree of verticality of pc hollow pile
    • 控制PC中空柱垂直度的方法
    • JP2006336239A
    • 2006-12-14
    • JP2005159867
    • 2005-05-31
    • Ohbayashi Corp株式会社大林組
    • MASUTANI TATSUYASUZUKI HIROSHIOKAMOTO OTOKATSU
    • E02D13/06E02D5/20E02D5/58
    • PROBLEM TO BE SOLVED: To provide a method for controlling the degree of verticality of a PC hollow pile, which enables the degree of verticality of the PC hollow pile to be controlled by erecting the PC hollow pile with high degree of accuracy in a planned position, while keeping the degree of the verticality of the PC hollow pile within a range of a specified value.
      SOLUTION: In this method for controlling the degree of the verticality of the PC hollow pile, when an upper end of the PC hollow pile 2 is fixed by supporting means 14 and 18 which are provided on the earth's surface so that the hollow pile can be erected in a suspended state in an excavated ditch 4, one end of a measurement string 30 is fixedly attached to a locking rod 12, which is provided in the lower part of the PC hollow pile through its axial core part, in such a manner as to be pre-positioned in its axial core part, and the other end thereof is precedently led out upward from the upper end. After the erection of the PC hollow pile, a tower-shaped measurement platform 34 is installed above the PC hollow pile; the other end of the measurement string is fixedly attached to the measurement platform and provided in a stretched state; and the fixedly attached position of the end on the side of the measurement platform is adjusted so that the measurement string can be set vertical while collimation is performed from two directions by a transit 36. After the completion of positioning, a displacement between the axial core position of the upper end of the PC hollow pile and the measurement string is measured, and the degree of the verticality is controlled by correcting the fixed position of the upper end of the PC hollow pile so that the displacement can fall within the range of the specific value.
      COPYRIGHT: (C)2007,JPO&INPIT
    • 要解决的问题:提供一种用于控制PC空心桩的垂直度的方法,其能够通过以高精度竖立PC空心桩来控制PC中空桩的垂直度 同时将PC空心桩的垂直度保持在规定值的范围内。 解决方案:在PC中空桩的垂直度控制方法中,当PC空心桩2的上端由设在地球表面上的支撑装置14和18固定时, 桩可以在悬挂状态下竖立在挖沟4中,测量绳30的一端固定地安装在锁定杆12上,锁定杆12通过其轴芯部分设置在PC中空桩的下部 以预定位于其轴芯部的方式,其另一端先从上端向上引出。 PC空心桩架设后,在PC空心桩上安装有塔形测量平台34, 测量线的另一端固定在测量平台上并以拉伸状态提供; 并且调整测量平台一侧的端部的固定位置,使得测量串可以设置为垂直的,同时通过运输36从两个方向进行准直。定位完成之后,轴向芯 测量PC中空桩的上端位置和测量线,并通过校正PC中空桩的上端的固定位置来控制垂直度,使位移可以落在 具体价值。 版权所有(C)2007,JPO&INPIT
    • 2. 发明专利
    • Pc hollow pile for constructing wall body, and method for constructing wall body by using it
    • 用于构造墙体的PC中空砖,以及使用它来构造墙体的方法
    • JP2006336240A
    • 2006-12-14
    • JP2005159868
    • 2005-05-31
    • Ohbayashi Corp株式会社大林組
    • MASUTANI TATSUYASUZUKI HIROSHIOKAMOTO OTOKATSU
    • E02D5/12E02D5/24
    • PROBLEM TO BE SOLVED: To provide a PC hollow pile for constructing a wall body, which can be erected while keeping the dimensional accuracy of the separation of the PC hollow piles high, when the wall body is constructed by bringing the PC hollow piles into continuous contact with one another, and to provide a construction method for the PC hollow pile.
      SOLUTION: In a method for constructing the wall body, an insertion ditch 4 for the PC hollow pile is excavated over a predetermined length along a wall-body constructing line. The PC hollow piles with a rectangular cross-sectional surface are erected in the insertion ditch, fixed by supporting means 14 and 18 which are provided on the earth's surface, put into a suspended state in the insertion ditch, and continuously provided in a line in such a manner as to sequentially adjoin each other. In this case, one engaging piece 10a of an engaging means, which is provided on the lower part of the PC hollow pile on the side of precedent arrangement, is engaged with the other engaging piece 10b of an engaging means, which is provided in the lower part of the precedently arranged PC hollow pile, from above, while the PC hollow pile to be subsequently arranged along the precedently arranged PC hollow pile as a guide is lowered in a suspended state. Self-hardening slurry 24 is pre-infilled as a solidification material into the insertion ditch at the stage of the excavation of the insertion ditch, and the solidification of the slurry makes the solidified slurry fix the PC hollow piles in the state of enclosing the periphery of the PC hollow piles continuously provided in a line.
      COPYRIGHT: (C)2007,JPO&INPIT
    • 要解决的问题:为了提供一种用于构造壁体的PC空心桩,其可以在保持PC空心桩的分离的尺寸精度的同时竖立,当通过使PC空心构造壁体时 堆叠成彼此连续接触,并为PC空心桩提供施工方法。 解决方案:在一种用于构造壁体的方法中,用于PC空心桩的插入沟4沿着壁体构造线在预定长度上被挖掘。 具有矩形横截面的PC空心桩竖立在插入沟槽中,由设置在地球表面上的支撑装置14和18固定,在插入沟槽中处于悬挂状态,并以 这样的方式相互邻接。 在这种情况下,设置在PC空心桩的下一侧的前置装置一侧的接合装置的一个接合件10a与接合装置的另一个接合件10b接合, 下一部分先前排列的PC空心桩,从上方,随后沿着先前排列的PC空心桩作为引导件排列的PC空心桩在悬挂状态下降低。 自硬化浆料24在插入槽的开挖阶段,作为固化材料预填充到插入沟槽中,并且浆料的固化使得固化的浆料将PC中空桩固定在包围周边的状态 的PC空心桩连续提供在一条线上。 版权所有(C)2007,JPO&INPIT