会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 1. 发明专利
    • Mobile communication method, node for movement management, and packet exchange device
    • 移动通信方法,移动管理节点和分组交换设备
    • JP2011087200A
    • 2011-04-28
    • JP2009239881
    • 2009-10-16
    • Ntt Docomo Inc株式会社エヌ・ティ・ティ・ドコモ
    • NISHIDA KATSUTOSHISUZUKI KEISUKENARABA SHIN
    • H04W24/04H04L12/66H04M3/00H04W92/14
    • H04W24/04H04W76/027H04W76/068
    • PROBLEM TO BE SOLVED: To disconnect a GBR bearer in a core network in suitable timing when a device in a radio access network gets out of order while the GBR bearer is set. SOLUTION: A mobile communication method includes: a process A wherein a gateway device S-GW releases a first GBR bearer and transmits "Downlink Data Notification" to a packet exchange device SGSN when detecting the fault of a radio line control station RNC while a second GBR bearer for a mobile station UE is set; a process B wherein the packet exchange device SGSN transmits "Paging" to the mobile station UE; and a process C wherein the packet exchange device SGSN starts a procedure for releasing a second GBR bearer when receiving no response to "Paging" from the mobile station UE within a predetermined period. COPYRIGHT: (C)2011,JPO&INPIT
    • 要解决的问题:当无线接入网络中的设备在设置GBR承载时出现故障时,以合适的定时断开核心网中的GBR承载。 解决方案:移动通信方法包括:步骤A,其中,当检测到无线电线路控制站RNC的故障时,网关设备S-GW释放第一GBR承载并向分组交换设备SGSN发送“下行链路数据通知” 而设置移动台UE的第二GBR承载; 流程B,其中分组交换设备SGSN向移动台UE发送“寻呼”; 以及处理C,其中分组交换设备SGSN在预定时间段内从移动台UE接收到没有对“寻呼”的响应时,开始释放第二GBR承载的过程。 版权所有(C)2011,JPO&INPIT
    • 3. 发明专利
    • Mobile communication method, node for movement management, and packet exchange device
    • 移动通信方法,移动管理节点和分组交换设备
    • JP2011087291A
    • 2011-04-28
    • JP2010223239
    • 2010-09-30
    • Ntt Docomo Inc株式会社エヌ・ティ・ティ・ドコモ
    • NISHIDA KATSUTOSHISUZUKI KEISUKENARABA SHIN
    • H04W24/04H04W88/16
    • PROBLEM TO BE SOLVED: To disconnect a GBR bearer in a core network in suitable timing when a device in a radio access network gets out of order while the GBR bearer is set. SOLUTION: A mobile communication method includes: a process A wherein the gateway device S-GW releases a first GBR bearer and transmits "Downlink Data Notification" to a packet exchange device SGSN when detecting the fault of the radio line control station RNC while a second GBR bearer for a mobile station UE is set; a process B wherein the packet exchange device SGSN transmits "Paging" to the mobile station UE; and a process C wherein the packet exchange device SGSN starts a procedure for releasing the second GBR bearer when receiving no response to "Paging" from the mobile station UE within a predetermined period. COPYRIGHT: (C)2011,JPO&INPIT
    • 要解决的问题:当无线接入网络中的设备在设置GBR承载时出现故障时,以合适的定时断开核心网中的GBR承载。 解决方案:移动通信方法包括:步骤A,其中,当检测到无线电线路控制站RNC的故障时,网关设备S-GW释放第一GBR承载并向分组交换设备SGSN发送“下行链路数据通知” 而设置移动台UE的第二GBR承载; 流程B,其中分组交换设备SGSN向移动台UE发送“寻呼”; 以及处理C,其中分组交换设备SGSN在预定时间段内从移动台UE接收到没有对“寻呼”的响应时,开始释放第二GBR承载的过程。 版权所有(C)2011,JPO&INPIT