    • 4. 发明专利
    • METHOD FOR TUNNEL LINING CONSTRUCTION
    • JPH10292790A
    • 1998-11-04
    • JP35088793
    • 1993-12-31
    • NIPPON CONCRETE IND CO LTDGIFU KOGYO KK
    • KAWAHARA TADAOSHIRAIWA TADAHIROTANAKA MASAOINAGAWA YUKIHISASHODA SHINJI
    • E21D11/08
    • PURPOSE: To eliminate the need for lifting works and a hang jig for a built-up covering slab and a large-scale crane while using lightweight and small-sized car and equipment at low cost for adjusting transport and installation and to execute a method of tunnel lining construction. CONSTITUTION: Side walls 2 are constructed of cast-in-place concrete, rails 3 are installed at the upper ends of the side walls 2 in the direction of a tunnel, and the front end of a feed base is connected at end sections in entrances for the left-right side walls 2 in a series. An arched assembling frame is mounted on the feed base, rails continued to the rails 3 on the left-right side walls 2 are set up at the left-right upper ends of the feed base, covering slabs 4 are placed on the assembling frame while pairing left and right two slabs 4 and joined at upper end sections, and the mutual covering slabs 4 are connected and unified by a connecting member. The trucks of wheels are fitted at lower ends and placed on the rails, the whole is moved on the rails 3 of the side walls 2 from the feed base and transported up to a tunnel lining section, the covering slabs 4 are supported and fixed to the rails 3 through levelling fixtures 13 projected from the lower ends of the covering slabs 4 in the lining section, and foot protection concrete 44 is placed around the lower sections of the covering slabs 4 and the covering slabs 4 are unified with the side walls.
    • 10. 发明专利
    • TUNNEL LINING CONSTRUCTION METHOD
    • JPH084486A
    • 1996-01-09
    • JP16313894
    • 1994-06-21
    • NIPPON CONCRETE IND CO LTDGEOSTR CORPISHIKAWAJIMA KENZAI KOGYO KKNIPPON SAMIKON KK
    • KAWAHARA TADAOSHIRAIWA TADAHIRONAKAGAWA SHIGEJI
    • E21D11/00E21D11/08E21D11/40
    • PURPOSE:To execute the work by using a lightweight and an inexpensive equipment for the transport of segments and the installation adjustment. CONSTITUTION:A rail 3 is laid in the tunnel direction on the base floor 2 of a tunnel 1 to be lining-executed, and the tunnel ring-shaped lining pieces 4 are applied on the rail through wheels which are installed in free mounting and demounting in the wheel installation hole in a floor base part 5, and traveling-shifted to the lining execution part, and at the installation position of the lining execution part, a plurality of supporting bolts 16 installed in a free screwing adjustable manner at the floor base part of the lining execution piece are projectingly installed downward. The top end of the supporting bolt 16 is pressed on the floor surface of the tunnel 1 and level- adjusted to a specific height and supported, and a pushing-out bolt which is projectingly installed in a free screwing adjustable manner toward the outside on the left and right side wall parts of the lining piece 4 is press-attached on the side wall part of the tunnel, and the lateral position of the lining piece 4 is adjusted. The foot protecting concrete 23 is placed on the outside of the floor base part 5 of the lining execution piece 4, and the outer peripheral part of the lining execution piece 4 on the foot protecting concrete 23 is charged with the backing material 24.