会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 1. 发明专利
    • Medicine feeding device
    • 医药进料装置
    • JP2014185797A
    • 2014-10-02
    • JP2013060047
    • 2013-03-22
    • Miura Co Ltd三浦工業株式会社
    • WATABE TOSHITOSATO HAJIME
    • F28G13/00B01J4/02F28F19/00F28F19/01
    • PROBLEM TO BE SOLVED: To provide a medicine feeding device capable of restricting useless consumption of medicine through blowdown processing started during execution of chemical feed.SOLUTION: A medicine feeding device 300 comprises: a timing means 312 for counting a medicine inputting time and an overlapped time of blow processing time and the medicine inputting time; and a chemical feed control part 311 for waiting a chemical feed processing when the medicine inputting time is counted during the blow processing time, executing the chemical feed processing with the medicine of input amount corresponding to the overlapped time after blow processing, interrupting the chemical feed processing when a subsequent blow processing is executed during execution of the chemical feed processing, and after the subsequent blow processing, executing the chemical feed processing with medicine of amount totaling a feeding amount of medicine not supplied during the preceding blow processing and an amount of feed of medicine corresponding to the overlapped time in the subsequent blow processing.
    • 要解决的问题:提供能够通过在执行化学进料期间开始的排污处理来限制药物的无用消耗的药物供给装置。解决方案:药物供给装置300包括:计时装置312,用于计数药物输入时间和重叠 吹制处理时间和药物输入时间; 以及化学品供给控制部311,用于在吹制处理时间内对药物输入时间进行计数时,进行化学品进给处理的处理,进行与进行吹炼处理后的重叠时间对应的输入量的药剂的进给处理,中断化学进料 在进行化学进料处理时进行后续的吹炼处理的处理,在进行后续的吹炼处理之后,进行与在前一次吹制处理中未供给的药物的供给量相当的量的药剂的进料处理以及进料量 的药物对应于随后的吹制处理中的重叠时间。
    • 2. 发明专利
    • Water treatment system
    • 水处理系统
    • JP2014070744A
    • 2014-04-21
    • JP2012214727
    • 2012-09-27
    • Miura Co Ltd三浦工業株式会社
    • WATABE TOSHITOSATO HAJIME
    • F28G9/00F28F19/00
    • PROBLEM TO BE SOLVED: To provide a water treatment system capable of supplying a chemical agent at suitable timing in auxiliary chemical injection treatment.SOLUTION: The water treatment system includes: a cooling tower 120; a make-up water line L120; chemical agent supply means 134; water quality detection means 133; a circulation water line L110; blow means 136 and 138; a blow treatment control part; a proportional chemical injection control part for supplying a chemical agent of a charge amount proportional to execution time of blow treatment to circulation water W2 after executing the blow treatment; and an auxiliary chemical injection control part which when chemical agent supply by the proportional chemical injection control part is not executed yet after lapse of allowable stand-by time, supplies the chemical agent to the circulation water W2 during previously set charging time; and a storage part for storing data concerned with time of chemical agent supply by the chemical agent supply means. The auxiliary chemical injection control part sets time calculated on the basis of an execution interval of the past chemical agent supply treatment for latest n times which is executed by the chemical agent supply means and stored in the storage part as the allowable stand-by time.
    • 要解决的问题:提供能够在辅助化学喷射处理中适当的时间提供化学试剂的水处理系统。解决方案:水处理系统包括:冷却塔120; 化妆水线L120; 化学试剂供给装置134; 水质检测装置133; 循环水管线L110; 吹风装置136和138; 吹风处理控制部; 比例化学喷射控制部件,用于在执行吹风处理之后向与循环水W2供给与喷吹处理的执行时间成比例的计量量的化学试剂; 以及辅助化学品喷射控制部,当在经过允许的待机时间之后,当比例化学喷射控制部的化学试剂供给不被执行时,在预先设定的充电时间内将化学试剂供给到循环水W2; 以及存储部,用于存储与化学试剂供给装置的化学药剂供给时间有关的数据。 辅助化学品注入控制部分根据由化学试剂供给装置执行的最近n次的过去的化学剂供给处理的执行间隔计算并存储在存储部中作为可允许待机时间来计算时间。
    • 3. 发明专利
    • Water treatment system
    • 水处理系统
    • JP2014061494A
    • 2014-04-10
    • JP2012208882
    • 2012-09-21
    • Miura Co Ltd三浦工業株式会社
    • WATABE TOSHITOSATO HAJIMEMITSUMOTO HIROYUKIIWAMOTO KENSUKEMANABE ATSUYUKI
    • C02F1/00C02F1/50C02F5/00F28G13/00
    • PROBLEM TO BE SOLVED: To provide a water treatment system that suppresses wasteful consumption of a chemical agent by blowing processing executed during chemical-feeding processing.SOLUTION: A water treatment system includes: industrial equipment; chemical agent supply means 134; water quality detection means 133; flow rate detection means 135; blowing means; a blowing processing control part 201; a chemical agent supply control part 202; and a storage part 300. The chemical agent supply control part 202 (i) makes chemical agent supply processing stand by during execution of blowing processing and executes the chemical agent supply processing after execution of the blowing processing so as to supply the industrial equipment with a chemical agent of the necessary charge amount caused by the blowing processing, and (ii) if next blowing processing is executed during execution of the chemical agent supply processing, interrupts execution of the chemical agent supply processing and executes the chemical agent supply processing after execution of the next blowing process so as to supply the industrial equipment with the chemical agent of the total amount of the charge amount which is not supplied to the industrial equipment in the chemical agent supply processing and the necessary charge amount caused by the next blowing processing.
    • 要解决的问题:提供一种水处理系统,其通过在化学进料处理期间执行的吹塑加工来抑制化学试剂的浪费的消耗。解决方案:水处理系统包括:工业设备; 化学药剂供给装置134; 水质检测装置133; 流量检测装置135; 吹 吹风处理控制部201; 化学试剂供给控制部202; 以及储存部300.药剂供给控制部202(i)在执行吹塑加工时使化学试剂供给处理置换,并且在执行吹塑加工之后执行化学试剂供给处理,以便向工业设备供应 由吹塑加工引起的必需电荷量的化学试剂,(ii)如果在执行化学药剂供给处理期间执行下一次吹制处理,则中断执行化学剂供给处理,并执行化学试剂供给处理 下一个吹制过程,以向工业设备提供化学试剂供应处理中没有提供给工业设备的充电量的总量的化学试剂和由下一个吹制处理引起的必要的充电量。
    • 4. 发明专利
    • Water treatment system
    • 水处理系统
    • JP2014061493A
    • 2014-04-10
    • JP2012208881
    • 2012-09-21
    • Miura Co Ltd三浦工業株式会社
    • WATABE TOSHITOSATO HAJIME
    • C02F1/00C02F1/50C02F5/00F28G9/00F28G13/00
    • PROBLEM TO BE SOLVED: To provide a water treatment system that suppresses wasteful consumption of a chemical agent by blowing processing started during execution of halted chemical-feeding processing.SOLUTION: A water treatment system includes: industrial equipment; chemical agent supply means 134; water quality detection means 133; blowing means; a blowing processing control part 201; and a chemical agent supply control part 202 which executes chemical agent supply processing in the chemical agent supply means 134 so as to supply the industrial equipment with a chemical agent of the necessary charge amount at the execution timing when the chemical agent supply processing does not overlap blowing processing. If the blowing processing is executed before the chemical agent supply processing is finished, the chemical agent supply control part 202 halts execution of the chemical agent supply processing and, after execution of the blowing processing, executes the chemical agent supply processing so as to supply the industrial equipment with the chemical agent of the charge amount which is not supplied to the industrial equipment due to halt of the chemical agent supply processing or the chemical agent of the total amount of the charge amount which is not supplied to the industrial equipment due to halt of the chemical agent supply processing and the necessary charge amount caused by execution of the blowing processing.
    • 要解决的问题:提供一种水处理系统,其通过在停止的化学进料处理的执行期间开始的吹塑加工来抑制化学试剂的浪费消耗。解决方案:水处理系统包括:工业设备; 化学药剂供给装置134; 水质检测装置133; 吹 吹风处理控制部201; 以及化学试剂供给控制部202,其在化学试剂供给装置134中执行化学试剂供给处理,以便在化学试剂供给处理不重叠的执行时刻向工业设备供给必需的量的化学试剂 吹制加工。 如果在化学剂供给处理完成之前执行吹制处理,则化学试剂供给控制部202停止执行化学试剂供给处理,并且在执行吹塑处理之后,执行化学试剂供给处理,以供应 由化学药品供应处理或化学药剂停止而未向工业设备供应的化学试剂的化学试剂的工业设备,由于停止而未向工业设备供应的充电量总量 的化学剂供给处理以及由执行吹制处理引起的必要的充电量。
    • 5. 发明专利
    • Water treatment system and treatment method of cooling system circulating water
    • 冷水系统循环水处理系统及处理方法
    • JP2010194402A
    • 2010-09-09
    • JP2009039393
    • 2009-02-23
    • Miura Co Ltd三浦工業株式会社
    • WATABE TOSHITO
    • C02F1/50C02F1/46C02F1/76
    • PROBLEM TO BE SOLVED: To inhibit corrosion and the like of piping by constantly keeping the free residual halogen concentration in circulating water within an appropriate range to maintain the disinfecting action of a halogen aqueous solution.
      SOLUTION: When ORP is reduced to a predetermined lower limit value or lower and a predetermined time has elapsed since the previous injection of NaClO sodium chlorate, production of NaClO is started. After a predetermined amount of NaClO is produced, NaClO is injected into the circulating water (S1→S2→S3→S4→S5). When ORP is increased to a predetermined upper limit value or higher before injecting the whole amount of NaClO (S6→S7), injection of NaClO is stopped, and NaClO is discharged from an electrolytic cell (S8→S9). When the whole amount of NaClO is injected, an injection completion signal is sent (S6→S10).
      COPYRIGHT: (C)2010,JPO&INPIT
    • 要解决的问题:通过不断将循环水中的游离残留卤素浓度保持在适当范围内以抑制卤素水溶液的消毒作用,抑制管道的腐蚀等。

      解决方案:当先前注射NaClO氯酸钠时,当ORP降低到预定的下限值或更低并且经过了预定时间时,开始生产NaClO。 在产生预定量的NaClO之后,将NaClO注入循环水(S1→S2→S3→S4→S5)。 在注入全部NaClO之前将ORP增加到规定的上限值以上(S6→S7)时,停止注入NaClO,从电解槽中排出NaClO(S8→S9)。 当注入全部NaClO时,发送注射完成信号(S6→S10)。 版权所有(C)2010,JPO&INPIT

    • 6. 发明专利
    • Operation control unit of circulating water system and method for operating circulating water system
    • 循环水系统的操作控制单元和循环水系统的运行方法
    • JP2010094624A
    • 2010-04-30
    • JP2008268970
    • 2008-10-17
    • Miura Co Ltd三浦工業株式会社
    • WATABE TOSHITO
    • C02F1/00C02F1/50C02F5/00C02F5/10C02F5/14F28G13/00
    • PROBLEM TO BE SOLVED: To avoid a phenomenon that the chemical agent injected in circulating water is immediately drained to be wastefully consumed while holding the concentration of the chemical agent in the circulating water to a proper range. SOLUTION: During non-draining periods T1 and T3, the chemical agent is injected in the circulating water at each time when a predetermined number of flow rate pulses are produced as shown in Fig.(b) and (c). Then, when electric conductivity reaches a first predetermined value E1 as shown by in Fig.(a), the circulating water rushes into a draining period T2 as shown by in Fig.(d). During this draining period T2, the injection of the chemical agent is prohibited while replenishing water is supplied to dilute the circulating water, and a part of the circulating water is drained from a blow pipe as blow water. Then, when electric conductivity lowers to a second predetermined value E2, the drainage of blow water is completed. On the other hand, the flow rate pulse during the draining period T2 is preliminarily counted, and the chemical agent is supplied and injected in the circulating water in the amount corresponding to the count value of the flow rate pulse after the elapse of the draining period T2. COPYRIGHT: (C)2010,JPO&INPIT
    • 要解决的问题:为了避免将循环水中注入的化学试剂立即排出而被浪费地消耗,同时将化学试剂的浓度保持在循环水中达到适当范围的现象。 解决方案:在非排水期T1和T3期间,如图(b)和(c)所示,当产生预定数量的流量脉冲时,化学试剂每次注入循环水中。 然后,如图(a)所示,当电导率达到第一预定值E1时,如图(d)所示,循环水流入排水周期T2。 在排水期间T2期间,为了稀释循环水,在补给水的同时禁止注入化学试剂,一部分循环水从吹管排出。 然后,当电导率降低到第二预定值E2时,完成吹风水的排放。 另一方面,在排水期间T2中的流量脉冲被预先计数,并将化学试剂供给并注入循环水中,其量与经过排水周期后的流量脉冲的计数值相对应 T2。 版权所有(C)2010,JPO&INPIT
    • 9. 发明专利
    • Water processing system
    • 水处理系统
    • JP2014062694A
    • 2014-04-10
    • JP2012208885
    • 2012-09-21
    • Miura Co Ltd三浦工業株式会社
    • WATABE TOSHITOSATO HAJIME
    • F28G13/00C02F1/00C02F1/50C02F5/00F28F19/00F28F19/01F28F27/00
    • PROBLEM TO BE SOLVED: To provide a water processing system that can suppress useless consumption of a medicine in chemical injection processing as much as possible, according to a distance between a blow position and a chemical injection position.SOLUTION: A water processing system includes: a cooling tower; medicine supply means 134; water quality detection means 133; a circulation water line; blow means 136; a blow processing control unit 201; a medicine supply control unit 202 that interlocks with blow processing to execute medicine supply processing so as to supply a medicine of a preset medicine injection required amount to makeup water or circulation water; and setting information acquisition means 400. On the basis of setting information acquired by the setting information acquisition means 400, the medicine supply control unit 202 executes any of control in which execution of the medicine supply processing is started simultaneously with execution of the blow processing in the blow means 136, and control in which the execution of the medicine supply processing after elapse of a delay time is started after the execution of the blow processing in the blow means 136 is started.
    • 要解决的问题:提供一种水处理系统,其可以根据吹塑位置和化学品喷射位置之间的距离尽可能多地抑制化学喷射处理中的药物的无用消耗。解决方案:水处理系统包括: 冷却塔; 药物供给装置134; 水质检测装置133; 循环水线; 吹风装置136; 吹制处理控制单元201; 药物供给控制单元202,其与吹塑处理联锁以执行药物供给处理,以便向补给水或循环水供应预设的药物注入量的药物; 和设定信息取得单元400.基于设定信息取得单元400取得的设定信息,药剂供给控制单元202执行与执行打印处理同时开始药物供给处理的执行的控制 吹风装置136,并且开始在吹奏装置136中执行吹奏处理之后开始经过延迟时间之后的药物供应处理的执行的控制。
    • 10. 发明专利
    • Medicine feeding device
    • 医药进料装置
    • JP2014061497A
    • 2014-04-10
    • JP2012208887
    • 2012-09-21
    • Miura Co Ltd三浦工業株式会社
    • WATABE TOSHITOSATO HAJIMEMANABE ATSUYUKI
    • C02F1/00C02F1/50C02F5/00F28C1/00F28F19/01F28G13/00
    • PROBLEM TO BE SOLVED: To provide a medicine feeding device capable of feeding a plurality kinds of medicines respectively by flow rate proportional medicine feed while suppressing the increase of equipment cost.SOLUTION: Disclosed is a medicine feeding device 5 connected with a flow rate detecting means 6, and comprises a first medicine feeding device 51 having primary terminal groups A to D capable of receiving pulse signals and secondary terminal groups a to d capable of transmitting pulse signals same as the pulse signals received at the primary terminal groups, and feeding a first medicine in an amount corresponding to the pulse signals received by the primary terminal groups A to D, and a secondary medicine feeding device 52 having the primary terminal groups A to D and the secondary terminal groups a to d same as those in the first medicine feeding device 51, and feeding the second medicine in an amount corresponding to the pulse signals received at the primary terminal groups A to D, the primary terminal groups A to D of the first medicine feeding device 51 are connected to a flow rate detecting means 6 by first wiring C2, and the primary terminal groups A to D of the secondary medicine feeding device 52 are connected to the secondary terminal groups a to d of the first medicine feeding device 51 by the second wiring C3 .
    • 要解决的问题:提供一种能够抑制设备成本增加而分别通过流量比例药物供给多种药物的药物输送装置。解决方案公开了一种与流量检测装置连接的药剂供给装置5, 如图6所示,包括具有能够接收脉冲信号的一次端子组A〜D的第一药物供给装置51和能够发送与在一次端子组接收的脉冲信号相同的脉冲信号的二次端子组a〜d, 药剂量相当于由一次端子组A〜D接收的脉冲信号的量,以及具有一次端子组A〜D的次级药物供给装置52以及与第一药剂供给相同的次级端子组a〜d 装置51,并且以对应于在主端子组A处接收的脉冲信号的量供给第二药物 至D时,第一药剂供给装置51的一次端子组A〜D通过第一配线C2与流量检测机构6连接,二次药物供给装置52的一次端子组A〜D与 通过第二配线C3将第一供药装置51的二次端子组a〜d分开。