    • 1. 发明专利
    • Method of collecting chips
    • 收集方法
    • JPS59124543A
    • 1984-07-18
    • JP23021882
    • 1982-12-29
    • Mitsui Eng & Shipbuild Co Ltd
    • TSUBOI TOMOMIFUKUSHIMA HIDESHIGEMITSUI TOSHIMASA
    • B23Q11/00
    • B23Q11/0046
    • PURPOSE:To efficiently collect chips made by processing, by putting the chips into a hopper under a processing base after the processing and by then sucking the chips to an ejector to send the chips to a collecting box without causing the chips to jam. CONSTITUTION:A workpiece is put on supports 3 on a spherical base 2 having the same spherical center as the workpiece. An edge preparation machine is run on a rail 4 around the workpiece to process the edge of the workpiece. After the processing, a lid 10 is removed from a chip hopper 9 provided nearly at the center of the spherical base 2 and an air ejector 11 is started for suction. Chips P made by the processing are thrown into the hopper 9 by a rake 12 or the like. Compressed air A is supplied to the air ejector 11 through a valve 15 from a pipe 14 fitted with a source valve 13, so that the chips P are sucked by the ejector and sent to a chip collecting box 6 through a pipe 16.
    • 目的:为了有效地收集加工制成的切屑,将加工后的芯片放入加工基地的料斗中,然后将芯片吸入喷射器,将芯片送入收集箱,不会导致芯片堵塞。 构成:将工件放置在具有与工件相同的球面中心的球形基座2上的支撑件3上。 边缘准备机在工件周围的导轨4上运行,以处理工件的边缘。 处理后,从设置在球形基座2的中心附近的切屑料斗9取下盖10,开始抽吸空气喷射器11。 通过加工制成的芯片P通过耙子12等投入到料斗9中。 压缩空气A通过阀15从装配有源阀13的管道14供给到空气喷射器11,使得芯片P被喷射器吸引并通过管道16被送到芯片收集箱6。
    • 2. 发明专利
    • Cutting method of sheet material
    • 切片材料的切割方法
    • JPS59187418A
    • 1984-10-24
    • JP6098883
    • 1983-04-08
    • Mitsui Eng & Shipbuild Co Ltd
    • TSUBOI TOMOMIMITSUI TOSHIMASA
    • B23D45/02B27B5/20
    • B23D45/021
    • PURPOSE:To efficiently cut off the plate of closing belt to be collected for a spherical tank, by fixing a cutting jig, to which a rail is mounted, to a predetermined position on a sheet material and allowing a self-propelled saw to run on the rail. CONSTITUTION:A sheet material 1 of aluminum is placed on a wooden bed 2. A cutting jig 5, to which a self-propelled saw 3 and a running rail 4 of the self- propelled saw are mounted, is fixed to a predetermined position on the material by an I-bolt 6 and a hanging metal fixture 8 and clamps 12. The sheet material 1 of aluminum is cut off by allowing the self-propelled saw 3 to run on the rail 4 further rotating a saw tooth 3A of the saw 3. Here the speed of cutting is suitably selected by a thickness or the like of the sheet material 1 of aluminum but set to a speed of about 1m/min.
    • 目的:为了有效地切除要收集的球形容器的封闭带板,通过将安装有导轨的切割夹具固定在片材上的预定位置,并允许自走锯在其上运行 铁路。 构成:将铝板材1放置在木床2上。安装有自行式锯的自走锯3和行进轨道4的切割夹具5固定在预定位置上 该材料由I型螺栓6和一个悬挂的金属夹具8和夹具12.铝的片材1通过允许自推进的锯3在导轨4上运行而进一步旋转锯的锯齿3A 这里,切割速度通过铝片材1的厚度等适当选择,但设定为约1m / min的速度。
    • 3. 发明专利
    • Method of converting rest for machining spherical shell
    • 用于加工球壳的方法
    • JPS59102545A
    • 1984-06-13
    • JP21002182
    • 1982-11-30
    • Mitsui Eng & Shipbuild Co Ltd
    • TSUBOI TOMOMIMITSUI TOSHIMASA
    • B23K37/04B23Q1/00B23Q1/01B23Q1/03B23Q1/74
    • B23Q1/032
    • PURPOSE:To enable economic machining and reduce the area of an occupied floor, by providing a spacer on the spherical top of a rest to fit a spherical part of a curvature radius different from that of a spherical shell, so that spherical shells different in radius of curvature can be machined by using the single rest. CONSTITUTION:A rest 1 is used to perform machining such as the edge preparation of the plate of a pressed spherical aluminum shell for a spherical tank. A spherical part A with a radius of curvature A is secured on the top of the rest 1 supported by pedestals 3 on an installation surface 2. A spacer 4 with a saw-tooth form is provided on the spherical part 1A of the rest 1. An attachment 5 having a spherical part 5A with a radius of curvature B is removably assembled on the spacer 4 to machine a spherical shell with the radius of curvature B. According to this constitution, spherical shells different in radius of curvature can be machined by using the single rest.
    • 目的:为了实现经济加工和减少占地面积,通过在休息的球形顶部设置间隔件以适应与球壳不同的曲率半径的球形部分,使得球壳的半径不同 的曲率可以通过使用单一的休息。 构成:使用休息1进行加工,例如用于球形罐的压制球形铝壳的板的边缘准备。 具有曲率半径A的球形部分A固定在由基座3支撑在安装表面2上的其余部分1的顶部上。在其余部分1的球形部分1A上设置有具有锯齿形状的间隔物4。 具有曲率半径B的球形部分5A的附件5可移除地组装在间隔件4上,以加工具有曲率半径B的球形壳体。根据该构造,可以通过使用不同曲率半径的球形壳体来加工 单休息。
    • 4. 发明专利
    • Method of bevelling spherical shell
    • 球形球的方法
    • JPS59161209A
    • 1984-09-12
    • JP3095783
    • 1983-02-28
    • Mitsui Eng & Shipbuild Co Ltd
    • TSUBOI TOMOMITAKEYAMA TETSUOTAKI KENICHIISHII YASUOMIYAKE HIROSHIMITSUI TOSHIMASA
    • B23C3/12B23Q33/00
    • B23C3/12B23Q33/00
    • PURPOSE:To enhance the working ability of bevelling of a spherical shell composing a spherical tank, by providing such an arrangement that, after a reference line and a locus line are marked on a bed having a concave spherical surface, upon bevelling of the spherical surface, rails are laid along the four sides of the spherical shell, and a bevelling machine is set on these rails. CONSTITUTION:Upon working, two reference lines X-X, Y-Y which are orthogonal together are marked on the surface of a bed 2 having a concave spherical surface with a radius of curvature which is larger than, by a predetermined length, the radius of curvature of a spherical shell 1 that are formed by press- working an aluminium plate to be worked. Then, using the cross point G of both reference lines as the original point, locus points P used to determine the positions where rails 4 on which a self-travelling type bevelling machine 3 travels, are set. With the use of the locus points P as a reference, the rails 4 are arranged along the four side outer periphery of the spherical shell 1 by means of a support 6, and the spherical surface 1 is disposed within an area surrounded by the rails 4, through a support 7. Thereafter, the four sides of the spherical shell 1 is subjected to the working of bevelling by a milling cutter in a working machine.
    • 目的:为了提高构成球形槽的球形壳的斜面加工能力,通过提供这样一种布置,使得在具有凹形球形表面的床上标记参考线和轨迹线之后,球面的斜面 ,轨道沿着球壳的四边铺设,并在这些轨道上设置倾斜机。 构成:工作时,两个正交在一起的参考线XX,YY标记在具有凹形球面的床2的表面上,曲面半径大于预定长度,曲率半径为 通过对要加工的铝板进行加压而形成的球形壳体1。 然后,使用两个基准线的交叉点G作为原点,设定用于确定自行式倾斜机3所行驶的轨道4行进的位置的轨迹点P. 通过使用轨迹点P作为基准,轨道4通过支撑体6沿着球壳1的四侧外周配置,球面1设置在被轨道4包围的区域内 然后通过工作机械中的铣刀对球壳1的四边进行倾斜加工。
    • 5. 发明专利
    • Production of spherical surface plate for working spherical shell
    • 生产用于工作球壳的球面表面板
    • JPS59125296A
    • 1984-07-19
    • JP23022182
    • 1982-12-29
    • Mitsui Eng & Shipbuild Co Ltd
    • TSUBOI TOMOMIMITSUI TOSHIMASA
    • B23K9/00B23K37/04
    • B23K37/0417
    • PURPOSE:To produce economically a spherical surface plate for working a large sized spherical shell with high accuracy by blocking and assembling the spherical surface plate which is manufactured dividedly to plural blocks on a stand and packing mortar and a resin therein after checking the accuracy thereof. CONSTITUTION:Plural base plates 1A pressed to a prescribed spherical surface are placed on flanges 1B and frame worked to the curved surface having the same curvature radius center as that of a spherical shell to be worked on a spherical surface plate 1, thereby constituting the surface plate 1. The surface plate 1 divided to a plurality to facilitate manufacture, transportation, installation, etc. is blocked and assembled, via stands 2, sloped liners 3 and steel plate bases, 7, etc. on a concrete stand 4 formed on an installing floor surface 6 after centering and leveling. The flanges 1B and frame are mounted to the stands 2 prior to installation of the base plates 1A and thereafter the spherical surface is measured and adjusted, then the plates 1A are mounted. Mortar and resin are injected through injecting holes 8 into the space after assembly of the plate 1 and check of the accuracy.
    • 目的:为了经济地生产球面板,通过在检查其精度之后,通过阻挡和组装在支架和包装砂浆和树脂上划分制成多个块的球面板,高精度地加工大型球壳。 构成:将压制在规定的球面上的多个基板1A放置在凸缘1B上,将框架加工成与要加工在球面板1上的球壳相同的曲率半径中心的曲面上,从而构成表面 通过支架2,倾斜衬垫3和钢板基座7等将表面板1分割成多个以便于制造,运输和安装等,在形成在板材1上的混凝土支架4上被封闭和组装 安装地板表面6后定心和调平。 凸缘1B和框架在安装基板1A之前安装到支架2上,然后测量和调节球面,然后安装板1A。 砂浆和树脂在组装板1之后通过注入孔8注入空间并检查精度。