热词
    • 1. 发明专利
    • EMERGENCY WORKING DEVICE
    • JPS5799221A
    • 1982-06-19
    • JP17375680
    • 1980-12-11
    • MITSUBISHI HEAVY IND LTDMITSUBISHI ELECTRIC CORP
    • NAGANO OSAMUOKADA MASANOBUYAMADA SHIGENOBUSHINOHARA KOUICHI
    • F01K13/02F01K13/00
    • PURPOSE:To prevent a linked tripping of the whole plant at the time of occurrence of a trouble anywhere in a generating plant, which has two or more boilers, turbines and generator machines and feeds a varying amount of power, by furnishing an emergency working device separate from the controller of conventional type. CONSTITUTION:This emergency working device is composed of an expected load calculator 5 to put out the regular load upon receiving an emergency input signal 4 from the plant 2, a turbine load and air bleeding calculating/setting device 8 to set a target value for the turbine output and the amount of bled air, and load selecting and shutoff setting device 9 to set the shutoff of the air bleeding and electric load in accordance with the sort of emergency. Further this is equipped with a steam balance calculator 10, a air bleeding mode calculator 11, a by-pass valve opening/closing calculator 12, a boiler evaporation calculator 13, a relay setting signal generator 14 whose input is connected with the outputs of the turbine load and air bleeding/setting device 8 and the load selecting and shutoff setting device 9, and an emergency action signal generator 15 connected with the inputs to the plant 2.
    • 3. 发明专利
    • ASH DISPERSING NOZZLE STRUCTURE
    • JPS6057117A
    • 1985-04-02
    • JP16608883
    • 1983-09-09
    • MITSUBISHI HEAVY IND LTD
    • OKADA MASANOBUKOGA KATSUHIRO
    • F23J3/02
    • PURPOSE:To prevent accumulation of ash, by a method wherein ash dispersing nozzles are mounted to a spot where stagnation is apt to be created in a flow within a flue duct and a spot where a velocity of flow is low and ash is apt to be accumulated, and the air is injected in a way to vary the direction of injection. CONSTITUTION:Valves 14 are attached to air pipings 13 branched from an air main pipe 15, and a flexible hose 12 is connected to a nozzle 3 by means of a coupling 11. Therefore, with the valves 14 opened, the air is injected through an injection hole 5 in a nozzle 3, and ash 2 is dispersed to the wake flow side. The injection holes in the nozzle 3 are about 1-4 in number to increase an injection speed and therefore, the air may be injected over the range of 360 deg. in order to fly the ash effectively. A handle 7 is attached to the nozzle 3 which is connected to a piping 13 by means of the flexible hose 12, and this enables rotation of the nozzle 3 by means of the handle 7.
    • 4. 发明专利
    • Leakage detecting method of pipe in heat exchanger
    • 热交换器管道泄漏检测方法
    • JPS59125036A
    • 1984-07-19
    • JP23426282
    • 1982-12-29
    • Mitsubishi Heavy Ind Ltd
    • OKADA MASANOBUKOGA KATSUHIROFUJII KUNIHIKO
    • F28F1/00G01M3/04G01M3/20G01M3/22
    • G01M3/228
    • PURPOSE:To detect whether leakage of a pipe of an additional heater exists or not without stopping an operation of a thermal power plant, by injecting a chemical in the course of a water supply of a high pressure side fluid, varying concentration of the chemical, and measuring the concentration of the chemical some time later at a drain side of a low pressure side fluid. CONSTITUTION:A chemical being a marking substance to be mixed to feed-water in a feed pipe 14 is stored in a chemical tank 3. The chemical in the tank 3 is injected into the feed-water of an inlet side of an additional heater 8 by operating an injection pump of chemical 4. When the injecting quantity of the chemical is varied by stepwise variation of the stroke of the injection pump 4, concentration of the chemical in the feed-water is varied stepwise. As soon as the chemical is injected, concentration of the chemical in a drain is analyzed continuously by analyzing devices 6, 7 of the drain side. If leakage occurs in the pipe for separating the feed-water and the drain in the additional heater 8, the chemical is detected soon by the analyzing device 6 or 7.
    • 目的:为了检测是否存在附加加热器的管道泄漏,而不停止火力发电厂的运行,通过在高压侧流体的供水过程中注入化学物质,化学品的浓度变化, 并且稍后在低压侧流体的排水侧测量化学品的浓度。 构成:将在进料管14中与进料水混合的标记物质的化学品储存在化学罐3中。将罐3中的化学物质注入附加加热器8的入口侧的给水中 通过操作化学品4的注射泵。当通过注射泵4的行程的逐步变化来改变化学品的注入量时,进料中的化学物质的浓度是逐步变化的。 一旦化学品被注入,就通过分析排水侧的装置6,7来连续分析排水管中化学物的浓度。 如果在用于分离附加加热器8中的给水和排水管的管道中发生泄漏,则分析装置6或7很快检测到化学物质。