会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 3. 发明专利
    • CONSTRUCTION METHOD BY THRUSTING WORKS FOR COMPLEX CABLE STAGED BRIDGE
    • JPH05331810A
    • 1993-12-14
    • JP16384492
    • 1992-05-30
    • MAEDA CONSTRUCTION
    • YOSHIDA YOJIROUEDA TATSUYA
    • E01D11/00E01D11/04E01D21/00E01D21/04
    • PURPOSE:To construct a multi-span complex cable staged bridge with its construction term shortened and also with cost lowered by means of thrusting works. CONSTITUTION:A required number of bridge piers 2 and 2' are constructed at a side span, and a first leading prestressed concrete girder block 5a is fabricated at a fabrication yard 4 provided for the end zone of an erection block. A steel launching girder 6 is mounted onto the aforesaid leading prestressed concrete girder block 5a, and is thrusted ahead over the bridge piers 2 and 2' along the side span so as to be mounted over a feed frame 3, so that a plural number of prestressed concrete girders 5b, 5c, 5d... are continuously and integrally fabricated in the fabrication yard 4 in such a way as to be in pursuit of the leading prestressed concrete girder block 5a in order. Whenever each prestressed concrete girder block 5b and 5c, 5d... is fabricated so as to be extended, it is thrusted ahead, and is advanced so as to be moved over the respective feed frames 3. And after the launching girder 6 has passed a main tower 1, a mounting girder 6b at the base end of the launching girder 6 is left over as is, meanwhile, a leading launching girder main body 6a is demolished so as to be removed. After that, a steel girder 8 for a central span is erected from the tip end of the mounting girder 6b while being supported by a hanging diagonal member 7 stretched in a space interspaced from the main tower 1.