会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 4. 发明专利
    • CURTAIN GROUTING METHOD
    • JPH1018281A
    • 1998-01-20
    • JP17378396
    • 1996-07-03
    • MAEDA CONSTRUCTION
    • INOUE HIROYUKITAKAHASHI HIROSHI
    • E02D3/12
    • PROBLEM TO BE SOLVED: To prevent useless drilling and reduce a construction period and construction cost by measuring specific resistance of a boring hole, finding a prediction degree of permeability at a position separated from the boring hole, comparing it with a really measured degree of the permeability and judging application of the predicted degree of the permeability. SOLUTION: A grouting agent 12 such as cement grout is pressed in many boring holes 11 drilled in a row at prescribed interval L in ground 10. At the time, the grouting agent 12 is grouted in the ground 10 from the side wall of the boring hole 11 to be widened, and solidified in a continuous state to form a curtain-like impervious film 1. Furthermore, water is prevented from intruding and leaking in the ground 10 through the impervious film 1. The specific resistance of the boring hole 11 is measured in a test section area provided in a previously forming range of the impervious film 1, and a prediction degree of permeability is found at a position separated from the boring hole 11 by the specific resistance. It is compared with a really measured degree of the permeability, the application of the prediction degree of the permeability is judged, and the intervals of the boring holes 11 in the execution area judged as the application are determined on the basis of the prediction degree of the permeability.
    • 6. 发明专利
    • SOUNDNESS CHECKUP METHOD FOR PILE FOUNDATION
    • JPH09310369A
    • 1997-12-02
    • JP13020596
    • 1996-05-24
    • MAEDA CONSTRUCTION
    • TAKAHASHI HIROSHI
    • E02D33/00G01N33/38
    • PROBLEM TO BE SOLVED: To identify sizes and positions of cracks at a low cost by a method wherein Lugeon tests are performed at fixed intervals, utilizing a bore bored to a pile from its upper end toward the lower side, and the crakcs are idnetified, based on the results of the tests. SOLUTION: A bore 3 is bored by boring to a pile, extending from the center at the upper end 2 of the pile toward its lower side. The bore 3 to be bored to the pile 1 shall be small in diameter so that it may not spoil performance (strength or the like) of the pile 1. In the case where a bore is originally provided at a pile 1, the existing bore is used as it is. Lugeon test, a test for checking permeability at a ground or the like, is performed at fixed intervals, and positions and sizes of cracks 4 are identified, based on the results of the tests. Thereby, cracks not only at the periphery of a wall of the bored hall, but also at positions piercing through dominant sections against the soundness of the pile can be identified for their sizes and positions. Distribution density of the cracks can also be found.
    • 7. 发明专利
    • METHOD FOR INSTALLING WATERPROOF SHEET ON CAST IN SITU DIAPHRAGM WALL
    • JPH04272326A
    • 1992-09-29
    • JP5608991
    • 1991-02-27
    • MAEDA CONSTRUCTION
    • KAYAMA YASUHARUAKASAKA YUJITAKAHASHI HIROSHI
    • E02D5/20E02D31/02
    • PURPOSE:To install a waterproof sheet in the water stop condition with fittings at the same time when a reinforcing bar basket is installed. CONSTITUTION:A waterproof sheet 8 is installed to a side hardware 7 disposed at the side edge of right and left fittings 2, 2 at the outside of a leading element wall body 6 of an underground structure, the sheet adhering at the right and left edges beforehand. The waterproof sheet 8 is put into an excavated groove 1 integrally with the fitting 2, 2 at the same time when the fittings 2, 2 are installed Between the right and left fittings 2, 2 in an excavated groove 1', a reinforcing bar basket 9, in which a vertically long guide side frame 11 disposed at the right, and left edges of waterproof sheet 12 is installed in such a manner as to move back and forth and right and left, is installed at the right and left ends of external surface positioning at the outside of trailing element wall body 10 of an underground structured. When the reinforcing bar basket 9 is installed, the guide side frame 11 is put into the excavated groove 1' together with the waterproof sheet while connecting via side hardware 7' disposed at the side edge of fitting 2, 2 and a cut-off joint 15.