会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 1. 发明专利
    • Construction device and construction method of multi-layered building structure
    • 多层建筑结构的施工设备及施工方法
    • JP2005171593A
    • 2005-06-30
    • JP2003411770
    • 2003-12-10
    • Kitagawa Iron Works Co LtdMaeda Corp前田建設工業株式会社株式会社北川鉄工所
    • IMAMURA TERUTAKESUGIMOTO YOSHINOBUSO NAGAYOSHITOMA KEIZOAKIYAMA NAOICHIHIRAKAWA RYUICHITOKUNAGA SHINSAKUKAWAMOTO KIYOMICHI
    • E04G21/16
    • PROBLEM TO BE SOLVED: To provide a construction device and a construction method of a multi-layered building structure capable of reducing a construction cost by promoting working efficiency, even at a place with little construction space, such as a narrow ground or the like.
      SOLUTION: The construction device of the multi-layered building structure movable in the horizontal direction is equipped with a first crane 3 constructing a skeleton, by assembling building members and a lifting and lowering device 1 conveying the first crane 3 and the building members in the vertical directions; and the lifting and lowering device 1 is equipped with a mast 11, erected by adjoining the building structure required to construct and a planar platform 12 rising and falling along the mast 11 and mounting the first crane 3 thereon, and a second crane 14 provided to the planar platform 12 and conveying the building members in the vertical directions and the horizontal directions.
      COPYRIGHT: (C)2005,JPO&NCIPI
    • 要解决的问题:提供一种能够通过提高工作效率而降低施工成本的多层建筑结构的施工装置和施工方法,即使在具有较小建筑空间的地方,例如窄地面或 类似。 解决方案:可在水平方向移动的多层建筑结构的施工装置配备有通过组装建筑构件构成骨架的第一起重机3和传送第一起重机3和建筑物的升降装置1 会员垂直方向; 升降装置1配备有通过毗邻建筑物所需的建筑结构而竖立的桅杆11和沿着桅杆11上升和下落的平台12,并且将第一起重机3安装在其上,第二起重机14设置成 平面平台12,并在垂直方向和水平方向上输送建筑构件。 版权所有(C)2005,JPO&NCIPI
    • 2. 发明专利
    • Construction method of building skeleton
    • 建筑施工方法
    • JP2006188842A
    • 2006-07-20
    • JP2005000149
    • 2005-01-04
    • Kitagawa Iron Works Co LtdMaeda Corp前田建設工業株式会社株式会社北川鉄工所
    • ONO HIROYUKISUGIMOTO YOSHINOBUSO NAGAYOSHIYAMASHITA JUNICHIROIMAMURA TERUTAKEHIRAKAWA RYUICHITOKUNAGA SHINSAKUKAWAMOTO KIYOMICHI
    • E04G21/14
    • PROBLEM TO BE SOLVED: To shorten a construction period by efficiently constructing a building skeleton composed of precast members.
      SOLUTION: A mast is fixed to the precast member of a constructed story, and a mast is added to extend to a predetermined height. A crane body is lifted up to the predetermined height along the mast to carry out erection around the crane body, and a travel frame is installed at the erected precast members through a travel rail. The mast is released from fixing and pulled up, and the added mast is removed for climbing. While laying the travel rail from the climbing position toward an end part, the travel rail is advanced, or while retreating the laid travel rail from the end part toward the climbing position, the travel rail is removed to carry out erection of a story to be constructed. These processes are repeated to sequentially construct the building skeleton from the lower story to the upper story.
      COPYRIGHT: (C)2006,JPO&NCIPI
    • 要解决的问题:通过有效地构建由预制构件构成的建筑物骨架来缩短施工周期。 解决方案:桅杆被固定到构造的故事的预制构件上,并且添加桅杆以延伸到预定高度。 起重机主体沿着桅杆被提升至预定的高度,以便在起重机主体周围进行架设,行走架通过行驶轨道安装在竖立的预制构件上。 桅杆从固定和拉起释放,并且添加的桅杆被移除用于攀登。 在将行驶轨道从攀爬位置朝向端部放置时,行驶轨道前进,或者将铺设的行驶轨道从端部部分撤回到攀爬位置,行走轨道被拆除以进行故事的架设 建。 重复这些过程,以从低层故事到上层故事依次构建建筑骨架。 版权所有(C)2006,JPO&NCIPI
    • 4. 发明专利
    • Spraying method and spraying device
    • 喷涂方法和喷涂装置
    • JP2006307629A
    • 2006-11-09
    • JP2006011401
    • 2006-01-19
    • Kitagawa Iron Works Co LtdNishimatsu Constr Co Ltd株式会社北川鉄工所西松建設株式会社
    • KONDO MISAKANISHIDA HIDENORIOGURI TOSHIOTAGUCHI TAKESHIBANDAI TOMOYAHASEBE HIROYUKIMINATO YASUHIROHIRAKAWA RYUICHITOKUNAGA SHINSAKUKAWAMOTO KIYOMICHIYUCHI YUJI
    • E02D17/20
    • PROBLEM TO BE SOLVED: To provide a spraying method and a spraying device capable of spraying work of a spraying material to a huge slope face.
      SOLUTION: This spraying method repeats a process of spraying the spraying material on a first small step part 102, a second small step part 104 and a gradient part 103 between these parts by arranging a frame 10 for movably holding a spraying nozzle 56 of the spraying material in the substantially parallel direction to the slope face so as to straddle up to the second small step part 104 from the first small step part 102 by forming a multistage slope face 100 for alternately continuing the gradient parts 101, 103, 105, etc. and the small step parts 102, 104, 106, etc., a process of moving the frame 10 along the first small step part 102 and the second small step part 104, and a process of arranging the frame 10 so as to straddle up to the third small step part 106 from the second small step part 104 by moving the frame 10 in the gradient direction of the multistage slope face 100.
      COPYRIGHT: (C)2007,JPO&INPIT
    • 要解决的问题:提供一种喷涂方法和喷涂装置,其能够将喷涂材料的工作喷洒到巨大的坡面上。 解决方案:该喷涂方法重复将喷涂材料喷涂在这些部件之间的第一小台阶部分102,第二小台阶部分部分104和梯度部分103上,通过布置用于可移动地保持喷嘴56的框架10 通过形成用于交替地连续梯度部分101,103,105的多级倾斜面100,从而与第一小台阶部102跨越直到第二小阶梯部10​​4的倾斜面大致平行的方式 小台阶部102,104,106等,沿着第一小阶梯部10​​2和第二小阶梯部10​​4移动框架10的处理,以及将框架10排列成 通过在多级斜面100的梯度方向上移动框架10,从第二小阶梯部分104跨越第三小阶梯部分106。(C)2007,JPO&INPIT