会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 1. 发明专利
    • Pier construction of structure
    • 建筑结构
    • JP2006207129A
    • 2006-08-10
    • JP2005016690
    • 2005-01-25
    • Kawada Industries IncSato Kogyo Co LtdWakachiku Construction Co Ltd佐藤工業株式会社川田工業株式会社若築建設株式会社
    • TSUJINO SHUICHITAKEI SHIYUUEINABEYA MASASHINAGAFUJI MASAZUMINAKAYAMA HISASHIFUKUSHIMA KENJISASAKI HIDETOMOMUNEMURA MOTOHIROKIRIYAMA SHINOBU
    • E01D19/02E01C1/04
    • PROBLEM TO BE SOLVED: To provide a pier construction of a structure capable of simplifying a construction of a joint section between a pile head section and a pier column base section, carrying out construction work at a low cost in a state to save labor while absorbing slippage of the core of a pile and successively carrying out immediately the positioning of a pier and a superstructure work erection process without awaiting time after a pile body has been made.
      SOLUTION: The construction of the joint section connecting the head section of the pile 2 to the column base section of the steel-made pier 3 comprises a group of a plurality of anchor bolts 6 burying the lower end sides in the pile head section, the first stage holding member 7 placed in a state to adjust a height position in the Z direction to screw sections of the group of anchor bolts, the second stage holding member 9 mounted on the upper surface of the first stage holding member 7 in a state to adjust a position in X-Y plane and a plurality of fitting metal fasteners 10, etc. interconnecting the first stage holding member 7 to the second stage holding member 9, and it is so constituted that a steel-made pier base section 3A is connected to the upper surface of the second stage holding member 9 with a bolt and that an encased concrete 5 is placed around the steel-made pier 3 including the joint section.
      COPYRIGHT: (C)2006,JPO&NCIPI
    • 要解决的问题:为了提供能够简化桩头部分和墩柱基部之间的接合部分的结构的结构的墩架结构,在节省的状态下以低成本进行施工作业 同时吸收堆芯的滑动,并且在桩体已经制成之后不等待时间,并且立即执行码头的定位和上层建筑工作架设过程。

      解决方案:将桩2的头部连接到钢制墩3的柱基部的接合部的结构包括多个锚固螺栓6的一组,其将下端侧埋入桩头 第一级保持构件7处于状态以调整Z方向的高度位置以使锚定螺栓组的螺旋部分,安装在第一级保持构件7的上表面上的第二级保持构件9 调整XY平面中的位置的状态以及将第一阶段保持构件7与第二阶段保持构件9相互连接的多个嵌合金属固定件10等构成,钢制墩架基部3A为 通过螺栓连接到第二级保持构件9的上表面,并且将包裹的混凝土5放置在包括接合部的钢制墩3周围。 版权所有(C)2006,JPO&NCIPI