会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 4. 发明专利
    • Shearing force reinforcing method
    • 剪力加固方法
    • JP2005105808A
    • 2005-04-21
    • JP2004215697
    • 2004-07-23
    • Taisei Corp大成建設株式会社
    • TANAKA YOSHIHIROCHIYOU IKENOTOMO TAKESHIHORIGUCHI KENICHI
    • E04G23/02
    • PROBLEM TO BE SOLVED: To provide a shearing force reinforcing method for an existing RC structure capable of easily and surely securing the predetermined drawing rigidity.
      SOLUTION: This method of reinforcing an existing RC structured surface material or panel material, to which shearing force is to be applied, comprises following processes. (1) A reinforcing member insert hole boring process for forming a reinforcing member insert hole 10 to provide a shearing reinforcing member 20 inside thereof from one side to the other side of an existing reinforced concrete surface material or panel material. (2)A process for filling the reinforcing member insert hole 10 with a filling material 30. (3)A process for inserting the shearing reinforcing member 20, which is provided with a shearing reinforcing bar 21 and fixing members 22 and 23 provided in a tip and a base part of the shearing reinforcing bar 21 and having cross sections larger than that of the shearing reinforcing bar 21, into the reinforcing member insert hole 10.
      COPYRIGHT: (C)2005,JPO&NCIPI
    • 要解决的问题:提供一种能够容易且可靠地确保预定拉伸刚度的现有RC结构的剪切力增强方法。 解决方案:加强要施加剪切力的现有RC结构化表面材料或面板材料的这种方法包括以下过程。 (1)一种用于形成加强件插入孔10的加强件插入孔钻孔工艺,以从现有的钢筋混凝土表面材料或镶板材料的一侧到另一侧在其内部提供剪切加强件20。 (2)一种用填充材料30填充加强构件插入孔10的方法。(3)一种插入剪切加强构件20的方法,该剪切加强构件20设置有设置在其中的剪切钢筋21和固定构件22和23 尖端和剪切钢筋21的基部,并且横截面大于剪切钢筋21的横截面。进入加固件插入孔10中。(C)2005,JPO&NCIPI
    • 6. 发明专利
    • SHIELD TUNNEL CONNECTING METHOD
    • JP2002030898A
    • 2002-01-31
    • JP2000215012
    • 2000-07-14
    • TAISEI CORP
    • TANAKA YOSHIHIROKANO KOICHICHIYOU IKEN
    • E21D13/02E21D11/04
    • PROBLEM TO BE SOLVED: To provide a shield tunnel connecting method capable of easily absorbing a positional displacement between shield tunnels for connection without generating a weak point of the structure. SOLUTION: The highest part and the lowest part of an end support 1 provided at an end of a tunnel are formed with a receiver frame 8 opened in front and rear thereof in relation to the tunnel progressing direction. On the other hand, a connecting member 9 is formed of a connecting steel material 91 and an end plate 92 fixed to the end thereof. The connecting member 9 is arranged between the receiver frames 8 in both sides of the tunnel in a direction crossing the tunnel progressing direction, and the other connecting member 9 is similarly arranged at the opposite position, and both the connecting members are unified with each other by a bolt 95a. A flexible bag body 10 housing a spacer 11 is inserted into a space formed by the end plate 92 and the receiver frame 8, and the inside of this bag body 10 is filled with the filling material 98.