    • 1. 发明专利
    • Construction method for storage tank
    • 储存罐施工方法
    • JP2014118211A
    • 2014-06-30
    • JP2012277156
    • 2012-12-19
    • Ihi Corp株式会社Ihi
    • SHINOZAKI YUKIOSUGITANI MASAHIKO
    • B65D88/06
    • PROBLEM TO BE SOLVED: To provide a construction method for a storage tank, which shortens a construction period of tank equipment, which suppresses upsizing of heavy equipment, and which reduces the number of installed pieces of the heavy equipment.SOLUTION: A construction method for a storage tank having a bottom, a side wall and a roof includes: a bottom forming step of forming the bottom; a tower crane installation step of installing a tower crane 10 on the bottom; a side wall forming step of forming the side wall by using the tower crane 10; and a roof forming step of forming the roof on the side wall.
    • 要解决的问题:提供一种储罐的施工方法,其缩短了罐装设备的施工周期,抑制了重型设备的大型化,并减少了重型设备的安装件数量。解决方案:一种施工方法 具有底部,侧壁和屋顶的储罐包括:形成底部的底部形成步骤; 将塔式起重机10安装在底部的塔式起重机安装步骤; 通过使用塔式起重机10形成侧壁的侧壁形成工序; 以及在侧壁上形成屋顶的屋顶成形步骤。
    • 2. 发明专利
    • Method for constructing ground type low temperature tank
    • 用于构造接地式低温罐的方法
    • JP2014084592A
    • 2014-05-12
    • JP2012232834
    • 2012-10-22
    • Ihi Corp株式会社Ihi
    • SHIOMI HIROSHINAKUMO SATORUSUGITANI MASAHIKO
    • E04H7/06B65D88/06
    • PROBLEM TO BE SOLVED: To provide a method for constructing a ground type low temperature tank, enabling a construction period to be shortened.SOLUTION: A method for constructing a ground type low temperature tank having a side wall part 4b, a roof part 4c, and a bottom slab part includes: a roof part forming step for forming the roof part; a slip form step for constructing the side wall part 4b by continuously placing concrete between concrete forms 11, 11 while lifting up the pair of concrete forms 11, 11 disposed opposite to each other, and lifting up the roof part 4c formed in the roof part forming step while supporting it by a support part 12 provided on the concrete forms; and a cold insulation treatment step for performing cold insulation treatment of the bottom slab part surrounded by the concrete forms 11, 11. The cold insulation treatment step is carried out in parallel with and during the slip form step.
    • 要解决的问题:提供一种用于构造地面型低温罐的方法,能够缩短施工周期。解决方案:一种用于构造具有侧壁部分4b,顶部部分4c, 底板部分包括:顶部部分形成步骤,用于形成屋顶部分; 用于通过将混凝土连续地混合在混凝土构件11,11之间,同时提升彼此相对设置的一对混凝土构件11,11,并且提升形成在屋顶部分中的顶部部分4c,来形成侧壁部分4b的滑动步骤 在通过设置在混凝土构件上的支撑部12支承的同时, 以及冷却绝缘处理步骤,用于对由混凝土结构11,11包围的底部板坯部分进行冷隔离处理。冷绝缘处理步骤与滑动步骤平行并在其中进行。