会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 1. 发明专利
    • Operation plan server and operation plan system
    • 操作计划服务器和操作计划系统
    • JP2011059968A
    • 2011-03-24
    • JP2009208821
    • 2009-09-10
    • Hitachi Ltd株式会社日立製作所
    • ADACHI SHINGOKURISU HIROMITSUTADOKORO HIDEYUKI
    • G06Q50/00G06Q50/26
    • PROBLEM TO BE SOLVED: To quickly make an operation plan of a large-scale system by supporting balancing a plurality of requests using a computer system. SOLUTION: The server includes: an operation condition storage part for storing an operation condition of a facility; an input part for receiving input of a parameter set by an operator; a planning part for making an operation plan based on the operation condition and the set parameter, and calculating an index of the operation plan; a history storage part for storing the index of the operation plan for each operation plan and information on the number of references showing the cumulative number of times that the operation plan is referred to; and an output part for displaying, to the operator, indexes of the plurality of operation plans and the information on the number of references of each operation plan stored in the history storage part, as a list. COPYRIGHT: (C)2011,JPO&INPIT
    • 要解决的问题:通过支持使用计算机系统平衡多个请求来快速制定大型系统的操作计划。 解决方案:服务器包括:操作条件存储部分,用于存储设施的操作条件; 用于接收由操作者设置的参数的输入的输入部分; 基于操作条件和设定参数进行操作计划的计划部件,计算操作计划的指标; 用于存储每个操作计划的操作计划的索引的历史存储部分和表示所述操作计划的累积次数的参考数量的信息; 以及用于向操作者显示多个操作计划的索引和存储在历史存储部分中的每个操作计划的参考数量的信息的输出部分作为列表。 版权所有(C)2011,JPO&INPIT
    • 2. 发明专利
    • Device, method and program for supporting operation disorder recovery
    • 用于支持操作障碍恢复的设备,方法和程序
    • JP2007099092A
    • 2007-04-19
    • JP2005291943
    • 2005-10-05
    • Hitachi Ltd株式会社日立製作所
    • SATO TATSUHIROSAKIKAWA SHUICHIROKURISU HIROMITSUKUROKAWA KOICHIRO
    • B61L27/00G06Q50/00G06Q50/30
    • PROBLEM TO BE SOLVED: To rapidly recover disorder of an operation of a transportation means about a technique for supporting an operation management job by a computer. SOLUTION: This operation disorder recovery support device includes a diagram correction part 111 for correcting a diagram which indicates an operation schedule and maintaining the progress in the middle, a provisional diagram preparation part 112 for comparing a time interval until a run time of a diagram change with the time required to arrange for the operation to select the diagram change being an object of warning, and preparing the provisional diagram being a temporary diagram used for correcting the operation schedule which indicates the schedule allocated to equipment and materials and crews to the diagram change in which the run time is early including the diagram change, an operation schedule correction part 113 for correcting the operation schedule and maintaining the progress in the middle, a correction request preparation part 114 for preparing the correction request for the provisional diagram, and a partial determining part 115 for determining the provisional diagram and the progress in the middle of the operation schedule as a formal plan. COPYRIGHT: (C)2007,JPO&INPIT
    • 要解决的问题:为了快速恢复运输装置的操作的无序性,关于用于支持计算机的操作管理作业的技术。 解决方案:该操作障碍恢复支持装置包括用于校正指示操作进度并保持中间进度的图的图示校正部111,用于比较直到运行时间为止的时间间隔的临时图准备部112 图表随着安排操作选择作为警告对象的图变化所需的时间而变化,并且准备临时图是临时图,用于将表示分配给设备和材料和机组的时间表的操作时间表 运行时间早的图表,包括图表改变的图表,用于校正操作调度并保持中间进度的操作调度校正部分113,用于准备临时图的校正请求的校正请求准备部分114, 以及用于确定临时图a的部分确定部分115 将运营计划中期的进度作为正式计划。 版权所有(C)2007,JPO&INPIT
    • 4. 发明专利
    • Pump control system
    • 泵控制系统
    • JP2013096311A
    • 2013-05-20
    • JP2011240230
    • 2011-11-01
    • Hitachi Ltd株式会社日立製作所
    • TAKAHASHI SHINSUKEADACHI SHINGOKURISU HIROMITSUTADOKORO HIDEYUKIYASUTOMI HIROYASU
    • F04B49/06F04D15/00
    • PROBLEM TO BE SOLVED: To provide a pump control system capable of maintaining the operation of a plurality of pumps at the optimum efficiency point even if the pump characteristics are degraded with the elapse of time by minimizing energy consumption by operating the plurality of pumps at the optimum efficiency point.SOLUTION: This pump control system for controlling the operation of a plurality of pumps includes a storage section which stores an operating pump quantity determination table in which the quantity of the pumps to be operated according to a distributed flow and a delivery pressure is determined and a flow distribution table in which the distribution of the distributed flow to each pump according to the quantity of the pumps, distributed flow, and delivery pressure is determined, an operating pump quantity determination section for determining the quantity of the pumps to be operated based on the distributed flow and delivery pressure, referring to the operating pump quantity determination table, a distributed flow calculation section for calculating the distribution of the distributed flow to each pump based on the quantity of the pumps to be operated and the distribution flow and delivery pressure determined by the flow distribution table, and a target rotational speed calculation section for setting the target rotational speed of each pump based on the quantity of the pumps to be operated which is stored in the operating pump quantity determination table and the distribution of the distributed flow to each pump obtained by the distributed flow calculation section.
    • 要解决的问题:提供一种泵控制系统,其能够将多个泵的操作保持在最佳效率点,即使随着时间的流逝使泵特性劣化,通过最小化能量消耗来最小化能量消耗 泵在最佳效率点。 解决方案:用于控制多个泵的操作的该泵控制系统包括:存储部,其存储操作泵数量判定表,在该存储部中,根据分配流量和输送压力要操作的泵的数量为 确定流量分配表,其中确定根据泵的数量,分配流量和输送压力向每个泵分配的流量的分配;操作泵数量确定部,用于确定要被操作的泵的数量 基于分配的流量和输送压力,参考操作泵数量确定表,分布式流量计算部分,用于基于要操作的泵的数量和分配流量和输送量来计算到每个泵的分布式流量的分布 由流量分配表确定的压力和目标转速计算 用于基于存储在操作泵数量确定表中的要被操作的泵的数量以及由分配流量计算部分获得的每个泵的分配流量的分布来设定每个泵的目标转速的部分。 版权所有(C)2013,JPO&INPIT
    • 5. 发明专利
    • Water operation planning device and system
    • 水操作规划设备和系统
    • JP2007102514A
    • 2007-04-19
    • JP2005291925
    • 2005-10-05
    • Hitachi Ltd株式会社日立製作所
    • DOJO YUUKAIFUKUMOTO YASUSHIKURISU HIROMITSUHARA NAOKI
    • G05B13/02
    • PROBLEM TO BE SOLVED: To calculate a planned value closer to a corresponding result value in operation planning of a conducting and supplying pipe network for public water supply by adding, as a determination condition for replanning, another determination condition to a condition in which the difference between planned value and result value exceeds a designated value. SOLUTION: The water operation planning device 133 comprises a demand prediction part for calculating a predicted demand based on an actual demand; a planning part for calculating a planned value by calculation for optimizing the flow rate of each conduit and the water quantity of a facility according to the predicted demand; and a replanning determination part determining whether the difference between the planned value and the result value corresponding thereto is within a predetermined allowable difference or not and whether the difference between the predicted demand and the actual demand corresponding thereto is within the predetermined allowable difference or not, and controlling the demand prediction part and the planning part to execute calculations for replanning when either of the differences is the allowable difference or more. COPYRIGHT: (C)2007,JPO&INPIT
    • 要解决的问题:为了在公用供水管网供电管网的运行规划中计算更接近于相应结果值的计划值,作为重新配置的确定条件,将另一个确定条件添加到 计划值和结果值之间的差异超过指定值。 解决方案:水处理计划装置133包括:根据实际需求计算预测需求的需求预测部; 根据预测的需求,通过计算计算每个管道的流量和设施的水量来计算计划值的计划部分; 以及重新确定部件,其确定所述计划值和与其对应的结果值之间的差是否在预定的可允许的差值内,以及所述预测需求与对应的实际需求之间的差是否在预定的可允许的差值之内, 并且当任何一个差是允许的差异或更多时,控制需求预测部分和规划部分执行重新计算的计算。 版权所有(C)2007,JPO&INPIT
    • 6. 发明专利
    • Water leakage detection apparatus
    • 水泄漏检测装置
    • JP2013178207A
    • 2013-09-09
    • JP2012043205
    • 2012-02-29
    • Hitachi Ltd株式会社日立製作所
    • MIYATA MAKOTOTAKAHASHI SHINSUKEADACHI SHINGOTADOKORO HIDEYUKIFUKUSHIMA MANABUKURISU HIROMITSU
    • G01M3/28
    • PROBLEM TO BE SOLVED: To provide a water leakage detection apparatus for estimating water leakage distribution in a water distribution block composing a water distribution pipe network and specifying water leakage in the water distribution block.SOLUTION: The water leakage detection apparatus for monitoring a state of the water distribution block includes: a data collection part for collecting flow rate values of a pipeline of an inlet of the water distribution block and pressure values of a plurality of joints on a main line of the water distribution block; a pipe network calculation part for estimating pressure values of joints of the whole water distribution block and a flow rate value of the pipeline; and a main line water leakage estimation part for estimating a virtual water leakage amount of the plurality of joints on the main line on the basis of a water leakage amount of the whole water distribution block, pressure values of the plurality of joints on the main line, which are collected by the data collection part, and the pressure values of the plurality of joints on the main line, which are estimated by the pipe network calculation part.
    • 要解决的问题:提供一种漏水检测装置,用于估计构成配水管网的配水块中的漏水分布,并指定配水块中的漏水。解决方案:用于监测配水管的状态的漏水检测装置 配水块包括:数据收集部,其用于收集分配块的入口的管道的流量值和分配块的主线上的多个接头的压力值; 管网计算部,用于估计整个分配块的接头的压力值和管道的流量值; 以及主线用水泄漏估计部,其基于整个分配块的漏水量来估计主线上的多个接头的虚拟漏水量,主线上的多个接头的压力值 ,由管网计算部估计的主线上的多个关节的压力值。
    • 7. 发明专利
    • Water treatment management system and water treatment management server
    • 水处理管理系统和水处理管理服务器
    • JP2011190663A
    • 2011-09-29
    • JP2010060123
    • 2010-03-17
    • Hitachi LtdHitachi Plant Technologies Ltd株式会社日立プラントテクノロジー株式会社日立製作所
    • KURISU HIROMITSUHANAOKA HIROSHITADOKORO HIDEYUKIOKUMA NAOKI
    • E03B1/00C02F1/00G06Q50/00G06Q50/26
    • PROBLEM TO BE SOLVED: To solve a problem wherein there is a risk of affecting preservation of water environment in a city area because utilization of recycled water from drainage and optimization of treatment of discharge water are impeded due to a difficulty in adjustment between entrepreneurs related to a water source. SOLUTION: A water environmental information center integrally manages information on entrepreneurs who take water from the water source, entrepreneurs who discharge water to the water source, and the water source, and distributes an operation plan of recycled water and an operation support proposal of a water treatment facility to related entrepreneurs. Each related entrepreneur is provided with a means for collecting information on water utilization and water treatment and transmitting the information to the center, and a means for controlling the water treatment facility according to the information received from the center. COPYRIGHT: (C)2011,JPO&INPIT
    • 要解决的问题:为了解决在城市地区存在影响水环境保护的风险的问题,因为由于排水难以调节而引起排水的再循环水的利用受到阻碍, 与水源有关的企业家。 解决方案:水环境信息中心综合管理从水源取水的企业家,向水源排水的企业家和水源的信息,分发循环水运行计划和运行支持建议书 的一个水处理设施给相关的企业家。 每个相关企业家都获得收集关于水资源利用和水处理信息以及将信息传送到中心的手段,以及根据从中心收到的信息来控制水处理设施的手段。 版权所有(C)2011,JPO&INPIT
    • 8. 发明专利
    • Operation arrangement supporting system and operation arrangement supporting method
    • 运行安排支持系统和运行安排支持方法
    • JP2007118674A
    • 2007-05-17
    • JP2005310808
    • 2005-10-26
    • Hitachi Ltd株式会社日立製作所
    • SAKIKAWA SHUICHIROSATO TATSUHIROKURISU HIROMITSUOKUDA KAZUAKI
    • B61L27/00
    • PROBLEM TO BE SOLVED: To support a recovery diagram based on early recovery of operation disorder and convenience of passengers while grasping the number of the passengers staying at a station/platform due to influences of the disorder of the day, in operation arrangement business.
      SOLUTION: This operation arrangement supporting system accumulates in-out records of the passengers in an operation arrangement server 1100 by a ticket examination device, computes the number of the passengers at a current time and a change of the number of the passengers thereafter in accordance with the recovery diagram of a train on the basis of its data, simulates the number of the passengers at each station and a seat-loading ratio of the train and displays its result with the diagram on an operation arrangement terminal 1200 which a station commander uses.
      COPYRIGHT: (C)2007,JPO&INPIT
    • 要解决的问题:为了支持基于早期恢复运行障碍和乘客便利性的恢复图,同时由于一天的紊乱的影响,在停留在车站/平台上的乘客数量的同时,在操作布置 商业。 解决方案:该操作装置支撑系统通过检票装置在操作安排服务器1100中积累乘客的进出记录,计算当前时间的乘客人数和乘客数量的变化 根据其数据的列车的恢复图,模拟每个车站的乘客人数和列车的座位负载比,并在操作布置终端1200上显示其结果,其中一个站 指挥官使用。 版权所有(C)2007,JPO&INPIT
    • 10. 发明专利
    • Water distribution pressure control system
    • 水分配压力控制系统
    • JP2012193585A
    • 2012-10-11
    • JP2011060027
    • 2011-03-18
    • Hitachi Ltd株式会社日立製作所
    • TAKAHASHI SHINSUKEADACHI SHINGOSATO TATSUHIROKURISU HIROMITSUTADOKORO HIDEYUKIYASUTOMI HIROYASU
    • E03B1/00F04D15/00G05D16/20
    • F04D15/0088E03B5/00G05D16/2073
    • PROBLEM TO BE SOLVED: To provide a water distribution pressure control apparatus which is capable of highly accurately controlling terminal pressure of a water distribution pipe network.SOLUTION: A water distribution pressure control system includes a duct resistance model generation unit 102, a pressure loss computation unit 104, a target discharge pressure computation unit 105 and a rotation speed control unit 107. On the basis of discharge pressure measured by a discharge pressure measuring instrument 2 installed between a water distribution pipe network 1 and pumps 8, 9 and 10, terminal pressure measured by a terminal pressure measuring instrument 3 installed between a water supply pipe of a water distribution destination and the water distribution pipe network 1 and a flow rate measured by a flow rate measuring instrument 4 installed between the water distribution pipe network 1 and the pumps 8, 9 and 10, the duct resistance model generation unit 102 generates a duct resistance model of the water distribution pipe network 1 reflected with influences caused by a modeling error of a predetermined level. On the basis of the duct resistance model and a water distribution flow rate pattern that the water distribution pressure control system has beforehand, the pressure loss computation unit 104 calculates a pressure loss amount of water pressure generated inside the water distribution pipe network 1. Upon receiving a target value of the terminal pressure and on the basis of the pressure loss amount and the target value of the terminal pressure, the target discharge pressure computation unit 105 computes target discharge pressure. The rotation speed control unit 107 controls rotation speeds of the pumps 8, 9 and 10 so as to achieve the target discharge pressure.
    • 要解决的问题:提供一种能够高精度地控制配水管网的端子压力的配水压力控制装置。 解决方案:配水压力控制系统包括管道阻力模型生成单元102,压力损失计算单元104,目标排出压力计算单元105和转速控制单元107.基于由 安装在配水管网1和泵8,9,10之间的排出压力测量仪器2,由配水目的地的供水管和配水管网1之间的端子压力测量仪3测量的端子压力 以及由安装在配水管网1和泵8,9,10之间的流量测量装置4测量的流量,管道阻力模型生成单元102生成反映为水分配管网1的管道阻力模型 由预定水平的建模误差引起的影响。 基于配水压力控制系统的管道阻力模型和配水量模式,压力损失计算单元104计算在配水管网1内产生的水压的压力损失量。接收到 终端压力的目标值,基于压力损失量和终端压力的目标值,目标排出压力计算单元105计算目标排出压力。 转速控制单元107控制泵8,9和10的转速,以达到目标排出压力。 版权所有(C)2013,JPO&INPIT