会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 1. 发明专利
    • Power generation and storage machine
    • 发电和储存机
    • JP2013036458A
    • 2013-02-21
    • JP2011201125
    • 2011-08-09
    • Hiroaki Yamashita博昭 山下
    • YAMASHITA HIROAKI
    • F03B13/12
    • PROBLEM TO BE SOLVED: To provide a power generation and storage machine which can work, unlike a nuclear power generator, without releasing radioactivity invisible and harmful to creatures or producing industrial wastes such as COthat is broadcasted on TV today.SOLUTION: The power generation and storage machine is not harmless to creatures, can be easily operated by anyone, and makes use of difference in tide levels caused by the attraction of the moon affecting the earth, which is energy that does not need to depend on nuclear power.
    • 要解决的问题:提供与核发电机不同的工作的发电和存储机器,不会释放对生物不可见和有害的放射性,或产生工业废物,例如CO 2 今天在电视上播出。

      解决方案:发电和储存机对生物无害,可由任何人轻松操作,利用影响地球的月球吸引力引起的潮汐水位差异,这是不需要的能量 依靠核能。 版权所有(C)2013,JPO&INPIT

    • 2. 发明专利
    • Handrail precedent type scaffold curing system, handrail precedent type scaffold using the same, and handrail precedent type scaffold curing method
    • HANDRAIL先前类型SCAFFOLD固化系统,使用其的HANDRAIL先前类型SCAFFOLD和HANDRAIL先前类型SCAFFOLD固化方法
    • JP2013057210A
    • 2013-03-28
    • JP2011196752
    • 2011-09-09
    • Hiroaki Yamashita博昭 山下
    • YAMASHITA HIROAKI
    • E04G5/00E04G21/32
    • E04G5/147E04G5/12E04G2005/148
    • PROBLEM TO BE SOLVED: To provide a handrail precedent type scaffold curing system that reduces construction costs and shortens a construction period by simultaneously advancing an operation to make handrails precedent to the scaffold and an operation for curing the scaffold, and builds an extremely safe scaffold, a handrail precedent type scaffold using the same, and a handrail precedent type scaffold curing method.SOLUTION: There is provided a scaffold curing system 1 used to build a scaffold at a work site, the scaffold curing system including a pair of guide rails 2, 2 installed along a building frame 11 constituting the scaffold, a handrail and curing shutter 3 slid down from above along the pair of guide rails 2, 2 between the guide rails 2, 2 to be installed outside the scaffold, and shutter fixing means of fixing the handrail and curing shutter 3 between the pair of the guide rails 2, 2 at a predetermined height.
    • 要解决的问题:提供一种扶手先锋型脚手架固化系统,通过同时推进手术扶手的先进手段和固定脚手架的操作,降低施工成本,缩短施工周期,并建立极其重要的 安全脚手架,使用其的扶手先验型脚手架,以及扶手先验型支架固化方法。 解决方案:提供了一种用于在工作场所构建脚手架的脚手架固化系统1,脚手架固化系统包括沿着构成脚手架的建筑物框架11安装的一对导轨2,2,扶手和固化 挡板3沿着导轨2,2之间的一对导轨2,2从下方滑动以安装在支架外部,以及将扶手和固化闸板3固定在一对导轨2之间的活门固定装置, 2处于预定高度。 版权所有(C)2013,JPO&INPIT