    • 1. 发明专利
    • GAS TURBINE PLANT
    • JP2001234755A
    • 2001-08-31
    • JP2000048928
    • 2000-02-21
    • HITACHI LTDHITACHI ENG CO LTD
    • WATANABE KENICHIARASE HIROSHIUTAMURA MOTOAKI
    • F02C7/143F02C3/30
    • PROBLEM TO BE SOLVED: To provide a gas turbine plant capable of sufficiently uniformly cooling inlet air by uniformly including liquid-drops in inlet air, even if the constitution on an inlet side of a compressor is any constitution, and attaining improvement of an output of the gas turbine plant. SOLUTION: In this gas turbine plant in which an intake chamber 12 provided on a gas intake side of the compressor and a liquid-drop spray device which is arranged at the inside of the intake chamber 12 and sprays liquid-drops to inlet gas of the compressor are provided, liquid-drops are mixed with inlet gas of the compressor and inlet gas is cooled, the liquid-drop spray device is provided with a liquid-drop spray nozzle pipe 51 spread within substantially perpendicular cross section in an intake flow passage within the intake chamber 12 and a plurality of liquid-drop spray nozzles 52 provided at prescribed intervals in the liquid-drop spray nozzle pipe 51, and the arrangement distribution of the liquid-drop spray nozzles 52 is made so as to be dense at a portion where gas flow velocity is fast within cross section of the intake chamber 12 and so as to be non-dense at a portion where gas flow velocity is slow.
    • 3. 发明专利
    • POWER PLANT WITH FLUIDIZED-BED BOILER
    • JPH0835611A
    • 1996-02-06
    • JP17510494
    • 1994-07-27
    • HITACHI LTDHITACHI ENG CO LTD
    • MISHIMA NOBUYOSHIUTAMURA MOTOAKIKOMATSU HIDEAKIMAO TAKASHI
    • F23C10/28F22B1/02F23C10/16F23C11/02
    • PURPOSE:To enable bringing boiler operation to an emergency stop in a short time and shorten the time needed for the cooling in a power plant equipped with a fluidized-bed boiler forming a fluidized bed by providing a nozzle for feeding a cooling medium into the fluidized bed. CONSTITUTION:For example, with an atmospheric fluidized-bed boiler 1, a signal for exigency stop is transmitted to a control box 20 and a command signal from the control box 20 is made to stop the feeding of fuel, air for combustion, and air for fluidization. Furthermore, on the directions of a signal 31 a main inert-gas valve 28 is opened. Next by opening cooling intake dampers 24a, 24b, 24+c, 24d in this order as ordered by a signal 30 an inert gas from an inert-gas bomb 29 is injected through cooling-gas nozzles 23a, 23b, 23c, 23d into the upper part of the boiler furnace and into divided sections of the fluidized bed 5 so as to cool the boiler 1. After damping the fluidized bed to such a temperature as not to rekindle the unburnt coal therein, a blower 4 is actuated, a cooling-air damper 26 is opened as ordered by a signal 32, a signal 31 simultaneously issued causes the main inert-gas valve 28 to be turned off, and cooling air is injected though cooling-gas nozzles 23a, 23b, 23c, 23d.
    • 9. 发明专利
    • Wood energy use system
    • 木材能源使用系统
    • JP2003329203A
    • 2003-11-19
    • JP2002138391
    • 2002-05-14
    • Hitachi Eng Co LtdI C C:Kk日立エンジニアリング株式会社株式会社アイシーシー
    • KUROBA SHIGEKIARASE HIROSHIUTAMURA MOTOAKI
    • F23C99/00C10B53/02C10C5/00F22B1/18F22B35/00F23C11/00
    • Y02E50/14
    • PROBLEM TO BE SOLVED: To provide a wood energy use system capable of certainly executing steam supply of a prescribed flow rate to a steam turbine with suppressing environmental pollution when generating electric power by burning bark material by a boiler to generate steam.
      SOLUTION: The steam of the predetermined flow rate is generated in the boiler 6 wherein the bark material is main fuel, and is supplied to the steam turbine 18 driving a power generator 19. A charcoal grinder 3 grinds charcoal to generate powder charcoal. A powder charcoal amount adjuster 37 supplies the powder charcoal to the boiler 6 as a combustion improving agent when a flow rate of the steam flowing in the steam turbine 18 decreases compared to the prescribed flow rate, to keep the flow rate of the steam flowing in the steam turbine 18 the prescribed flow rate.
      COPYRIGHT: (C)2004,JPO
    • 要解决的问题:提供一种木材能量使用系统,其能够通过用锅炉燃烧树皮材料来产生电力,从而在蒸汽涡轮机上确定地执行规定流量的蒸汽供给,同时抑制环境污染,从而产生蒸汽。

      解决方案:在锅炉6中产生预定流量的蒸汽,其中树皮材料是主要燃料,并被供应到驱动发电机19的蒸汽轮机18上。木炭研磨机3研磨木炭以产生粉末炭 。 当在蒸汽轮机18中流动的蒸汽的流量与规定的流量相比降低时,粉末炭量调节器37将作为燃烧改善剂的粉末炭供给到锅炉6,以保持蒸汽的流量流入 蒸汽轮机18具有规定的流量。 版权所有(C)2004,JPO