会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 1. 发明专利
    • Resource allocation support device, resource allocation support method, and resource allocation support program
    • 资源分配支持设备,资源分配支持方法和资源分配支持计划
    • JP2009238033A
    • 2009-10-15
    • JP2008084906
    • 2008-03-27
    • Hitachi Ltd株式会社日立製作所
    • TOMIYAMA TOMOEMORITA TOYOHISASATO TATSUHIROSAKIKAWA SHUICHIROSASAKI TOSHIRO
    • G05B19/418G06Q50/00G06Q50/04
    • Y02P90/18Y02P90/30
    • PROBLEM TO BE SOLVED: To support creation of an operation plan along the intention of a planner. SOLUTION: A resource allocation support device 100 prestores items for input of setting data for creation of conditions which are constraint conditions between nodes for restricting allocation between operations and operators, specify one or more operations and specify one or more operators, and displays the input items on a display part 110. Then this device accepts input of the setting data from users, and creates the constraint conditions between the nodes based on the setting data whose input is accepted. In addition, the device determines candidates of solutions which satisfy the created constraint conditions between the nodes from prepared allocation candidates. Furthermore, the device displays network information using the operations and the operators as the nodes and using allocation which can be established as links on the display part 110 as candidates of the solutions. COPYRIGHT: (C)2010,JPO&INPIT
    • 要解决的问题:支持根据计划者的意图创建操作计划。 解决方案:资源分配支持设备100预先存储用于输入设置数据的项目,用于创建作为用于限制操作和操作者之间的分配的节点之间的约束条件的条件,指定一个或多个操作并指定一个或多个操作符,并且显示 然后,该设备接受来自用户的设置数据的输入,并且基于输入被接受的设置数据在节点之间创建约束条件。 此外,设备确定满足从准备好的分配候选的节点之间创建的约束条件的解的候选。 此外,设备使用操作和操作者作为节点显示网络信息,并且使用可以在显示部分110上建立为链接的分配作为解决方案的候选。 版权所有(C)2010,JPO&INPIT
    • 2. 发明专利
    • Apparatus, method and program for acquiring plan generation condition
    • 用于获取计划生成条件的装置,方法和程序
    • JP2009064390A
    • 2009-03-26
    • JP2007233947
    • 2007-09-10
    • Hitachi Ltd株式会社日立製作所
    • TOMIYAMA TOMOEMORITA TOYOHISASATO TATSUHIROSAKIKAWA SHUICHIROSASAKI TOSHIRO
    • G06Q10/00G06Q10/06G06Q10/10G06Q50/00
    • PROBLEM TO BE SOLVED: To provide a plan generation condition acquisition apparatus capable of acquiring a restriction condition allowed to be used under similar situations and its application standard during plan generation operation. SOLUTION: The plan generation condition acquisition apparatus 200 is provided with a network expression generation part 203 for generating a network expression expressing relation between an attribute of a plan target and the plan target, a state calculation part 204 for calculating state information of relation between plan targets on the basis of the network expression and restriction between the plan targets stored in a storage part, a state diagram generation part 208 for generating a state diagram on the basis of the state information, a condition receiving part 209 for displaying the state diagram on a display means and receiving a generation condition specification from a user on the basis of the calculated relation between the plan targets, and a condition generation part 211 for converting the received generation condition into the link operation of the network expression, storing the link operation in the storage means and reflecting the received generation condition to the network expression. Thus, a restriction condition allowed to be used under similar states can be acquired. COPYRIGHT: (C)2009,JPO&INPIT
    • 要解决的问题:提供一种能够在计划生成操作期间获取允许在类似情况下使用的限制条件及其应用标准的计划生成条件获取装置。 解决方案:计划生成条件获取装置200设置有网络表达生成部分203,用于生成表达计划目标的属性与计划目标之间的关系的网络表达式;计算状态信息的状态计算部分204 基于网络表达的计划对象和存储在存储部中的计划目标之间的限制之间的关系,用于基于状态信息生成状态图的状态图生成部208,用于显示 状态图,并且根据计算出的计划目标之间的关系从用户接收生成条件规定;以及条件生成部211,将接收到的生成条件变换为网络表达式的链接动作,存储 在存储装置中进行链接操作并将接收到的生成条件反映到th e网络表达。 因此,可以获得允许在类似状态下使用的限制条件。 版权所有(C)2009,JPO&INPIT
    • 3. 发明专利
    • Service providing system, its management device and terminal device
    • 服务提供系统,其管理设备和终端设备
    • JP2006114057A
    • 2006-04-27
    • JP2005357112
    • 2005-12-12
    • Hitachi Ltd株式会社日立製作所
    • EGUCHI TOSHIHIROSATO MICHIOMIYATAKE MANABUNAGANO YASUSHISASAKI TOSHIRO
    • G06K17/00G07B15/00
    • PROBLEM TO BE SOLVED: To solve such problems that a user or an operator needs to operate an IC card terminal, regarding various services in a conventional system such as update of an expiration date of an IC card and adding of a value to the IC card, and accordingly a long queue is formed for an issuance/update window for a commuter's season ticket or a student's season ticket on a new school term, or a user needs to grasp the balance of a prepaid value and take procedures for adding the value. SOLUTION: When the user uses an IC card system, the user intentionally registers processing (action) necessary for the IC card with an IC card management system, or the system judges the situation to perform the same. The IC card management system beforehand delivers the action to an IC card terminal. Thereafter, when the user enters the IC card for which the action has been registered into an IC card terminal, an IC card terminal system executes the action corresponding to the IC card. COPYRIGHT: (C)2006,JPO&NCIPI
    • 要解决的问题:为了解决用户或操作者需要操作IC卡终端的问题,关于常规系统中的各种服务,例如更新IC卡的到期日期并将值添加到 IC卡,因此在新学期期间形成了用于通勤者季票的发行/更新窗口或学生的季票的长队列,或者用户需要掌握预付价值的余额并采取添加的程序 价值。

      解决方案:当用户使用IC卡系统时,用户有意地注册IC卡与IC卡管理系统所需的处理(动作),或者系统判断情况执行相同。 IC卡管理系统预先向IC卡终端发送动作。 此后,当用户将已经注册动作的IC卡输入IC卡终端时,IC卡终端系统执行对应于IC卡的动作。 版权所有(C)2006,JPO&NCIPI

    • 6. 发明专利
    • TRAIN CONTROL SYSTEM AND TRAIN OPERATION SUPPORT SYSTEM
    • JP2001158356A
    • 2001-06-12
    • JP34477199
    • 1999-12-03
    • HITACHI LTD
    • KOBAYASHI MASARUSASAKI TOSHIRO
    • B60L15/40B61L3/08B61L23/14
    • PROBLEM TO BE SOLVED: To provide a control system for permitting high-density operation of trains and reducing time losses by preventing the trains from stopping between stations or preventing substantial decreases in their speeds if one of the trains is likely to be influenced by other trains traveling ahead of it or oncoming trains when these trains are delayed from a plan of travel. SOLUTION: The system, for controlling the operation of the train 1 by anticipating the opening time of an unopened path, includes an operation information transmitting and receiving device 22 for receiving area information including information about the operating conditions of all the trains present in a controlled area, a safety information receiving part 12 for receiving safety information including train position information, and an operation control device 21 for specifying the train to be controlled based on the area information and the train position information and for determining the opening time based on the information about the operating condition of the train to be controlled, thus controlling the operation of the train.
    • 8. 发明专利
    • PROCESS CONTROL UNIT
    • JPH11296225A
    • 1999-10-29
    • JP9870898
    • 1998-04-10
    • HITACHI LTD
    • SASAKI TOSHIRO
    • G08B25/14G05B23/02
    • PROBLEM TO BE SOLVED: To give a chattering-free alarm print while omitting a print of a chattering state alarm and reducing a waste of a form by printing the chattering alarm only at the time of initial generation and final recovery. SOLUTION: The generation and recovery time of an alarm factor signal, the identification number of an alarm, and the generation and recovery of the alarm are printed on a printer 5, if it passes a time set as a print wait time after alarm generation time stored in a buffer 2. Thus, the alarm is printed. For example, a value in an alarm operation table 7 changes from off to on before the time set as the print wait time elapses from the alarm generation time. Here, recovery and effectiveness data stored before are found by retrieval from the table in the buffer 2, then the effectiveness of the data is changed to ineffectiveness and a newly generated alarm is not stored in the buffer 2. Consequently, an alarm which is generated again within the set time after recovery is not printed out.