    • 3. 发明专利
    • EXECUTION CONTROL OF PAINT
    • JPH0699131A
    • 1994-04-12
    • JP25291792
    • 1992-09-22
    • HITACHI LTD
    • NAGATA TETSUYAANDO MASASHI
    • B05D1/36B05D3/00B05D7/14
    • PURPOSE:To prevent the remaining of a solvent in a film and to aim at the perfectness of painting by applying painting to a test piece under the same conditions as the painting to an object to be painted to confirm the hardness of the film on the test piece and further ageing the painted test piece when curing is insufficient before entering the painting work of the next process. CONSTITUTION:In a heavy corrosion-proof painting system, an inorg. or org. zinc rich primer layer 2 is applied to an object 1 to be painted as the lowermost layer and a mixed coat layer 3 and first and second topcoat layers 4, 5 are successively applied on the primer layer using paint such as epoxy paint, polyvinyl chloride paint or polyurethane paint. In this paint execution control method, a test piece other than the object 1 to be painted is prepared and painting is applied to the test piece under the same conditions as the painting to the object 1 to be painted to confirm the hardness of the film on the test piece and, when curing is insufficient, the painted test piece is further aged before the painting work of the next process is performed. Since the hardness of the test piece painted under the same conditions is measured, painting can be applied to the object 1 to be painted without damaging the object.
    • 6. 发明专利
    • CORROSION CRACKING RESISTANCE IMPROVING METHOD OF NUCLEAR REACTOR PIPING
    • JPH10170693A
    • 1998-06-26
    • JP33333896
    • 1996-12-13
    • HITACHI LTD
    • URAYAMA YOSHINAOKUNIYA JIROANDO MASASHI
    • G21D1/00
    • PROBLEM TO BE SOLVED: To improve corrosion cracking resistance of carbon steel piping, carbon steel welded piping and an apparatus by completely removing cooling water stagnating in the piping after operation of a nuclear reactor is stopped. SOLUTION: Even if drain processing of a coolant is performed after operation is stopped, cooling water stagnates in piping by a part. A method of sending a hot blast into a piping inside part, a method of heating a cooling water stagnating part by a heating coil from a pipe outside surface and a method of spraying a hot blast on the stagnating part from outside of a pipe, exist as a processing method of removing the cooling water. In a hot blast sending method, a hot blast of 200 to 300 deg.C not less than 50 deg.C is sent into at 500cc/sec or more. It is heated to 200 to 300 deg.C not less than 100 deg.C by the heating coil, and at hot blast spraying time, a temperature is set to the same temperature, and wind speed is set not less than 500cc/sec. It is effective when completely evaporated and removed by such heat treatment. Therefore, since a carbon steel apparatus and a carbon steel welded structure having excellent corrosion cracking resistance can be formed in a BWR reactor water environment, safety of a BWR is secured, and the service life of a nuclear power plant can be lengthened.