热词
    • 3. 发明专利
    • Gravity type pier structure
    • 重量级型式结构
    • JP2013189815A
    • 2013-09-26
    • JP2012057253
    • 2012-03-14
    • Port & Airport Research Institute独立行政法人港湾空港技術研究所Penta Ocean Construction Co Ltd五洋建設株式会社
    • SUGANO TAKAHIROKOHAMA EIJIYOSHIDA MAKOTOHARA MOTOHISAIKENO KATSUYA
    • E02B3/06
    • PROBLEM TO BE SOLVED: To provide a gravity type pier structure capable of obtaining large slide resistance force in an earthquake even when weight applied onto a bottom slab is light.SOLUTION: The gravity type pier structure comprises a gravity type revetment structure A composed of a rubble mound and a pier structure B constructed on the front side thereof. The pier structure B comprises a substructure 17 for which a plurality of pier support columns are integrally erected on an upper surface of a support column lower end supporting member 18 embedded under the front side of the revetment structure A, and a superstructure 16 including a floor slab supported by the substructure. The support column lower end supporting member 18 of the substructure is mounted on a water bottom foundation composed of rubbles and established at a water bottom, rubbles 23 configuring the revetment structure A are piled up on it, many vertically penetrating openings 20 are formed at the support column lower end supporting member 18, and the rubbles 23 configuring the revetment structure A are filled in the openings 20.
    • 要解决的问题:提供一种能够在地震中获得大的滑动阻力的重力型墩结构,即使施加到底板上的重量是轻的。解决方案:重力式墩结构包括重力式护舷结构A, 瓦砾堆垛和在其前侧构造的码头结构B. 码头结构B包括底架17,多个码头支撑柱一体地竖立在嵌入在护岸结构A的前侧的支撑柱下端支撑构件18的上表面上,并且包括地板 由底部支撑的板。 底座的支撑柱下端支撑构件18安装在由瓦砾构成的水底基础上并建立在水底处,构成护岸结构A的瓦砾23堆积在其上,许多垂直穿透开口20形成在 支撑柱下端支撑构件18,并且构成护岸结构A的瓦砾23填充在开口20中。
    • 4. 发明专利
    • Breakwater structure and undertow reinforcing mechanism
    • 破碎的结构和加强机构
    • JP2013032683A
    • 2013-02-14
    • JP2012013096
    • 2012-01-25
    • Penta Ocean Construction Co Ltd五洋建設株式会社
    • KOTOURA TAKESHIYASUNO KOICHIROYOSHIDA MAKOTO
    • E02B3/06
    • Y02A10/15
    • PROBLEM TO BE SOLVED: To provide a breakwater structure capable of increasing the destruction resistance of a breakwater against an undertow when tsunami occur, and an undertow reinforcing mechanism for the same.SOLUTION: The breakwater structure is constructed with a plurality of caissons KS arranged side by side. It includes undertow reinforcing mechanisms 10 each of which has a stopper member 11 arranged on a front face F of the caisson outside a harbor, a counter member 12 installed on the back side of the caisson inside the harbor, and a connection member 13 arranged in a gap between the caissons for connecting the stopper member and the counter member. The undertow reinforcing mechanisms give resistances to the caissons against undertow wave power when the undertow wave power operates on the back faces of the caissons.
    • 要解决的问题:提供能够提高防波堤对海啸发生时的抗破坏性的防波堤结构,以及用于其的底下加强机构。 解决方案:防波堤结构由多个并排设置的沉箱KS构成。 它包括加强机构10,每个加强机构10具有设置在港口外的沉箱的前面F上的止动构件11,安装在港口内的沉箱的后侧的对置构件12和布置在 用于连接止动构件和计数构件的沉箱之间的间隙。 当下沉波浪功率在沉箱的背面上工作时,底部的加固机构给沉箱提供抵抗下伏波力的电阻。 版权所有(C)2013,JPO&INPIT
    • 6. 发明专利
    • Construction method for pier structure
    • 砌块结构施工方法
    • JP2013119754A
    • 2013-06-17
    • JP2011269133
    • 2011-12-08
    • Penta Ocean Construction Co Ltd五洋建設株式会社
    • HARA MOTOHISAYOSHIDA MAKOTOIKENO KATSUYA
    • E02B3/06
    • PROBLEM TO BE SOLVED: To provide a construction method for a pier structure, capable of manufacturing and installing the pier structure efficiently and inexpensively.SOLUTION: A construction method for a pier structure includes the steps of: installing a bottom slab forming form 13 for forming a bottom slab 3 on a dry manufacturing yard 12 while installing a support jig 11 for supporting support posts 4, 4... at predetermined height positions above the bottom slab forming form 13; supporting the support posts 13 by the support jig 11 and erecting the support posts on the bottom slab forming form 13; placing concrete in the bottom slab forming form 13 and integrating the support posts 4, 4... with the bottom slab 3 to form a substructure 5; thereafter supporting the substructure 5 by a buoyancy body 16 provided in the support jig 11 and floating the substructure 5 on the surface of water to move it to a desired installation site; and relatively lowering the substructure 5 with respect to the support jig 11 at the installation site to install it on a water bottom foundation 2.
    • 要解决的问题:提供一种能够有效且廉价地制造和安装墩架结构的码头结构的施工方法。 解决方案:一种用于墩架结构的施工方法,包括以下步骤:在安装用于支撑支柱4,4的支撑夹具11的同时,在干燥的制造场所12上安装用于形成底板3的底板坯形成模13。 在形成板13的底板上方的预定高度位置; 通过支撑夹具11支撑支撑柱13,并将支撑柱竖立在底板上形成13; 将混凝土置于底部板坯形成件13中,并将支撑柱4,4a与底部板坯3整合以形成下部结构5; 然后通过设置在支撑夹具11中的浮力体16支撑下部结构5,并将底部结构5漂浮在水面上以将其移动到期望的安装位置; 并在安装地点相对于支撑夹具11相对地降下子结构5以将其安装在水底基础2上。版权所有(C)2013,JPO&INPIT
    • 7. 发明专利
    • Breakwater structure, caisson for breakwater and reinforcement method of breakwater
    • 破碎水结构,CAISSON用于破碎水和破碎加固方法
    • JP2013053435A
    • 2013-03-21
    • JP2011191669
    • 2011-09-02
    • Penta Ocean Construction Co Ltd五洋建設株式会社
    • YASUNO KOICHIROYOSHIDA MAKOTOKOMAKI TAIKI
    • E02B3/06
    • Y02A10/15
    • PROBLEM TO BE SOLVED: To provide a breakwater structure which is so strong that it is not easily made to fall and destroyed even when a caisson of a breakwater is slid by action of external force exceeding assumption like an unanticipated tsunami attack, the caisson for the breakwater and a reinforcement method of the breakwater.SOLUTION: For the breakwater structure, a caisson 11 is a superstructure, a foundation mount M by debris ST is a substructure, and a notched surface 13 notched so as to be inclined toward a bottom surface of the caisson is provided on a back surface lower part of the caisson. The notched surface helps formation of a rise by the ground and/or the debris behind the notched surface when the caisson is slid by the external force from a front surface, and the rise resists movement of the caisson.
    • 要解决的问题:为了提供一种如此强烈的防波堤结构,即使当防波堤的沉箱被超出假设的意外的力量滑动,如非预期的海啸袭击时,它也不容易掉落和破坏, 防波堤的沉箱和防波堤的加固方法。 解决方案:对于防波堤结构,沉箱11是上部结构,由碎片ST构成的基础安装座M是下部结构,并且在凹部的下表面上被切口以朝向沉箱的底面倾斜的缺口表面13设置在 后表面下沉部分的沉箱。 当沉箱由前表面的外力滑动时,缺口表面有助于在凹槽表面后面的地面和/或碎屑形成上升,并且上升阻止沉箱的移动。 版权所有(C)2013,JPO&INPIT
    • 8. 发明专利
    • Method and apparatus for constructing underground continuous wall
    • 用于建造地下连续墙的方法和装置
    • JP2005090006A
    • 2005-04-07
    • JP2003322037
    • 2003-09-12
    • Chida Engineering:KkPenta Ocean Constr Co LtdSeiko Kogyo Kk五洋建設株式会社成幸工業株式会社株式会社チダエンジニアリング
    • UEDA MASAKISUGIHARA HIROAKIYOSHIDA MAKOTOSENDA SHOHEIWATANABE KAZUHIROSHIBAHARA KATSUMI
    • E02D5/18
    • PROBLEM TO BE SOLVED: To reduce the possibility of causing the quality degradation of the mutual connection part of improving bodies, a lowering of construction efficiency and a problem of sludge mixed with a solidifying material even in adjacent construction by providing a technology for preventing the collapse of an existing improving body.
      SOLUTION: In the method of constructing a continuous wall body W formed of a plurality of improving bodies U, U in the ground by repeating a process of discharging an improving material M from discharge ports 12A, 12B in the state of inserting insertion shafts 1A, 1B with the discharge ports 12A, 12B into the ground to construct the improving bodies U in the ground insertion part of the insertion shafts 1A, 1B, an interception panel P for intercepting the insertion shaft 1A, 1B side from the going-away side from the insertion shaft 1A, 1B side is extended along a depth direction at least on the existing improving body U side of the insertion shafts 1A, 1B, and in this state, the insertion of the insertion shafts 1A, 1B and the construction of the improving bodies NU are carried out to construct the improving bodies NU continuous with the existing improving bodies U.
      COPYRIGHT: (C)2005,JPO&NCIPI
    • 要解决的问题:为了减少改善体的相互连接部分的质量下降的可能性,即使在相邻的结构中,也可以降低施工效率和与凝固材料混合的污泥的问题,通过提供技术 防止现有改善体的崩溃。 解决方案:在通过重复在插入插入状态下从排出口12A,12B排出改进材料M的过程来构造由多个改进体U,U形成的连续壁体W的方法中 具有排出口12A,12B的轴1A,1B进入地面,以构成插入轴1A,1B的接地插入部分中的改进体U,用于拦截插入轴1A,1B侧的截取面板P, 至少在插入轴1A,1B的现有改进体U侧沿插入轴1A,1B侧的远离一侧的深度方向延伸,并且在该状态下,插入轴1A,1B和结构 的改进机构NU进行,以构建与现有改良机构U连续的改进机构NU。版权所有(C)2005,JPO&NCIPI