    • 2. 发明专利
    • Method and system for injecting air into ground
    • 将空气注入地面的方法和系统
    • JP2014012948A
    • 2014-01-23
    • JP2012150146
    • 2012-07-04
    • Toa Harbor Works Co Ltd東亜建設工業株式会社Fudo Tetra Corp株式会社不動テトラOriental Shiraishi Corpオリエンタル白石株式会社
    • SAEGUSA HIROYUKIISOTANI SHUJIFUJII SUNAO
    • E02D3/10
    • PROBLEM TO BE SOLVED: To provide a method for injecting air into the ground capable of executing construction while monitoring secure progress of desaturation of the ground when injecting air thereinto without using complicated equipment.SOLUTION: In a method for injecting air into the ground, injection pressure p and an injection amount of air a at air injection holes 3 of an air injection pipe 2 installed in the sand ground are sequentially acquired with a pressure meter 5 and a flowmeter 6 installed on an air supply pipe 4. The injection pressure p is controlled with a pressure control valve 9a installed on a pressure supply pipe 4 so that the acquired injection pressure p is maintained constant in a preliminarily set range. Then, desaturation of the sand ground is executed by injecting the air a with the injection amount q thereof increased under the constant injection pressure.
    • 要解决的问题:提供一种将空气注入地面的方法,能够在不使用复杂的设备的同时监测地面注入空气的同时监测地面饱和度的稳定进展,同时监测地面的饱和进度。解决方案:在将空气注入地面的方法中, 在安装在砂土地面的空气喷射管2的空气喷射孔3处的压力p和空气a的喷射量依次由压力计5和安装在供气管4上的流量计6获取。喷射压力p 通过安装在压力供给管4上的压力控制阀9a进行控制,使得取得的喷射压力p在预先设定的范围内保持恒定。 然后,通过在恒定的喷射压力下喷射喷射量q来增加空气a来执行砂土的去饱和。
    • 3. 发明专利
    • Construction management method for degree of remaining saturation of foundation
    • 基础设施饱和度的建筑管理方法
    • JP2013227748A
    • 2013-11-07
    • JP2012099192
    • 2012-04-24
    • Toa Harbor Works Co Ltd東亜建設工業株式会社Fudo Tetra Corp株式会社不動テトラOriental Shiraishi Corpオリエンタル白石株式会社Dia Consultant:Kk株式会社ダイヤコンサルタント
    • SAEGUSA HIROYUKITAKAHASHI TATSUOFUJII SUNAOYAMAURA MASAYUKI
    • E02D1/04E02D27/34
    • PROBLEM TO BE SOLVED: To provide a construction management method for the degree of remaining saturation of a foundation that can easily and precisely form a sandy foundation having the target degree of remaining saturation when carrying out construction for injecting air into the sandy foundation.SOLUTION: A construction management method for the degree of remaining saturation of a foundation includes acquiring reference specific resistance ρt1 when the degree of saturation of a sandy foundation as an object of construction is 100% and the relation between a specific variation rate based thereupon and the degree Sr of saturation as previously grasped information using a foundation sample sampled from the sandy foundation as the object of construction, measuring specific resistance before and after air (a) is injected into the sandy foundation through an air injection pipe 2 between electrodes 6 installed apart from each other above and below a hole H bored in the sandy foundation as the object of construction, calculating an actual specific resistance variation rate of the sandy foundation on the basis of the measured specific resistance, calculating the degree Sr of saturation at the point of time when the specific resistance ρt1 is measured after the air injection on the basis of the calculated actual specific resistance rate and the previously grasped information, estimating the degree Sof residual saturation on the basis of the degree Sr of saturation, and performing the air injection so that the estimated degree Sof residual saturation reaches a target value.
    • 要解决的问题:提供一种施工管理方法,用于当进行将空气注入砂质基础的结构时,可以容易且精确地形成具有目标剩余饱和度的砂质基础的基础的剩余饱和度。解决方案: 用于基础的剩余饱和度的施工管理方法包括:当作为施工对象的沙质基础的饱和度为100%时,获得参考电阻率&rgr; t1,以及基于其的特定变化率与 使用从砂质基础取样的基础样品作为构造对象的先前掌握的信息的饱和度Sr,测量空气之前和之后的电阻率(a)通过安装在分开的电极6之间的空气注入管2注入到沙质基础中 彼此在沙底上钻孔的上方和下方 作为构造对象,基于测定的电阻率来计算沙质基础的实际比电阻变化率,计算在空气注入后测量电阻率&rgr; t1的时间点的饱和度Sr 基于计算出的实际电阻率和先前掌握的信息,基于饱和度Sr来估计Sof残余饱和度,并执行空气喷射,使得估计度Sof残余饱和度达到目标值。
    • 4. 发明专利
    • Calibration method and device for measuring saturation of ground
    • 用于测量地面饱和度的校准方法和装置
    • JP2013147882A
    • 2013-08-01
    • JP2012010252
    • 2012-01-20
    • Toa Harbor Works Co Ltd東亜建設工業株式会社Fudo Tetra Corp株式会社不動テトラOriental Shiraishi Corpオリエンタル白石株式会社Dia Consultant:Kk株式会社ダイヤコンサルタント
    • SAEGUSA HIROYUKIMIYOSHI AKIHIROFUJII SUNAOYAMADA NAOYUKI
    • E02D1/00G01V3/08
    • Y02A90/342
    • PROBLEM TO BE SOLVED: To provide a calibration method and a device which enable a high-precision measurement to be achieved in measuring saturation of the ground on the basis of specific resistance of sand ground with air injected thereinto.SOLUTION: A calibration method obtains a relation between saturation and specific resistance by: filling a sample of the ground G in a container 2 which can be sealed and has two conducting electrodes 7 arranged with a distance in between as well as detection electrodes 8a to 8e separately arranged in the distance between the two conductive electrodes 7; bringing the sample of the ground G to have saturation of 100% by filling water in the container 2 through a water supply pipe 5 while deaerating the container 2 through a suction pipe 6; sequentially reducing the saturation by draining water from the container 2 through the water supply pipe 5; detecting voltages between the detection electrodes 8a to 8e, at respective saturation, by voltage detection means 11 with an electric current applied to the conducting electrodes 7 by conducting means 10; and calculating the specific resistance of the sample of the ground G by calculation means 12 on the basis of the electric current as well as the voltages.
    • 要解决的问题:提供一种校准方法和装置,其能够在基于在其中注入的空气的砂土的比电阻来测量地面的饱和度时实现高精度测量。解决方案:校准方法获得 饱和度与电阻率之间的关系是:将容器2中的地面G的样品填充到可密封的容器2中,并且具有两个间隔设置的两个导电电极7以及分开布置在距离之间的距离处的检测电极8a至8e 两个导电电极7; 通过吸入管6使容器2脱气,通过供水管5将容器2内的水充满,使地面G的样品达到100%的饱和度; 通过从容器2排出水通过供水管5依次降低饱和度; 通过电压检测装置11,通过导电装置10向导电电极7施加电流,检测各个饱和度的检测电极8a至8e之间的电压; 并且基于电流以及电压,通过计算装置12计算地面G的样本的电阻率。
    • 8. 发明专利
    • Liquefaction prevention method for sandy ground, and structure for air injection into sandy ground
    • 沙地接地防护方法及空气注射入沙地结构
    • JP2009041334A
    • 2009-02-26
    • JP2007209993
    • 2007-08-10
    • Fudo Tetra CorpOriental Shiraishi CorpToa Harbor Works Co Ltdオリエンタル白石株式会社東亜建設工業株式会社株式会社不動テトラ
    • FUJII SUNAOTAKEBAYASHI MASAYANISHIDA KATSUSHI
    • E02D3/10
    • PROBLEM TO BE SOLVED: To provide a liquefaction prevention method for sandy ground and a structure for air injection which prevent the air injected through a pipe buried in an installation hole of the sandy ground, which is saturated with water, from leaking through the gap formed around the outer peripheral surface of the pipe and around the inner peripheral surface of the installation hole so that the degree of saturation may be lowered by the injected air.
      SOLUTION: The pipe 3 is internally inserted into a casing pipe inscribed to the installation hole 1 formed in the sandy ground saturated with the water, and silica sand S is filled between the casing pipe and the pipe 3 to the position where an air injection hole 4 of the pipe 3 is buried, so that a filter layer 5 may be formed. Next, an airtight filling material is filled to form an airtight layer 6. Then, after backfilling of the part above the airtight layer 6 and pulling out the casing pipe, the air A from an air supplying device 9 is injected into the ground from the air injection hole 4. When the gap is formed around the outer peripheral surface of the pipe 3 and around the inner peripheral surface of the installation hole, the airtight layer 6 prevents the air A from leaking to the ground surface.
      COPYRIGHT: (C)2009,JPO&INPIT
    • 要解决的问题:提供一种用于沙地的液化防止方法和用于空气注入的结构,其防止通过埋入在饱和水的沙地的安装孔中的管道注入的空气泄漏通过 形成在管的外周面周围的间隙和安装孔的内周面周围,使得通过注入的空气可以降低饱和度。 解决方案:将管3内插入与内置于在饱和的沙地中形成的安装孔1的套管内,并将硅砂S填充到套管与管3之间, 管3的空气注入孔4被埋入,从而可以形成过滤层5。 接下来,填充气密填充材料以形成气密层6.然后,在气密层6上方的部分回填并拉出套管之后,来自空气供应装置9的空气A从 空气注入孔4.当围绕管3的外周面形成并且围绕安装孔的内周面形成间隙时,气密层6防止空气A泄漏到地面。 版权所有(C)2009,JPO&INPIT
    • 9. 发明专利
    • Method for preventing deformation caused by liquefaction at earthquake
    • 防止地震引起的变形的方法
    • JP2007297838A
    • 2007-11-15
    • JP2006126410
    • 2006-04-28
    • Fudo Tetra CorpShiraishi Corp株式会社不動テトラ株式会社白石
    • NISHIDA KATSUSHIFUJII SUNAO
    • E02D27/34
    • PROBLEM TO BE SOLVED: To prevent an object buried in the ground from rising up or subsiding when an earthquake occurs.
      SOLUTION: Air is blown into the ground 1 around the object 2 buried into the ground such as a pipe for a lifeline to form an unsaturated region 10 and prevent liquefaction so that the rising-up or subsidence of the object 2 buried into the ground is prevented. For example, an air filling pipe 4 is inserted into the ground 1 around the object 2 buried into the ground up to a position where it reaches a part below the object 2 buried into the ground from on the ground, and air is blown into the ground 1 around the object 2 buried into the ground by blowing out air from the tip of the air filling pipe 4 to form the unsaturated region 10.
      COPYRIGHT: (C)2008,JPO&INPIT
    • 要解决的问题:防止地震发生时埋在地面上的物体上升或下降。 解决方案:将空气吹入埋在地下的物体2上的地面1中,例如用于生命线的管道,以形成不饱和区域10并防止液化,使物体2的上升或下沉被埋入 地面被阻止。 例如,将填充空气管4插入到埋入地面的物体2周围的地面1中,到达从地面到达地面的物体2的下方的部分的位置,空气吹入 通过从空气填充管4的尖端吹出空气来形成不饱和区域10,将物体2周围的地面1埋入地下。形成:(C)2008,JPO&INPIT