会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 1. 发明专利
    • Maintenance cost distribution system and maintenance cost distribution method
    • 维护成本分配系统和维护成本分配方法
    • JP2006202171A
    • 2006-08-03
    • JP2005015048
    • 2005-01-24
    • Chugoku Electric Power Co Inc:The中国電力株式会社
    • SONODA TOKUYUKIKOUBU HIROYUKIONO YASUHIRO
    • G06Q50/00G06Q50/06G06Q50/10
    • PROBLEM TO BE SOLVED: To provide a maintenance cost distribution system capable of properly finding maintenance cost to a plurality of plants and distributing it. SOLUTION: This maintenance cost distribution system has: a means obtaining relation between the maintenance cost and a maintenance ratio in each the plant; and a maintenance cost derivation means deriving the maintenance cost of a failure rate of a state that hindrance is not imparted as operation of the whole of the plurality of plants, to each the plant within a range of the maintenance cost of the whole. The maintenance ratio to a ratio of the maintenance cost, i.e., frequency of execution of maintenance is obtained in each the plant, the relation between the maintenance cost and the frequency of the execution of the maintenance is predicted, and the maintenance cost of each the plant of the state that the hindrance is not imparted as the operation of the whole of the plants is derived within the maintenance cost of the whole. COPYRIGHT: (C)2006,JPO&NCIPI
    • 要解决的问题:提供能够适当地找到多个设备的维护成本并进行分配的维护成本分配系统。

      解决方案:该维护成本分配系统具有:获取每个工厂的维护成本和维护率之间的关系的手段; 并且维护成本导出意味着导致在整个维护成本的范围内,将不影响的状态的故障率的维护成本作为整个多个设备的整体运行到每个设备。 维修成本与维修费用比例(即维修执行次数)在每个工厂获得时,预计维护成本与执行维修次数之间的关系,每个维护成本 作为整个植物的操作而不产生障碍的植物是在整体的维护成本内导出的。 版权所有(C)2006,JPO&NCIPI

    • 3. 发明专利
    • Real work presence confirmation system
    • 实际存在确认系统
    • JP2011215671A
    • 2011-10-27
    • JP2010080183
    • 2010-03-31
    • Chugoku Electric Power Co Inc:The中国電力株式会社
    • UEDA KAZUHIKOONO YASUHIROMIHARA YOSHIYUKIFUJIMOTO TETSUYA
    • G06Q50/00G06Q50/06G06Q50/10
    • PROBLEM TO BE SOLVED: To provide a real work presence confirmation system which manages the presence/absence of the reality of work without spending labor, and allows costs for construction to be appropriately paid.SOLUTION: The real work presence confirmation system (1) includes a daily maintenance management system (2) managed at a construction supervisor place (102) of a power company (100) and a work slip management system (3) managed by an operation-in-charge place (102) as a department which is different from the construction supervisor place (102). A reality-of-work confirmation means (23) of the daily maintenance management system (2) determines whether the reality of work of the construction is present in the work slip management system (3), and a cost payment means (24) pays costs to the construction whose reality of work has been confirmed to be present.
    • 要解决的问题:提供一种真正的工作存在确认系统,可以在不花费劳动的情况下管理工作现实的存在/不存在,并且允许适当地支付建筑成本。解决方案:真正的工作存在确认系统(1)包括 由电力公司(100)的施工主管地(102)和由营运地(102)管理的工作单管理系统(3)管理的日常维护管理系统(2)作为部门, 不同于施工主管地方(102)。 日常维护管理系统(2)的现实确定手段(23)确定工作工作的现实是否存在于工单管理系统(3)中,成本支付手段(24)支付 已确认现实工作的施工费用。