会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 3. 发明专利
    • Lead-in repairing method for mounting pipe
    • 用于安装管道的引导式修复方法
    • JP2007071349A
    • 2007-03-22
    • JP2005261455
    • 2005-09-09
    • Asahi Tec Corp旭テック株式会社
    • MIYAUCHI SHINYA
    • F16L55/16B29C63/34E03F7/00F16L1/024
    • PROBLEM TO BE SOLVED: To provide a pipe line repairing method for reducing man-hours up to completing repair even when the number of mounting pipes to be repaired is increased. SOLUTION: The repairing method uses a collared repairing material 1 having a collar 5 fixed to one end of a cylindrical body 3 impregnated with a hardening resin for repairing the plurality of mounting pipes 110 (111, 112) branching from a main pipe 100 together with branch portions 120 through a lead-in process for exposing the collar portion 5 toward the main pipe 100 in the state of fitting the body 3 into the mounting pipe 110 and leading the collar portion 5 to cover the branch portions 120 between the main pipe 100 and the mounting pipe 110. For the collared repairing material 1, a thrust hardening means 25 is used which hardens the collared repairing material 1 having an adhesive layer 6 and the plurality of collar portions 5 while thrusting them toward a main pipe inner wall 100a at the same time. It hardens the plurality of collar portions 5 while thrusting them in parallel at the same time. COPYRIGHT: (C)2007,JPO&INPIT
    • 要解决的问题:即使当要修理的安装管道的数量增加时,提供一种用于减少工时以至完成修理的管道修理方法。 解决方案:修理方法使用一个套圈修复材料1,其具有固定在浸渍有硬化树脂的圆筒体3的一端的轴环5,用于修复从主管分支的多个安装管110(111,112) 100与分支部分120一起通过用于在将主体3装配到安装管110中的状态下将套环部分5暴露于主管道100的引入过程,并且引导套环部分5覆盖两个分支部分120之间的分支部分120 主管100和安装管110.对于套圈修复材料1,使用推力硬化装置25,其使具有粘合剂层6和多个套环部分5的套环修复材料1固化,同时将其推向主管内 墙100a同时。 同时使多个凸缘部分5同时并入,使其多个硬化。 版权所有(C)2007,JPO&INPIT
    • 4. 发明专利
    • Repairing material and pull-in repairing method using it
    • 修复材料和使用它的拉拔修复方法
    • JP2006312283A
    • 2006-11-16
    • JP2005136151
    • 2005-05-09
    • Asahi Tec Corp旭テック株式会社
    • MIYAUCHI SHINYA
    • B29C63/34F16L55/16F16L58/10
    • PROBLEM TO BE SOLVED: To provide a flanged repairing material which facilitates the pull-in and alignment of the repairing material into an attaching pipe, and a pull-in repairing method using it. SOLUTION: The flanged repairing material is equipped with a flexible cylindrical main body part 3 having a fibrous base material layer 2, which is impregnated with a curable resin, laminated thereto and the flange part 5 fixed to one end of the main body part 3. The flange part 5 is constituted by laminating a flange-shaped thin plate 7 comprising a hard shape retaining material on a fibrous base material 6 impregnated or coated with a curable adhesive and formed in a foldable manner. In the constitution of the flange part 5, for example, folds can be formed to the flange part 5 by forming slits 10a-10d to the flange-shaped thin plate 7 toward the diametric direction of the main body part 3. COPYRIGHT: (C)2007,JPO&INPIT
    • 要解决的问题:提供一种有助于将修复材料拉入和对准到连接管中的法兰修复材料,以及使用它的拉入修复方法。 解决方案:法兰修补材料配备有柔性圆柱形主体部分3,其具有层压在其上的具有可固化树脂的纤维基材层2,并且固定到主体的一端的凸缘部分5 凸缘部5通过将包含硬质保持材料的凸缘状薄板7层叠在浸渍或涂布有可固化粘合剂的纤维基材6上并以可折叠的方式形成。 在凸缘部5的结构中,例如,可以通过向凸缘状薄板7朝向主体部3的直径方向形成狭缝10a-10d而向凸缘部5形成折痕。 (C)2007,JPO&INPIT
    • 5. 发明专利
    • Renovation material
    • 翻新材料
    • JP2005069258A
    • 2005-03-17
    • JP2003208551
    • 2003-08-25
    • Asahi Tec Corp旭テック株式会社
    • MIYAUCHI SHINYAHIRAMOTO OKIMASA
    • E03F7/00B29C63/34B29L23/00B32B1/08B32B5/28F16L11/08
    • PROBLEM TO BE SOLVED: To provide a renovation material superior in adhesiveness to an inner wall face of a pipe conduit during the construction and having high rigidity after the construction, with respect to the renovation material having tensile strength enough for being pulled into the pipe conduit with a simple constitution.
      SOLUTION: This renovation material includes a fibrous material including a thermoset resin-impregnated fibrous base material, and used in a state of being pulled in the pipe conduit, and the thermoset resin is hardened in a state that the renovation material is closely kept into contact with the inner wall face of the pipe conduit to renovate the inner wall face of the pipe conduit. This renovation material includes woven fabric or braided fabric 20 applying reinforcement fiber such as glass fiber as warp yarn (oblique yarn) 21 and weft yarn (oblique yarn) 22, and the woven fabric or the braided fabric 20 is arranged in a state that fiber axes 21a, 22a of the reinforcement fiber such as glass fiber are arranged in the direction intersecting with a pipe axis 1a.
      COPYRIGHT: (C)2005,JPO&NCIPI
    • 要解决的问题:提供一种在施工期间与管道内壁面的粘合性优异并且在施工之后具有高刚性的改造材料,相对于具有足够拉伸强度的改进材料 管道结构简单。 解决方案:该改造材料包括纤维材料,其包括热固性树脂浸渍的纤维基材,并且以被拉入管道中的状态使用,并且热固性树脂在翻新材料紧密的状态下硬化 与管道的内壁面保持接触,以便更换管道的内壁面。 这种翻新材料包括以经纱(斜纱)21和纬纱(斜纱)22为代表的玻璃纤维等增强纤维的编织物或编织物20,织物或编织物20配置成纤维 玻璃纤维等增强纤维的轴线21a,22a沿与管轴1a相交的方向配置。 版权所有(C)2005,JPO&NCIPI