    • 8. 发明专利
    • Improvement work for soft ground
    • 改进软土工程
    • JPS5915117A
    • 1984-01-26
    • JP12291082
    • 1982-07-16
    • Nittoku Kensetsu Kk
    • MIYASHITA KOUJI
    • E02D3/12
    • E02D3/12
    • PURPOSE:To avoid the leak loss of a grout injected under the ground by overlappingly injecting the grout into soft ground. CONSTITUTION:An injection tube is penetrated to a given depth into a soft ground 8 in an area to be improved, and while injecting a gelled solidifying agent 7, the injection tube 1 is pulled up by a given distance. The injection tube 1 is then repenetrated into the solidifying agent 7 injected and then pulled up, during which gelled solidifying agent 7' is again injected into the preceding solidifying agent 7 injected. The solidifying agent 7' injected later expands inside the preceding solidifying agent 7, and thereby the surrounding eroded soil layer 8 is further compressed and the outside face of the preceding solidifying agent 7 is almost molded into a designed shape.
    • 目的:避免通过将灌浆重新注入软土而注入地下的灌浆泄漏损失。 构成:将注射管穿透到要改进的区域中的软土地面8中,并且在注入胶凝固化剂7的同时,将注射管1向上拉一定距离。 然后将注射管1再渗透入注射的固化剂7中,然后拉起,在此期间将凝胶化固化剂7'再次注入注入的先前固化剂7中。 随后注入的凝固剂7'在前面的凝固剂7的内部扩展,从而使周围的侵蚀土层8被进一步压缩,并且前面的固化剂7的外表面几乎被模制成设计形状。
    • 10. 发明专利
    • GREENS-PLANTING WORK FOR WATER-IMPERMEABLE SLOPE
    • JPS57140425A
    • 1982-08-31
    • JP2491581
    • 1981-02-24
    • NITTOKU KENSETSU KK
    • AOKI KAZUO
    • E02D17/20
    • PURPOSE:To prevent the slackening and falling of planting materials sprayed on the upper part of a water-impermeable slope by dividing the water-impermeable slope into contour lined sections by using horizontal cement mortar beams inserted with iron bars having a high bonding strength. CONSTITUTION:Fibrous composite mats 3 are laid in a contour lined manner on a water-impermeable slope 1 by means of concrete nails 4. Then, anchor bolts 5 are driven at equal intervals along the lower ends of the mats 3 in such a way that the heads of the anchor bolts 5 are exposed about 15cm or more from the mats 3. Then, the heads of the anchor bolts 5 are connected by iron bars 6 and on the upside of the part, drain pipes 7 are inserted at equal intervals into the mats 3. Then, cement mortar is sprayed on the drain pipes 7, the iron bars 6, and anchor bolts 5 in such a way as to cover all of them. And so, a planting material 10 consisting of soil, fertilizer, seeds, etc, is sprayed on the slope 1 divided by cross beams 2 on cotrour lines.