会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 2. 发明专利
    • Installation structure of solar cell module on batten seam roof
    • 太阳能电池模块在电池室的安装结构
    • JP2012102543A
    • 2012-05-31
    • JP2010252099
    • 2010-11-10
    • Kamisho Kk上商株式会社
    • UEMI TOSHIO
    • E04D13/18E04D3/40E04D13/00H01L31/042
    • Y02B10/12Y02E10/50
    • PROBLEM TO BE SOLVED: To provide an installation structure of a solar cell module on a batten seam roof, which is capable of stably supporting a cell module support bar and a solar cell module and of withstanding strong winds, earthquakes, and the like.SOLUTION: A roof plate pressing member 11 which is also used as a trestle is formed by folding downward a top plate 19 for supporting a cell module support bar 4 and a pair of right and left side plates 20 from the left and right side edges of the top plate 19, and a cross-sectional groove shaped inner concave groove 21 is formed in the center part of a horizontal direction of the top plate 19. The roof plate pressing member 11 which is also used as a trestle covers a clip 9 and the left and right rising connection edges 6 of roof plates 1 and 1 from above, while a groove bottom part 21a of the inner concave groove 21 of the roof plate pressing member 11 which is also used as a trestle and a passing inner gutter 10 are fixed to a screw receptacle 15 with a second screw 26, and the roof plates 1 and 1 are pressed down by roof plate pressing portions 20a provided in the lower ends of the left and right side plates 20 from above.
    • 要解决的问题:提供一种能够稳定地支撑电池模块支撑杆和太阳能电池组件并承受强风,地震的板条接缝屋顶上的太阳能电池组件的安装结构,并且 喜欢。 解决方案:还用作支架的屋顶板按压构件11通过向下折叠用于支撑电池模块支撑杆4的顶板19和从左侧和右侧的一对右侧板和左侧板20而形成 在顶板19的水平方向的中心部分形成有顶板19的侧边缘和横截面形状的内凹槽21,也用作支架的屋顶板按压部件11覆盖 夹板9以及顶板1和1的左右上升连接边缘6,同时也用作支架的内板凹槽21的槽底部21a和通过内侧 沟槽10用第二螺钉26固定在螺钉插座15上,并且顶板1和1由设置在左右侧板20的下端的顶板按压部分20a从上方按压。 版权所有(C)2012,JPO&INPIT
    • 3. 发明专利
    • MUTUAL CONNECTING STRUCTURE BETWEEN VERTICALLY ROOFED TYPE METALLIC ROOF PLATE
    • JP2002004512A
    • 2002-01-09
    • JP2000183269
    • 2000-06-19
    • KAMISHO KK
    • UEMI TOSHIO
    • E04D3/366
    • PROBLEM TO BE SOLVED: To prevent a leakage into the roof wall of a building from a connecting section between mutual roof plates of rainwater, to prevent peeling- off from the roof wall of the building of the roof plates due to negative pressure generated by a strong wind and to omit the preparatory marking works of mounting pitches in the horizontal direction of clips. SOLUTION: Each skirt 12 is extended from each impervious recessed strip 11 of each left-right side plate 10 of a cap 3 to horizontal external lower positions, and the lower edges 13 of the skirts 12 are abutted against the roof plate 1. Wide buffer spaces 14 are formed in the insides enclosed by the skirts 12, the roof plate 1 and upstanding connecting edges 4. The upstanding intermediate sections 16 and upstanding upper sections 17 of the upstanding connecting edges 4 are formed in a form that the sections 16 and 17 are not forwarded to the clip 2 sides to the upstanding base sections 15 of the connecting edges 4 in the upstanding connecting edges 4 of the roof plate 1.
    • 4. 发明专利
    • Installation structure of solar cell module on roof
    • 太阳能电池模块在室内的安装结构
    • JP2012102545A
    • 2012-05-31
    • JP2010252101
    • 2010-11-10
    • Kamisho Kk上商株式会社
    • UEMI TOSHIO
    • E04D13/18E04D3/40E04D13/00H01L31/042
    • Y02B10/12Y02E10/50
    • PROBLEM TO BE SOLVED: To provide an installation structure of a solar cell module on a roof, which is capable of firmly fixing a roof plate itself, preventing leakage of rainwater to an attic, stably supporting a cell module support bar and a solar cell module.SOLUTION: A cell module support frame 11 which is also used for pressing a roof plate is formed by folding downward a top plate 19 supporting a cell module holding member 4 and a pair of right and left side plates 20 from the left and right side edges of the top plate 19, and an inner concave groove 21 is formed in the center part of a horizontal direction of the top plate 19. The cell module support frame 11 covers a clip 9 and the left and right rising connection edges 6 of roof plates 1 and 1 from above, while a groove bottom part 21a of the inner concave groove 21 of the cell module support frame 11 is fixed to a trestle step part 15 of the clip 9 with a second screw 36, and the roof plates 1 and 1 are pressed down by roof plate pressing portions 20a provided in the lower ends of the left and right side plates 20 from above.
    • 要解决的问题:为了提供一种太阳能电池组件在屋顶上的安装结构,其能够牢固地固定屋顶板本身,防止雨水渗透到阁楼,稳定地支撑电池模块支撑杆和 太阳能电池模块 解决方案:还用于压制屋顶板的电池模块支撑框架11通过向下折叠从左侧向下折叠支撑电池模块保持构件4的顶板19和一对右侧板和左侧板20, 顶板19的右侧边缘和内凹槽21形成在顶板19的水平方向的中心部分。电池模块支撑框架11覆盖夹子9,左右上升连接边缘6 顶板1和1的顶板1,而电池模块支撑框架11的内凹槽21的凹槽底部21a用第二螺钉36固定在夹子9的支架台阶部分15上,并且顶板 如图1和图1所示,由设置在左右侧板20的下端的顶板按压部20a从上方按压。 版权所有(C)2012,JPO&INPIT
    • 5. 发明专利
    • RESPIRATION TYPE HUMIDITY CONTROLLING HUMIDITY-CONTROL WALL FOR BUILDING INDOOR AIR
    • JP2003119913A
    • 2003-04-23
    • JP2001321262
    • 2001-10-19
    • KAMISHO KK
    • UEMI TOSHIO
    • E04B1/64E04B1/70
    • PROBLEM TO BE SOLVED: To prevent damage by condensed water of a body to be housed by adhering on the body to be housed of moisture in high-humidity air during a dehumidifying progressive period in a humidity-conditioning chamber, to simplify the execution of works of the humidity-conditioning chamber and improve its efficiency and to increase bending strength as the whole humidity- conditioning chamber. SOLUTION: A plurality of humidity-conditioning plates 4 and the like are juxtaposed mutually in multiples in the direction of the plate thickness at spaces 5 for a venting. The spaces 5 for the venting communicate with the humidity- conditioning chamber 3 through airways 6. A plurality of vent holes 7 and the like are bored to the humidity-conditioning plates 4 positioned on the side nearer to the chamber 3 than the spaces 5. The airways 6 are composed of the vent holes 7. Honeycomb cores 10 are housed in the spaces 5. Both humidity- conditioning plates 4 and 4 placed before and behind the honeycomb cores 10 are contacted and abutted against the honeycomb cores 10, and bonded by bonding means 11.
    • 6. 发明专利
    • MUTUAL CONNECTING STRUCTURE BETWEEN VERTICALLY ROOFED TYPE METALLIC ROOF PLATE
    • JP2002004513A
    • 2002-01-09
    • JP2000183270
    • 2000-06-19
    • KAMISHO KK
    • UEMI TOSHIO
    • E04D3/366
    • PROBLEM TO BE SOLVED: To prevent a leakage into the roof wall of a building from a connecting section between mutual roof plates of rainwater, and to increase force resisting slipping-out from the upstanding connecting edge of the roof plate of a cap by disturbance force. SOLUTION: Each left-right impervious projecting strip 6 of the roof plate 1 is formed by folding-down to the roof plate 1 side from the upper edges of each left-right upstanding connecting edge 4. Rainwater lifting inversion spaces 26 and rainwater going-in-out openings 27 are formed among each upstanding connecting edge 4 and each impervious projecting strip 6 in a vertically arranged manner. The connecting structure is constituted in such a manner that parts of rainwater on the roof plate 1 are blown up along the upstanding connecting edges 4 when they are blown into the upstanding connecting edge 4 sides by a wind, are lifted up to the rainwater lifting inversion spaces 26 from the rainwater going-in-out openings 27 and are inverted and drop and gradually drop onto the roof plate 1 from the openings 27.
    • 7. 发明专利
    • Installation structure of solar cell module on standing seam roof
    • 太阳能电池模块的安装结构
    • JP2012102544A
    • 2012-05-31
    • JP2010252100
    • 2010-11-10
    • Kamisho Kk上商株式会社
    • UEMI TOSHIO
    • E04D13/18E04D3/40E04D13/00H01L31/042
    • F24J2/5249F24J2/5205Y02B10/12Y02B10/20Y02E10/47
    • PROBLEM TO BE SOLVED: To provide an installation structure of a solar cell module on a standing seam roof, which is capable of stably supporting a cell module support bar and a solar cell module and of sufficiently withstanding strong winds, earthquakes, and the like.SOLUTION: A roof plate pressing member 14 which is also used as a trestle is formed by folding downward a top plate 15 for supporting a cell module support bar 4 and a pair of right and left side plates 16 from the left and right side edges of the top plate 15. The roof plate pressing member 14 which is also used as a trestle covers a seam clip 2 and the left and right rising connection edges 6 of roof plates 1 and 1 from above, while the top plate 15 of the roof plate pressing member 14 which is also used as a trestle is fixed to a top part 12 of the seam clip 2 with a second screw 26, and the roof plates 1 and 1 are pressed down by roof plate pressing portions 16a provided in the lower ends of the left and right side plates 16 from above.
    • 要解决的问题:提供一种在立式接缝屋顶上的太阳能电池组件的安装结构,其能够稳定地支撑电池模块支撑杆和太阳能电池组件,并充分承受强风,地震和 类似。 解决方案:也用作托架的屋顶板按压构件14通过向下折叠用于支撑电池模块支撑杆4的顶板15和左右两侧的一对左右侧板16而形成 顶板15的侧边缘。也用作支架的屋顶板按压构件14从顶部覆盖顶盖板1和1的缝夹2和顶板1和1的左上升连接边缘6,而顶板15 也用作支架的屋顶板按压构件14用第二螺钉26固定到接缝夹2的顶部12,并且顶板1和1被设置在第二螺钉26中的顶板按压部16a压下 左右侧板16的下端从上方。 版权所有(C)2012,JPO&INPIT
    • 8. 发明专利
    • Flushing structure of curtain wall
    • 窗帘冲洗结构
    • JP2008133634A
    • 2008-06-12
    • JP2006319550
    • 2006-11-28
    • Kamisho Kk上商株式会社
    • UEMI TOSHIOSATO HIDENOBU
    • E04B2/90
    • PROBLEM TO BE SOLVED: To provide a flushing structure of a curtain wall, which can prevent the occurrence of a difference between barometric pressures in a vertical joint, and which is excellent in on-site constructibility because the inside of the vertical joint can be easily partitioned in construction on a job site. SOLUTION: In this flushing structure of the curtain wall, a flushing material made of a rubber packing is housed in a section where a horizontal joint HJ and the vertical joint PJ cross each other. Flushing materials 80 for the vertical joint are integrally mounted at the upper ends of the right and left vertical frames 9 and 8 of the curtain walls 1A and 1B in a state in which a part 80a of the flushing material 80 is protruded toward the vertical joint PJ outside the vertical frames 8 and 9, respectively. Protruding ends 80a and 80a of the flushing materials 80 and 80 horizontally adjacent to each other butt against each other in the state of adhesion in the vertical joint PJ, so as to vertically partition the inside of the vertical joint PJ. COPYRIGHT: (C)2008,JPO&INPIT
    • 要解决的问题:提供一种幕墙的冲洗结构,其能够防止垂直接头中的大气压的差异的发生,并且由于垂直接头的内部具有优异的现场可施加性 可以在施工现场轻松分割。 解决方案:在幕墙的这种冲洗结构中,由水平接头HJ和垂直接头PJ彼此交叉的部分容纳由橡胶垫圈制成的冲洗材料。 用于垂直接头的冲洗材料80一体地安装在幕墙1A和1B的左右垂直框架9和8的上端,其中冲洗材料80的部分80a向垂直接头突出的状态 PJ分别在垂直框架8和9之外。 水平相邻的冲洗材料80和80的突出端部80a和80a在垂直接头PJ中以粘合的状态相互对接,以便垂直分隔垂直接头PJ的内部。 版权所有(C)2008,JPO&INPIT
    • 9. 发明专利
    • Drying apparatus for hydrous matter and garbage drying apparatus
    • 干燥设备用于水泥和干燥设备
    • JP2004125387A
    • 2004-04-22
    • JP2003318782
    • 2003-09-10
    • Kamisho KkYuichi Kitakakigai上商株式会社北垣外 友一
    • UEMI TOSHIOKITAKAKIGAI YUICHIOSUGA NORISUKE
    • F26B17/18B09B3/00F26B3/30F26B9/06F26B17/14F26B25/00
    • PROBLEM TO BE SOLVED: To uniformly and quickly dry drying object by extensively developing the drying object over nearly whole surfaces of both a diffusing placing plate and a gathering placing plate while breaking up the drying object into pieces to increase both a development surface area and a specific surface area of the drying object. SOLUTION: The drying object 5 falling onto a plate center part of the diffusing placing plate 8 from above is received on the diffusing placing plate 8, is diffused and moved from the plate center part toward a plate periphery part by a diffusion operation means 9 while forming the drying object 5 in a nearly spiral strip state by the diffusion operation means 9, and is made to fall from a peripheral part fall port 10. The drying object 5 falling onto a plate periphery part of the gathering placing plate 11 from above is received on the gathering placing plate 11, is gathered and moved from the plate periphery part toward a plate center part by a gathering operation means 12 while forming the drying object 5 in a nearly spiral strip state by the gathering operation means 12, and is made to fall from a center part fall port 13. COPYRIGHT: (C)2004,JPO
    • 要解决的问题:通过在将干燥物体分解成碎片的同时在扩散板和聚集放置板的几乎整个表面上广泛地显影干燥物体来均匀且快速地干燥干燥物体,以增加显影表面 面积和干燥物体的比表面积。 解决方案:从上方将散落放置板8的板中心部分的干燥物体5接收在漫射放置板8上,通过扩散操作被从板中心部分向板周边部分扩散移动 装置9,同时通过扩散操作装置9将干燥物体5形成为几乎螺旋状的状态,并使其从周边部分落下端口10落下。干燥物体5落在聚集放置板11的板周边部分 从聚集装置板11收纳在聚集装置板11上,通过聚集操作装置12从板周边部分向板中心部分收集并移动,同时通过聚集操作装置12将干燥物体5形成为几乎螺旋状的状态, 并从中心部分的下降口13落下。版权所有(C)2004,JPO
    • 10. 发明专利
    • Mounting structure of curtain wall
    • 幕墙安装结构
    • JP2008081934A
    • 2008-04-10
    • JP2006260165
    • 2006-09-26
    • Kamisho Kk上商株式会社
    • UEMI TOSHIOSATO HIDENOBU
    • E04B2/90
    • PROBLEM TO BE SOLVED: To provide a mounting structure of a curtain wall, which has the proper property of following up the relative story displacement of a building, which can enhance the mounting workability of the curtain wall, and which can reduce the number of components for a fastener and the number of man-hours for assembly.
      SOLUTION: This curtain wall 1A is mounted on a skeleton 3 via the fastener 2. The curtain wall 1A is equipped with a four-side frame 5 which is formed of right and left vertical frames 8 and 8, and upper and lower horizontal frames 10A and 10B, composed of an extrusion mold. A guide rail 12 is horizontally and integrally molded on the backsides of at least the upside or downside horizontal frame 10A or 10B. The fastener 2 comprises a mounting bracket 65 with a vertically-long slot 64, which is fixed to the side of the skeleton 3, and a mounting bolt 66 with a head, which is inserted into the vertically-long slot 64. The head 66a of the mounting bolt 66 is slidably fitted in an anti-coming-off manner into the guide rail 12.
      COPYRIGHT: (C)2008,JPO&INPIT
    • 要解决的问题:提供一种幕墙的安装结构,其具有跟随建筑物的相对故事位移的适当性能,这可以提高幕墙的安装可操作性,并且可以减少 紧固件的部件数量和组装工时数。 解决方案:该幕墙1A经由紧固件2安装在骨架3上。幕墙1A配备有由左右垂直框架8和8形成的四边框架5,以及上下 水平框架10A和10B,由挤压模具组成。 导轨12水平地并整体地模制在至少上侧或下侧的水平框架10A或10B的背面上。 紧固件2包括安装支架65,其具有固定在骨架3的侧面上的垂直长度的槽64和具有头部的安装螺栓66,该头部插入垂直长的槽64中。头部66a 安装螺栓66以防脱落的方式可滑动地装配到导轨12中。版权所有(C)2008,JPO&INPIT