会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 83. 发明专利
    • JUDGING METHOD FOR LANDSCAPE BY MEANS OF COLOR
    • JPH0816789A
    • 1996-01-19
    • JP15340194
    • 1994-07-05
    • KAJIMA CORP
    • SAKUSE NOBUOMACHII MINORI
    • G06T11/60G06T1/00G06T7/00
    • PURPOSE:To provide the color deciding method for landscape to be easily used. CONSTITUTION:Landscape 1 of a deciding object is photographed by a color image pickup machine 2, and a positive color image 3 is prepared. The positive color image 3 is divided into plural small blocks in an equal area, and a preferentially occupying color with the largest occupied area is detected out of colors contained in the respective small blocks 5. The preferentially occupying colors of respective small blocks 5 are classified according to a color classification table 6 composed of plural prescribed colors, and the number of classified small blocks 5 is accumulated for each prescribed color. By calculating the ratio of the number of accumulated small blocks 5 for each prescribed color to the total number of small blocks 5, the ratio of the color of landscape 1 is numerically decided. By utilizing a color copy machine or the like equipped with a digital image processing function, the preferentially occupying colors of respective small blocks 5 can be detected from the positive color image 3 as well.
    • 90. 发明专利
    • Revetment with preparation base such as dry beach
    • 作为干燥海滩的准备基地的改造
    • JP2008156964A
    • 2008-07-10
    • JP2006348896
    • 2006-12-26
    • Kajima Corp鹿島建設株式会社
    • SAKUSE NOBUOAOKI SHUJISHIBATA MASANORIYANAGISAWA HIROSHIMASUDA MASAHIROMORI YASUHIROKIDOKORO TOSHIRO
    • E02B3/00E02B3/04
    • PROBLEM TO BE SOLVED: To provide a revetment with a preparation base such as a dry beach, capable of forming an environment adaptive even to organisms using the preparation base such as the dry beach as a habitable space, by holding a stable state with excellent workability, when extending the preparation base such as the dry beach, a tidal basin, an inlet and a shallow place in a revetment body. SOLUTION: This preparation base such as the dry beach 8 is constructed by filling a solidification material 7 or the solidification material 7 and an infilling material 6 such as fluidization treated earth being a base 5 of the dry beach 8 in a cavity part 4, by forming the cavity part 4 by a frame body 2 on a front face or the inside of the revetment body 1. COPYRIGHT: (C)2008,JPO&INPIT
    • 要解决的问题:为了提供具有诸如干沙滩的准备基座的护岸,能够使用诸如干沙滩等准备基础的生物体形成适应环境的适应性,通过保持稳定的状态 具有优良的可加工性,当延伸准备基地如干沙滩,潮汐盆地,入口和浅的地方在护岸体内。 解决方案:这种制备基底如干沙滩8是通过将固化材料7或固化材料7和诸如流化处理的土壤的填充材料6填充在干燥海滩8的基部5中而构成的空腔部分 通过在护体1的正面或内侧上由框体2形成空腔部4。版权所有(C)2008,JPO&INPIT