会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 80. 发明专利
    • SKEW PILE DRIVING WORK
    • JPS61221413A
    • 1986-10-01
    • JP5856585
    • 1985-03-25
    • KAJIMA CORP
    • YOSHINO YUICHITAKAGI JUNICHI
    • E02D5/38E02D5/54E02D7/00
    • PURPOSE:To prevent the degradation of the wall of an excavated pit by a method in which the ground is excavated by a bit of expanded diameter within a steel tubular pile, the diameter of the bit is contracted, and an anchor pile is forcibly penetrated into the excavated pit. CONSTITUTION:A steel tubular pile 1 is driven at a given inclined angle to a rockbed B into a deposit layer A, and an excavator 10 is inserted into the pile 1. A pit 13 of expanded diameter is penetrated through the layer A and the rockbed B and excavation is made to a given depth. The diameter of the bit 13 is contracted, a jack is also contracted, and an anchor pile 4 is penetrated into the excavated pit D. While the diameter of the bit 13 is contracted, excavation is made, and the pile 4 is repeatedly penetrated until the degradation of the pit D is stopped. The diameter of the bit 13 is then expanded, and while repeating the execution of excavation and the penetration of the pile 4, the pile 4 is forcibly penetrated to a given depth. After the excavator 10 is removed, cement mortar C is packed into the space between the pile 4, the rockbed B, and the pile 1 and also into the inside of the pile 1.