热词
    • 33. 发明专利
    • HANGING SCAFFOLD DEVICE
    • JP2001107557A
    • 2001-04-17
    • JP28429499
    • 1999-10-05
    • ISHIKAWAJIMA HARIMA HEAVY IND
    • FUJIWARA HIROYUKI
    • E04G3/28E04G3/10
    • PROBLEM TO BE SOLVED: To reduce the labor and time required for installing and removing a working scaffold. SOLUTION: Temporary beam members 2 with pulleys 3 installed thereon are freely detachably extended on the top of a cyclone body 1. Pulleys 5 are provided on two corners extending along one long side of a rectangular hanging scaffold body 4, and a manually operated winch 6 with a wire rope 7 wound thereon and a fixing part 8 for attaching the end of the wire rope 7 thereto are provided on two corners extending along the other long side. After the hanging scaffold body 4 is positioned at the bottom of the cyclone body 1, the wire rope 7 wound on the manually operated winch 6 is hung around the pulleys 3, 5 and has its end attached to the fixing part 8 to hang the hanging scaffold body 4 down from the temporary beam members 2. The hanging scaffold body 4 is raised or lowered by the manually operated winch 6 to perform construction work for fireproofing an overall interior wall surface from the bottom to top of the cyclone body 1.
    • 36. 发明专利
    • HANGING SCAFFOLD FOR STAIRS
    • JP2000213161A
    • 2000-08-02
    • JP1653799
    • 1999-01-26
    • TAISEI CORPKKL KK
    • AIKAWA YOSHIROOKA MASATO
    • E04G3/00E04G3/10
    • PROBLEM TO BE SOLVED: To provide a temporary hanging scaffold which can be easily installed or removed without narrowing a stairs passageway or closing the passageway by obstacles and through which finish works to the rear side of the stair steps or the rear side of a landing or the like can be carried out. SOLUTION: This hanging scaffold for stairs which can be adapted for stairs having landings, is constituted of a hanging plate 1 as a fixing tool attached to the rear face of the landing floor K of the stairs, a hanging scaffold frame 2 hung down from the landing floor K and fixed thereto by the hanging plate 1, steel ledger boards 3 as horizontal ledger boards laid down on the bottom face of the hanging scaffold frame 2, and extensible steel bridges 4 as oblique scaffold plates obliquely laid between adjacent hanging scaffold frames 2, 2. Extensible jacks 5 are put between the hanging scaffold frames 2 and the rear faces of the landing floors K of the stairs.
    • 40. 发明专利
    • SUSPENDING METAL FITTING FOR SUSPENDED SCAFFOLD
    • JP2000129909A
    • 2000-05-09
    • JP30836998
    • 1998-10-29
    • PENTA OCEAN CONSTRUCTION
    • SATO NAOSHI
    • E04G3/00E04G3/10
    • PROBLEM TO BE SOLVED: To easily form a suspended scaffold for a work of ceiling or the like by movably and rotatably providing a pair of mounting bodies on a horizontal pipe provided between the upper parts of opposed flat plates, providing a horizontally rotatable nipping tool on the mounting body, and providing a suspending plate for mounting a scaffold steel pipe between the lower parts of the flat plates. SOLUTION: This suspending metal fitting for scaffold is formed of nipping tools 7 for nipping the flange of a steel beam and hanging plates 8 for suspending a suspended scaffold, and a scaffold plate is laid between scaffold steel pipes suspended every proper interval to form a suspended scaffold. The U-shaped nipping tool 7 in a front view can be fixed to the flange of the steel beam by a fixing bolt 9 on its upper surface 9. This nipping tool 7 is mounted on a mounting body 10 in such a manner as to be rotatable around a vertical shaft 7a, and the mounting body 10 is fitted to a horizontal pipe 12 between flat plates 11 in such a manner as to be movable, so that the rotation around the vertical shaft 7 and the movement of the horizontal pipe 12 can be regulated by regulating bolts. The hanging plate 8 is welded to an L-shaped angle between the flat plates 11, and mounting holes 15 for mounting the scaffold steel pipe are provided at proper intervals so that the height of the scaffold is adjustable.