    • HOLLOW FLOOR SLAB BRIDGE AND CONSTRUCTION THEREOF
    • JPH11158812A
    • 1999-06-15
    • JP33026897
    • 1997-12-01
    • DPS BRIDGE WORKS CO LTD
    • IMAMURA AKIHISA
    • E01D1/00E01D2/00E01D21/00E01D101/24E01D101/26E01D101/28
    • PROBLEM TO BE SOLVED: To prolong a span, and to simplify the temporary construction by dividing one span into three blocks, and forming an intermediate block with the composite structure of the cast-in-place concrete for connecting beam members to each other, forming blocks in both sides of the intermediate block of the cast-in-place concrete, and integrating the whole blocks by a PC cable. SOLUTION: Among bridge beam in one span divided into three blocks, an intermediate block is formed of plural precast concrete beam members 1 prestressed and the cast-in place concrete, and both side blocks are formed of the cast-in place concrete 6. Plural beam members 1 are stretched in the intermediate blocks of the one span with a space in the cross direction, and the beam members 1 adjacent to each other in the cross direction are bonded by the cast-in-place concrete. The adjacent beam members 1 are bonded to each other at upper ends and lower ends thereof, and the intermediate block of the bridge beam is formed so as to have a chained cross section over the whole area. A PC cable 7 is arranged along he tensile side of the bridge beam, and stretched over the full length of the bridge beams.
    • 33. 发明专利
    • Concrete floor slab replacing method
    • 混凝土地板修补方法
    • JP2009264040A
    • 2009-11-12
    • JP2008116673
    • 2008-04-28
    • Dps Bridge Works Co Ltdドーピー建設工業株式会社
    • YASUMORI HIROSHIHASEGAWA TAKESHI
    • E01D22/00
    • PROBLEM TO BE SOLVED: To provide a concrete floor slab replacing method for carrying out replacement and repair work in a short time and at a low cost in replacing and repairing an existing floor slab using a precast floor slab. SOLUTION: Precast PC floor slabs 2 manufactured in a factory are installed on a main girder after removing the existing concrete floor slabs on the main girder, and the precast PC floor slabs 2, 2 adjacent in a bridge axis direction are joined to each other by a loop joint structure 3 of RC structure with loop reinforcements 11. The overlap joint length of the loop reinforcements 11 is set to an approximately circular minimum length to minimize a joining joint width W. Further, no reinforcement (no floor slab main reinforcement) perpendicular to the bridge axis direction is inserted and arranged in the circular space S formed by lapped semicircular loop parts 12, 12, and short fiber mixed concrete 15 is filled in the joint space 10 to enhance a restricting effect. COPYRIGHT: (C)2010,JPO&INPIT
    • 要解决的问题:提供一种在短时间内以低成本进行更换和维修工作的混凝土地板更换方法,以使用预制地板更换和修理现有的地板。 解决方案:在拆除主梁上现有的混凝土楼板之后,在工厂制造的预制PC楼板2安装在主梁上,并且沿桥轴方向相邻的预制PC楼板2,3连接到 彼此通过具有环形加强件11的RC结构的环形接头结构3彼此。环形加强件11的重叠接头长度被设定为近似圆形的最小长度,以使接合接头宽度W最小化。此外,没有加强件 插入和布置在由凸起的半圆环部分12,12形成的圆形空间S中,并且将短纤维混合混凝土15填充在接合空间10中以增强限制效果。 版权所有(C)2010,JPO&INPIT