    • 22. 发明专利
    • BUILDING METHOD FOR STRUCTURAL BODY OF BUILDING
    • JP2000199278A
    • 2000-07-18
    • JP32999
    • 1999-01-05
    • KAWASAKI HEAVY IND LTDKAJIMA CORP
    • TOMITA TSUTOMUMATSUDA TOMOAKIISHIDA KIMINARITAKAHASHI TAKASHIMIZUTANI AKIRAYOSHII AKITOSHI
    • E04B1/35E04G21/14E04G21/16
    • PROBLEM TO BE SOLVED: To provide load lifting equipment and a building method capable of efficiently obtaining a building of a stable quality. SOLUTION: This method comprises a first process in which a load lifting equipment D' is arranged at an inground middle main column 33 and, on the other hand, the penthouse floor and the highest floor are assembled, and a lifting beam 44 of a weight lifting equipment D' is arranged to the bottom surface of both the beams of the middle main column 32, a second process in which the highest floor layer is lifted to a height corresponding to one layer story and the whole load is transferred to a temporary receiving column 32b and the lifting beam 44 is made free, a third process in which the lifting beam 44 is further lowered and a beam-receiving base 47 is interposed to the lower surface of the lifting beam 44, a fourth process in which the structural body of building is lifted more than one story layer by weight lifting bodies A, D', the lifting beam 44 is transferred to a foundation pipe and the beam of the next story layer is assembled between the main columns, and a fifth process in which the lifting beam 44 is lowered to the lowest level and then the lifting beam 44 is reset again to the initial position. Then, the processes 2 to 5 are repeatedly performed and the building construction work for first floor layer is completed by the sixth process in which the lower end of the middle main column 32 is coupled to the foundation pile.
    • 24. 发明专利
    • SUSPENDER OF FOLDED-SLAB MATERIAL
    • JPH11159092A
    • 1999-06-15
    • JP33014297
    • 1997-12-01
    • KAJIMA CORP
    • MIZUTANI AKIRATAKAHASHI TAKASHI
    • E04D15/04
    • PROBLEM TO BE SOLVED: To improve workability by gripping folding-back parts arranged in end parts of rising pieces on the left and right both sides of a folded-slab material by a gripping device, and installing a suspending piece and an arm to press them in the folding-back part direction on the tip of this gripping device. SOLUTION: A suspender 3 is formed of a gripping device 4 composed of clamps 9 to grip folding-back parts 2 formed in end parts of rising pieces on the left and right both sides of a folded-slab material 1, an arm 5 to press them in the folding-back part 2 direction and a suepending piece 12. Next, the left and right clamps 9 are pressed to the inside of the folding-back parts 2 by arranging two bar members 6a and 6b against resiliency of a tension spring 8 by setting this suspender 3 inside the folded-plate material 1. A horizontal part 2b and a bending part 2c of the folded-slab material 1 are sandwiched/ fixed by a pressing piece 9b and a main body 9a by pressing the horizontal part 2b of the folded-slab material 1 by the pressing piece 9b by pushing screws 9c in the clamps 9. Therefore, a stable state can be held without inclining the folded-slab material at suspending time.