会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 22. 发明专利
    • SUSPENDING DEVICE FOR EXTERIOR WALL MATERIAL
    • JPH0762879A
    • 1995-03-07
    • JP20944293
    • 1993-08-24
    • KAJIMA CORP
    • UEDA AKIROOWAKI MITSUHISAMIZUTANI AKIRAMIYAMOTO TAKEZOKISHI MITSUTERUHIGUCHI YASUO
    • B66C1/02B66C1/62E04G21/16
    • PURPOSE:To increase workability and safety of the fitting works of exterior wall materials, by fitting a vacuum pump and a battery on a frame and suspending them for sucking and holding exterior wall materials and setting the battery so as to be approachable to a sucking position or separable therefrom. CONSTITUTION:A frame 1 is forced to approach exterior materials C piled on the ground by a crane or the like and the exterior materials are sucked and held at the suction part 40 by means of a vacuum pump 7 driven. At this time, the pump 7 can be driven by an operation switch which an operator waiting on scaffolds of a building is carrying. And a manual switch is provided at a control section 4 and it can be operated on the ground. The exterior materials are transferred close to the exterior wall W of the building by the movement of crane or the like in the state that the exterior material C is sucked at the suction part 40. Next, an operator waiting on scaffolds pulls the material C toward himself and fits it to the exterior wall. And the running of vacuum pump 7 is stopped by the operator's manipulation. Subsequently, the suction part 40 is removed from the exterior material C. When the exterior material is removed, the battery 6 is shifted to adjust the balance.
    • 23. 发明专利
    • PUSHING-UP DEVICE FOR BUILDING FRAME
    • JPH0762877A
    • 1995-03-07
    • JP21160993
    • 1993-08-26
    • KAJIMA CORP
    • MIYAMOTO TAKEZOUEDA AKIROMIZUTANI AKIRAKIKUCHI KENJIKISHI MITSUTERU
    • E04G21/16
    • PURPOSE:To adjust the level and inclination of a temporary receiving beam, by providing a pierced hole through which the temporary receiving beam is inserted or pulled out, in the column of a pushing-up device erected on a base and supporting the front and rear parts of temporary receiving beam and arranging sub-jacks. CONSTITUTION:When a building frame 1 is pushed up on columns 1 and the building frame T of the subsequent floor is added thereto, the holes of columns 1 are pierced and the temporary receiving beam 10 is horizontally shifted by a geared motor and rollers. Next, the column 1 is fitted and the level and inclination of the temporary receiving beam 10 are adjusted by a sub-jack 23. And the previously raised building frame T is transferred from the upper load- receiving beam 5 of the pushing-up device to the fitted temporary receiving beam 10 to support the building frame T by the temporary receiving beam 10. And further, the pushing-up device is removed once and the next lower building frame T is connected and the pushing-up device is equipped after completion of additional connection of the building frame and the next pushing-up is carried out.