会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 12. 发明专利
    • Program, method and image processing device for detecting update of image information,
    • 用于检测图像信息更新的程序,方法和图像处理装置,
    • JP2009145932A
    • 2009-07-02
    • JP2007319351
    • 2007-12-11
    • Toshiba Corp株式会社東芝
    • MINEMATSU MIYOSHIGOTO MASATAKANISHIBAYASHI YASUYUKIMURAI SHINYA
    • G06F9/46G06T1/60G09G5/00
    • G06F9/45533
    • PROBLEM TO BE SOLVED: To provide an image processing device for detecting update of image information at appropriate timing without alternating a guest OS. SOLUTION: The device includes a frame buffer 114a storing image information; a processor 111, which transits from a first mode that causes a guest OS 130 to operate to a second mode that causes a VMM 120 to operate when a predetermined transition condition is satisfied; a determining unit 122 determining a factor of transition when the processor 111 has transited into the second mode; and a detection unit 142 detecting an updated portion of the image information representing an unmatched portion of the image information between before and after writing if the determining unit 122 determines that the execution of processing related to completion of writing of the image information to the buffer 114a on the OS 130 is the factor of the transition. COPYRIGHT: (C)2009,JPO&INPIT
    • 要解决的问题:提供一种图像处理装置,用于在不交替的客户OS的情况下在适当的定时检测图像信息的更新。 解决方案:该装置包括存储图像信息的帧缓冲器114a; 处理器111,其从第一模式转换,使第一模式使得客户OS 130运行到第二模式,使得当满足预定转换条件时使VMM 120工作; 确定单元122,当处理器111已经转换到第二模式时,确定转换因子; 以及检测单元142,如果确定单元122确定与缓冲器114a的图像信息的写入完成相关的处理的执行,则检测表示在写入之前和之后的图像信息的不匹配部分的图像信息的更新部分的更新部分 在OS 130上是转型的因素。 版权所有(C)2009,JPO&INPIT
    • 13. 发明专利
    • 制御装置、電力変換装置、制御方法、プログラム及び制御システム
    • 控制器,电源转换器,控制方法,程序和控制系统
    • JP2015061448A
    • 2015-03-30
    • JP2013194647
    • 2013-09-19
    • 株式会社東芝Toshiba Corp
    • KANEYAMA FUMIAKIKONO YUSUKENOGI MASAYUKINISHIBAYASHI YASUYUKIAOYAMA IKUYA
    • H02M7/493H02M7/48
    • H02M7/493H02J3/40Y10T307/352Y10T307/406
    • 【課題】システムの柔軟性があり、かつ同期信号を送信する装置が予期せず停止した場合にもシステムの連続運転を維持する。【解決手段】通信部が、電力線に電力を出力する他の一台以上の電力変換装置の制御装置と通信する。同期信号部が、上記電力変換装置の出力電力の位相の基準となる同期信号を、受信する。電力位相制御部は、上記同期信号に基づいて前記電力変換装置が上記電力線へ出力する電力の位相を制御し、前記同期信号の途絶を検知した場合、途絶前に受信された同期信号に基づいて、上記電力変換装置が前記電力線へ出力する電力の位相を制御する。通信制御部は、上記電力位相制御部が上記途絶前に受信された同期信号に基づいて制御している間、上記同期信号を送信するマスターを決定するための情報を、受信するかまたは送信するかのどちらか一方を行うよう上記通信部を制御する。【選択図】図10
    • 要解决的问题:即使当用于发送同步信号的装置意外停止时,使系统灵活并且保持系统的连续操作。解决方案:电力转换器的控制器包括:通信单元,用于与一个控制器通信 或更多的其他功率转换器,用于向电力线输出功率; 同步信号单元,用于接收要参考功率转换器的输出功率的相位的同步信号; 功率相位控制单元,其基于同步信号控制由功率转换器输出到电力线的功率的相位,并且当检测到同步信号的中断时,控制输出到电力线的功率的相位 由功率转换器基于在中断之前接收到的同步信号; 以及通信控制单元,用于控制所述通信单元,使得所述通信单元在由所述电力相位控制单元基于接收的所述同步信号进行的控制期间,执行用于确定用于发送所述同步信号的主设备的信息的接收和发送 在中断之前。
    • 14. 发明专利
    • 電力変換装置、協調制御方法およびプログラム
    • 电力转换装置,合作控制方法和程序
    • JP2015050834A
    • 2015-03-16
    • JP2013180443
    • 2013-08-30
    • 株式会社東芝Toshiba Corp
    • NISHIBAYASHI YASUYUKIISE TSUNETAROSAKAMOTO TAKEFUMITOSAKA YUJIAOYAMA IKUYA
    • H02J3/38
    • H04B3/542H02J13/00H04B2203/5495H04L25/49H04L25/4902
    • 【課題】複数の異なる電力変換装置間で自律協調制御を各装置の特性を考慮して適正に行う。【解決手段】電力変換装置において、第1接続部および第2接続部は、複数の電力線のうちの第1の電力線および第2の電力線に接続し、電力変換部は、前記第1および第2接続部の一方から入力された電力を変換して他方から出力し、通信部は、他の電力変換装置と通信し、制御部は、前記通信部を用いて他の電力変換装置の電力属性情報と通信属性情報を取得し、取得した電力属性情報と通信属性情報、および前記電力変換部の電力属性情報と前記通信部の通信属性情報とに基づき、前記複数の電力線のうちの少なくとも1つのある電力線に接続された電力変換装置群が前記電力線に対し入出力する電力量の配分に関する電力分担制御の主体となる電力変換装置と、前記電力線に接続された電力変換装置群が前記電力線に出力する電力の位相同期に関する電源位相制御の主体となる電力変換装置を決定する。【選択図】図6
    • 要解决的问题:通过考虑每个装置的特性来适当地执行多个不同的电力转换装置之间的自动协调控制。解决方案:在电力转换装置中,第一连接单元和第二连接单元连接到第一 电力线和多条电力线中的第二电力线,电力转换单元将从第一和第二连接单元中的一个输入的电力转换为另一电力线,并且从另一方输出转换电力,通信单元与其他电力转换装置通信, 并且控制单元通过使用通信单元获取关于其它功率转换装置的功率属性信息和通信属性信息,并且基于所获取的功率属性信息和通信属性信息以及关于功率转换单元的功率属性信息 和关于的通信属性信息 通信单元,电力转换装置,其通过一组电力转换装置将多个电力线中的至少一个电力线上输入和输出的功率量的分配中的功率共享控制中的主要部分, 连接到电力线和电力转换装置,其通过连接到电力线的一组电力转换装置,在与电力线输出的电力的相位同步相关的电源相位控制中起主要作用。
    • 15. 发明专利
    • Gateway device and method thereof and charge/discharge system
    • 网关设备及其方法和充电/放电系统
    • JP2014073053A
    • 2014-04-21
    • JP2012219705
    • 2012-10-01
    • Toshiba Corp株式会社東芝
    • YONEZAWA YUKINISHIBAYASHI YASUYUKITERAMOTO KEIICHIISE TSUNETARO
    • H02J7/00
    • H02J7/0068H02J3/32H02J3/386H02J13/0006Y02B70/3216Y02E10/763Y02E40/72Y02E60/722Y02E70/30Y04S10/123Y04S10/14Y04S20/221
    • PROBLEM TO BE SOLVED: To realize a large-scale system having a high-order energy management system disposed for an energy management system.SOLUTION: A gateway device in one aspect of the present invention comprises: a management unit; an assignment unit; a receiving unit; a generation unit; and a transmission unit. The management unit manages at least one storage battery group which is a combination of one or more storage battery systems selected from among a plurality of storage battery systems. The assignment unit assigns, to a first charge/discharge instruction device, a first storage battery group which is one among the at least one storage battery group. The receiving unit receives a charge or discharge-related instruction from the first charge/discharge instruction device. The generation unit generates, on the basis of the instruction, a first control command which is a control instruction for the storage battery systems belonging to the first storage battery group. The transmission unit transmits the first control command to the storage battery systems.
    • 要解决的问题:实现具有为能量管理系统设置的高阶能量管理系统的大型系统。解决方案:本发明的一个方面的网关设备包括:管理单元; 分配单位; 接收单元; 一代; 和发送单元。 管理单元管理至少一个蓄电池组,其是从多个蓄电池系统中选择的一个或多个蓄电池系统的组合。 分配单元向第一充电/放电指示装置分配作为至少一个蓄电池组中的一个的第一蓄电池组。 接收单元从第一充电/放电指令装置接收充电或放电相关指令。 生成单元基于该指示生成作为属于第一蓄电池组的蓄电池系统的控制指示的第一控制指令。 传输单元将第一控制命令发送到蓄电池系统。
    • 16. 发明专利
    • Charge/discharge controller, charge/discharge control system, and charge/discharge control program
    • 充电/放电控制器,充电/放电控制系统和充电/放电控制程序
    • JP2013207982A
    • 2013-10-07
    • JP2012076624
    • 2012-03-29
    • Toshiba Corp株式会社東芝
    • NISHIBAYASHI YASUYUKITERAMOTO KEIICHIISE TSUNETAROTANAKA YASUYUKI
    • H02J7/00H02J7/02H02J7/34H02J13/00
    • H02J7/0013H02J7/0022H02J7/0027H02J7/0073
    • PROBLEM TO BE SOLVED: To provide a charge/discharge controller, charge/discharge control system, and charge/discharge control program capable of efficiently performing communication even when the number of power units connected to a network increases.SOLUTION: A charge/discharge controller according to an embodiment comprises a reception section and group control section. The reception section receives schedule information showing schedule time at which a plurality of power units having at least one of charge and discharge functions perform at least one of charging and discharge. The group control section performs grouping according to the schedule information so that the respective power units belong to either of a charging group for performing charging and a discharge group for performing discharge, and controls the power units for each of the charging group and discharge group.
    • 要解决的问题:提供即使当连接到网络的功率单元的数量增加时,也能够有效地执行通信的充放电控制系统,充放电控制系统和充放电控制程序。解决方案:充放电控制器 根据实施例包括接收部分和组控制部分。 接收部分接收表示具有充电和放电功能中的至少一个的多个功率单元执行充电和放电中的至少一个的调度时间的时间表信息。 组控制部根据进度信息进行分组,使得各个功率单元属于用于进行充电的充电组和用于进行放电的放电组中的任一个,并且控制每个充电组和放电组的功率单元。
    • 17. 发明专利
    • Charge and discharge determination device and program
    • 充电和放电确定设备和程序
    • JP2012205436A
    • 2012-10-22
    • JP2011069145
    • 2011-03-28
    • Toshiba Corp株式会社東芝
    • NISHIBAYASHI YASUYUKIISE TSUNETAROTERAMOTO KEIICHIWADA TAKAHISA
    • H02J3/46H01M10/44H02J3/00H02J3/32H02J3/38H02J7/00H02J7/34H02J7/35
    • H01M10/482H02J3/32H02J3/383H02J3/46H02J13/0055Y02E10/563Y02E10/566Y02E40/72Y02E60/722Y02E70/30Y04S10/123Y04S10/14
    • PROBLEM TO BE SOLVED: To stabilize an electric power system network when natural energy is incorporated as an electric power supply source in the electric power system network.SOLUTION: A charge and discharge determination device includes: a system information acquisition part which acquires an actual value as a value of electric power that a natural energy power generation device actually supplies; a battery information acquisition part which acquires charge/discharge electric power amount information from a storage battery; a determination part which transmits an indication message for changing supply electric power to a power plant when the absolute value of a difference between a plan value of electric power that the natural energy power generation device supplies and the actual value exceeds a predetermined threshold, compares a deficient electric power amount or excessive electric power amount found from a delay time needed to change the supply electric power of the power plant, and the difference between the plan value and actual value with charge/discharge electric power amounts found from charge/discharge electric power amount information of a plurality of storage batteries, and determines a storage battery whose charge/discharge electric power amount exceeds the deficient electric power amount or excessive electric power amount among the plurality of storage batteries as a storage battery to be charged or discharged.
    • 要解决的问题:当在电力系统网络中将自然能量作为电力供应源并入时,稳定电力系统网络。 解决方案:充放电确定装置包括:系统信息获取部,其获取实际值作为自然能量发电装置实际供电的电力值; 电池信息获取部,其从蓄电池获取充放电电量信息; 确定部,其在自然能发电装置供给的电力的平均值与实际值超过规定的阈值之间的绝对值的绝对值的情况下,向发电厂发送用于变更供给电力的指示信息, 从改变发电厂的供电电力所需的延迟时间中找到的电力不足或电力过剩以及从充放电电力发现的充放电电力量的平均值与实际值之差 并且确定充电/放电电力量超过作为要充电或放电的蓄电池的多个蓄电池中的不足电力量或过多电力量的蓄电池。 版权所有(C)2013,JPO&INPIT
    • 18. 发明专利
    • Node device, server apparatus, and node connection management method
    • 节点设备,服务器设备和节点连接管理方法
    • JP2012205073A
    • 2012-10-22
    • JP2011067803
    • 2011-03-25
    • Toshiba Corp株式会社東芝
    • OBA YOSHIHIRONISHIBAYASHI YASUYUKI
    • H04L12/56
    • PROBLEM TO BE SOLVED: To provide a node device, a server apparatus, and a node connection management method, which enable management of appropriate connection of devices also in consideration of the topology of a communication network.SOLUTION: A node device includes an acquisition part, a first transmission part, a reception part, and a connection control part. The acquisition part acquires slave node authentication information and slave node identification information from a slave node in advance of establishing a logical connection between the node device and the slave node. The first transmission part transmits the slave node authentication information to an authentication server and transmits topology verification information to a topology verification server. The reception part receives an authentication result of the authentication server and a verification result of the topology verification server. If the slave node is authenticated by the authentication server and if the logical connection between the node device and the slave node is determined to be right by the topology verification server, the connection control part establishes the logical connection between the node device and the slave node.
    • 要解决的问题:提供一种节点设备,服务器设备和节点连接管理方法,其还可以考虑到通信网络的拓扑来管理设备的适当连接。 解决方案:节点设备包括采集部分,第一传输部分,接收部分和连接控制部分。 采集部件在建立节点设备与从节点之间的逻辑连接之前,从从节点获取从节点认证信息和从节点识别信息。 第一传输部分将从节点认证信息发送给认证服务器,并将拓扑验证信息发送到拓扑验证服务器。 接收部分接收认证服务器的认证结果和拓扑验证服务器的验证结果。 如果从节点被认证服务器认证,并且如果拓扑验证服务器确定节点设备和从节点之间的逻辑连接是正确的,则连接控制部分建立节点设备与从节点之间的逻辑连接 。 版权所有(C)2013,JPO&INPIT
    • 19. 发明专利
    • Communication apparatus and communication method
    • 通信设备和通信方法
    • JP2010226223A
    • 2010-10-07
    • JP2009068658
    • 2009-03-19
    • Toshiba Corp株式会社東芝
    • NISHIBAYASHI YASUYUKITERAMOTO KEIICHIDOI YUSUKETERAJIMA YOSHIKIMERA KEISUKE
    • H04M11/04
    • H04L12/10H04L12/2807H04L12/2827
    • PROBLEM TO BE SOLVED: To achieve reliable information transmission even when a main power supply of a device to which information is notified, is not running in a communication system transmitting abnormality information relating to device failures and recalls.
      SOLUTION: The communication apparatus includes: an information generation unit which detects abnormal states of the device and generates the abnormality information; a power supply state storage unit which stores the power supply state of another device which is a partner notified the abnormality information; an information type storage unit which stores abnormality information by types; a determining unit which determines the transmission method of the abnormality information from the power supply state and the abnormality information type; and a communication processing unit which transmits the abnormality information to the device of the notification partner using the transmission method. Because of this configuration, reliable information transmission and device control is performed while the power-saving ability of the device is considered.
      COPYRIGHT: (C)2011,JPO&INPIT
    • 要解决的问题:即使在通知有信息的设备的主电源不在运行与设备故障和召回有关的异常信息的通信系统中的情况下也可以实现可靠的信息传输。 解决方案:通信装置包括:信息生成单元,其检测设备的异常状态并产生异常信息; 电源状态存储单元,其存储作为通知异常信息的合作伙伴的另一设备的电源状态; 信息类型存储单元,其按类型存储异常信息; 确定单元,其从所述电源状态和所述异常信息类型确定所述异常信息的发送方法; 以及通信处理单元,其使用发送方法将异常信息发送到通知对方的设备。 由于这种配置,在考虑设备的节电能力的同时执行可靠的信息传输和设备控制。 版权所有(C)2011,JPO&INPIT
    • 20. 发明专利
    • Power controller and method
    • 功率控制器和方法
    • JP2010200589A
    • 2010-09-09
    • JP2009045933
    • 2009-02-27
    • Toshiba Corp株式会社東芝
    • DOI YUSUKETERAMOTO KEIICHITERAJIMA YOSHIKINISHIBAYASHI YASUYUKI
    • H02J3/00G06Q50/00G06Q50/06H02J13/00
    • H02J3/00H02J3/14H02J9/00H02J13/0006Y02B70/3225Y04S20/222Y10T307/469
    • PROBLEM TO BE SOLVED: To achieve load side control which does not damage a convenience property of a user preventing a blackout. SOLUTION: A power controller includes a calculation means 101 which acquires a power consumption and maximum power capacity each system and contract demand about the whole of system from outside and calculates the rest of power capacity each system and about the whole of system, a detection means 102 which detects whether a necessary reserve force is short or not according to the necessary reserve force showing an estimated quantity of the power consumption of a non-control equipment and the rest of power capacity, a storage means 105 which stores a plurality of power control techniques, a selection means 104 which selects at least one power control technique from the plurality of power control techniques when it is detected that the necessary reserve force is short, and an execution means 105 which executes at least one application of the power control techniques until it is detected that the necessary reserve force is not short and makes at least one power control technique wait so as to be detected that the necessary reserve force is not short if the necessary reserve force is secured. COPYRIGHT: (C)2010,JPO&INPIT
    • 要解决的问题:实现不损害用户防止停电的方便性的负载侧控制。 解决方案:功率控制器包括计算装置101,其从外部获取每个系统的功率消耗和最大功率容量以及整个系统的合同需求,并且计算每个系统和整个系统的剩余功率容量, 检测装置102,其根据表示非控制设备的功耗的估计量的剩余电力检测必要的预备力是否短,以及其余的电力容量;存储装置105,其存储多个 功率控制技术的选择装置104,当检测到必要的预备力较短时,选择装置104从多个功率控制技术中选择至少一个功率控制技术;执行装置105,其执行功率的至少一个应用 控制技术,直到检测到必要的预备力不短并使至少一个功率控制技术等待 o如果确保必要的后备力量,则需要检测到必要的预备力不短。 版权所有(C)2010,JPO&INPIT