    • 15. 发明专利
    • METHOD FOR CONSTRUCTING FLOOR PLATE, FLOOR AND BEAM
    • JPH06123152A
    • 1994-05-06
    • JP27467192
    • 1992-10-13
    • SHIMIZU CONSTRUCTION CO LTD
    • TAKADA HIROOMERANII SHIYOU
    • E04B5/32E04B5/38
    • PURPOSE:To enhance construction properties by mounting a beam mold to the peripheral edge portion of a floor plate made of precast concrete, installing the beam mold in a predetermined position, and then placing concrete on the floor plate and inside the mold, thereby using the mold as a permanent mold. CONSTITUTION:A floor plate mold is installed at a construction site and a beam mold 14 is disposed around the mold and concrete is poured into the floor plate mold so as to fabricate a PICOS plate 11 provided with the mold 14 connected thereto by means of a pin, etc. Next, the plate 11 is placed on floor plate timbering 22 assembled in a predetermined position. Then bottom plates 16 are bent from the side faces 15 of the mold 14 and the lower end portions of the adjacent bottom plates 16 are made to abut to each other and beam timbering 23 is assembled therebelow. Concrete slabs are placed on the plate 11 and inside the mold 14, and a beam which uses the mold 14 as a permanent mold therefor and a composite floor are integrally constructed. The need for the work of installing the beam mold is therefore eliminated, and the labor required and the construction period can both be reduced.
    • 17. 发明专利
    • JPH05239916A
    • 1993-09-17
    • JP23575991
    • 1991-08-23
    • SHIMIZU CONSTRUCTION CO LTD
    • TAKADA HIROO
    • E04G9/10
    • PURPOSE:To improve the durability of concrete with dewatering easily made from the inside of placed concrete by providing small holes for paste-flowing and dewatering in sheathing formed in a layer state with plural fiber-made sheets overlapped. CONSTITUTION:A sheathing 1, in which plural fiber-made sheets are overlapped to made a layer state, is arranged on an inner side of converted framework 4. At that time, sash bars 5 are provided between an inner side surface of the framework 4 and an outside surface of the sheathing 1 to ensure paps. Moreover, small holes 2 for dewatering and paste-flowing, flowing in crossing and inside surface directions of the sheathing 1, are provided. Placing concrete causes water contents and paste, on the one hand, to be flowed from the outer side of the sheathing 1 to gaps of the fiber-made sheet to cross the sheathing 1 to be flowed outward, and on the other hand, to be flowed down in the surface direction in the frame poling board 1 to be flowed in the outside of the sheathing 1. This can make the concrete to be dense to slow down a neutralization speed, to retain alkalinity for a long period, for improving the durability of a building.
    • 20. 发明专利
    • CONSTRUCTING METHOD FOR STRUCTURE
    • JPH03107036A
    • 1991-05-07
    • JP24248889
    • 1989-09-19
    • SHIMIZU CONSTRUCTION CO LTD
    • KONDO KOJISEKI YOICHIMAEDA JUNICHIROABE YOSHIKAZUKAJIOKA YASUOTAKADA HIROO
    • E04B1/35
    • PURPOSE:To improve the productivity of structuring work by constructing the highest part of a structure in the inside of a landslip preventing wall, and pushing up a constructed part using a weight lifting means in a state where it attains a fixed height and can stand for itself, and repeating these works. CONSTITUTION:After constructing a landslip preventing high wall and digging out its inside to perform foundation work, a jack 6 is installed at a position where a pillar 10 on an underground bottom is vertically set. A pillar bottom formwork 15 is then mounted on the upper face of the jack 6, and connection members 12 are set, and mutually connected through a beam 11. In the first constructing work, the beams 11 for two layers and the pillar 10 are constructed at the same time, and a supporting member 17 for horizontal force is inserted between a lateral sheet pile 4 of a landslip preventing wall and the beam 11. A main brace, a bottom formwork and a pillar formwork are then arranged between the upper and lower members 12 for depositing concrete. When the concrete becomes solid to make the self-standing of the pillar or the like possible, the jack 6 is extended to push up one layer of a structural body. The above works are repeated to construct a structure.