会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 11. 发明专利
    • Steel slit dam and method of repairing the same
    • 钢切割机及其修理方法
    • JP2010059647A
    • 2010-03-18
    • JP2008224891
    • 2008-09-02
    • Nippon Steel & Sumikin Metal Products Co Ltd日鐵住金建材株式会社
    • OSUMI HISASHIETO TOMONORIKOKURYO HIROSHISANO KIYOSHITSUTSUI TOMOTERU
    • E02B7/02
    • PROBLEM TO BE SOLVED: To provide a steel slit dam of such a structure that can reduce material cost by minimizing the wasteful use of material when a coarse fragment arresting member is attached to a slit dam body. SOLUTION: This steel slit dam includes a coarse fragment arresting member 5 having: a plurality of column members 31 having circular steel pipes 30 arranged generally parallel to each other at intervals in the river lateral direction; a pair of side frames 51 the outer surfaces 55 of which, respectively, face the mutually opposed upstream side outer peripheral surfaces 30a of two column members adjacent to each other among the plurality of column members 31; and a horizontal beam 53 installed between the pair of side frames 51. COPYRIGHT: (C)2010,JPO&INPIT
    • 要解决的问题:提供一种这样一种结构的钢制狭缝坝,其可以在将粗碎片阻挡构件附接到狭缝坝体时将材料的浪费使用最小化来降低材料成本。 解决方案:该钢缝隙坝包括粗碎片阻挡构件5,其具有:多个柱构件31,其具有在横向方向上以大致平行的方式布置的圆形钢管30; 一对侧框架51,其外表面55分别面对多个柱构件31中彼此相邻的两个柱构件的相对的上游侧外周面30a; 以及安装在该对侧框51之间的水平梁53.版权所有(C)2010,JPO&INPIT
    • 14. 发明专利
    • Stone-filled structure equipped with filter medium storage body, and steel-frame dam
    • 装有过滤介质储存体和钢框架的石材填充结构
    • JP2012112217A
    • 2012-06-14
    • JP2010264346
    • 2010-11-26
    • Nippon Steel & Sumikin Metal Products Co Ltd日鐵住金建材株式会社
    • HATOMOTO TATSUYUKIKOKURYO HIROSHI
    • E02B3/08B01D24/02B01D39/04E02B3/06
    • PROBLEM TO BE SOLVED: To provide a stone-filled structure equipped with a filter medium storage body capable of housing a filter medium, and a steel-frame dam.SOLUTION: A filter medium storage body is longitudinally disposed in an embedded state in a stone-filled structure, and a filter medium is housed in the filter medium storage body. In the stone-filled structure, the filter medium storage body 16 comprises a plurality of corrugated longitudinal-section tubular pipe bodies 1 that are disposed in a longitudinal direction and that each have a water passage hole 2 provided on a lateral peripheral surface; the filter medium 9 is housed in each of the corrugated longitudinal-section tubular pipe bodies 1; a water-permeable filler layer 8 made of a filler 7 is provided on the periphery of the filter medium storage body 16; and the filter medium storage body 16 is embedded. The stone-filled structure serves as a steel-frame dam using a steel frame.
    • 要解决的问题:提供一种装有能够容纳过滤介质的过滤介质储存体的石料填充结构和钢框架坝。 解决方案:过滤介质存储体在嵌入状态下以石填充结构纵向设置,过滤介质容纳在过滤介质存储体中。 在石材填充结构中,过滤介质储存体16包括沿纵向方向设置的多个波纹状纵截面管状管体1,并且每个具有设置在侧面周边的水通道孔2; 过滤介质9容纳在每个波纹纵截面管状管体1中; 在过滤介质储存体16的周围设置由填料7制成的透水性填料层8; 并且过滤介质储存体16被嵌入。 石头填充的结构用作钢框架的钢框架。 版权所有(C)2012,JPO&INPIT
    • 15. 发明专利
    • Steel slit dam, coarse fragment catching unit used for the dam, and method of mounting the unit
    • 钢丝IT AM D D D D D IT IT IT IT IT IT IT IT IT IT IT IT IT IT IT IT IT IT IT IT IT IT IT IT
    • JP2011117247A
    • 2011-06-16
    • JP2009277832
    • 2009-12-07
    • Nippon Steel & Sumikin Metal Products Co Ltd日鐵住金建材株式会社
    • OSUMI HISASHISUZUKI KAZUMASAKOKURYO HIROSHITSUTSUI TOMOTERUONUKI KENICHI
    • E02B7/02
    • PROBLEM TO BE SOLVED: To provide a steel slit dam enabling a mounting work for mounting a member for catching coarse fragments on the slit dam body to be facilitated and also enabling a working on the slit dam body required for mounting the member for catching coarse fragments to be facilitated.
      SOLUTION: This steel slit dam includes a plurality of steel pipe columns 11 with circular cross section which are vertically installed at intervals in the river width direction, and a coarse fragment catching unit 20 in which a plurality of divided members 25 having a cross section formed by dividing a tubular cross section in the circumferential direction are disposed so as to surround the steel pipe columns 11 from the outer peripheral side and horizontal beams 27 extending in the river width direction are attached to a tubular bodies 23 formed by detachably connecting the plurality of divided members 25 thereto. The coarse fragment catching unit 20 is configured so that the rotation thereof is restricted by engaging with the other member such as a foundation concrete 5, a steel pipe beam 13 or the like from the circumferential direction of the steel pipe column 11 when a torque acts on the steel pipe columns 11 in the circumferential direction P1.
      COPYRIGHT: (C)2011,JPO&INPIT
    • 要解决的问题:为了提供一种能够进行安装作业的钢缝隙,能够将用于将粗碎片捕获的构件安装在狭缝坝主体上,以便于进行安装,并且还能够在将构件安装所需的狭缝坝体 捕捉粗碎片以方便。 解决方案:这种钢槽坝包括沿河流宽度方向间隔地垂直设置的多个具有圆形横截面的钢管柱11和粗碎片捕获单元20,其中多个分隔构件25具有 沿圆周方向分割管状横截面形成的横截面被设置成从外周侧围绕钢管柱11,并且沿河流宽度方向延伸的水平梁27附接到通过可拆卸地连接形成的管状体23 多个分割构件25。 粗碎片抓取单元20被构造成当扭矩作用时,通过与钢管柱11的圆周方向上的基础混凝土5,钢管梁13等其他构件接合来限制其旋转 在钢管柱11上沿圆周方向P1。 版权所有(C)2011,JPO&INPIT
    • 16. 发明专利
    • Steel slit dam, gravel body capture member for use in the same, and method for mounting the gravel body capture member
    • 钢丝IT AM D,,BER BER BER BER BER BER BER BER BER BER BER BER BER BER BER BER BER BER BER BER BER BER BER BER BER BER BER BER
    • JP2011074577A
    • 2011-04-14
    • JP2009224079
    • 2009-09-29
    • Nippon Steel & Sumikin Metal Products Co Ltd日鐵住金建材株式会社
    • OSUMI HISASHIETO TOMONORIKOKURYO HIROSHISANO KIYOSHITSUTSUI TOMOTERU
    • E02B7/02
    • PROBLEM TO BE SOLVED: To provide a steel slit dam which can reduce a material cost by reducing the use of a wasteful member to the utmost, and which can exert a function of a gravel body capture member over a long period of time. SOLUTION: This steel slit dam includes: a plurality of supports 11 which are erected at intervals in a river-width direction; a pair of retainer members 21 which are protruded in the river-width direction from mutually-opposed lateral portions 11a of the plurality of supports 11; the circular cross-section gravel body capture members 31 which have both ends 31a supported on the pair of retainer members 21; mounting brackets 23 which are fixed to outer surfaces of the pair of retainer members 21, respectively; and brackets 33 to be mounted, which are fixed to outer peripheral surfaces of the gravel body capture members 31 and detachably connected to the mounting brackets 23, respectively. COPYRIGHT: (C)2011,JPO&INPIT
    • 要解决的问题:提供一种能够通过最大程度地减少浪费部件的使用来减少材料成本并且可以长时间地发挥砾石体捕获部件的功能的钢缝隙坝 。 解决方案:该钢槽坝包括:沿河流方向间隔地竖立的多个支撑件11; 一对保持构件21,其沿着宽度方向从多个支撑体11的相互相对的侧部11a突出; 圆形截面砾石体捕获构件31,其具有支撑在一对保持构件21上的两端31a; 安装支架23分别固定在一对保持构件21的外表面上; 和托架33,它们分别固定在砾石体捕获件31的外周表面上,并分别可拆卸地连接到安装托架23。 版权所有(C)2011,JPO&INPIT
    • 17. 发明专利
    • Steel slit dam and method for constructing the same
    • 钢丝滑块及其构造方法
    • JP2009275434A
    • 2009-11-26
    • JP2008128745
    • 2008-05-15
    • Nippon Steel & Sumikin Metal Products Co Ltd日鐵住金建材株式会社
    • OSUMI HISASHIKOKURYO HIROSHISANO KIYOSHIHORI KENGOISHIDA KATSUYATAKEDA IPPEI
    • E02B7/02
    • PROBLEM TO BE SOLVED: To provide a steel slit dam constructed by burying a sheath tube in a concrete sleeve section and inserting a beam into the sheath tube, capable of effectively transmitting a shearing stress generated by the load transmitted to the sheath tube through the beam, and enabling the construction efficiency to be increased and also provide a method for constructing the steel slit dam. SOLUTION: This steel slit dam comprises concrete dam bodies 2 formed on both sides of a river in the river width direction, center columns 16 vertically installed between the dam bodies 2 at predetermined intervals in the river width direction, reinforcement members 21 assembled upward from the bottom side and buried in the dam bodies 2, sheath tubes 22 supported by the reinforcement members 21 and buried in the bank bodies 2 in such a manner as to open toward the center of the river, and a beam 14 having both ends inserted into the sheath tubes 22 and installed between the bank bodies 2 while crossing the center columns 16. COPYRIGHT: (C)2010,JPO&INPIT
    • 要解决的问题:提供一种通过将护套管埋在混凝土套管部分中并将梁插入护套管而构成的钢槽坝,能够有效地传递由传递到护套管的负载产生的剪切应力 通过梁,能够提高施工效率,并提供构造钢筋坝的方法。 解决方案:该钢切割坝包括形成在河宽方向上的河流两侧的混凝土坝体2,沿河流宽度方向以预定间隔垂直地安装在坝体2之间的中心塔16,组装的加强构件21 从底部向上并且埋设在坝体2中,护套管22由加强构件21支撑并且以向河的中心开放的方式埋在堤体2中,并且具有两端的梁14 插入护套管22中并安装在堤体2之间,同时穿过中心柱16.版权所有(C)2010,JPO&INPIT