    • 91. 发明专利
    • UNDERGROUND STRUCTURE
    • JPH1046615A
    • 1998-02-17
    • JP22043596
    • 1996-08-02
    • TAISEI CORP
    • ARIYAMA MOTOSHIGEARAI MASAOKISHI YASUHIROTAKASE YOSHIYUKI
    • E02D29/045E21D13/00
    • PROBLEM TO BE SOLVED: To eliminate the need for the penetration section of a continuous underground wall, to reduce cost and to shorten the term of works by forming an uplift-receiving section near a bottom section on the inside of the continuous underground wall constructed around a structure body. SOLUTION: A structure body 1 is constructed in the ground, a continuous underground wall 2 is built around the structure body 1, and bottom slabs 3 are erected on a bottom section on the inside of the continuous underground wall 2. Uplift receiving sections 21, 21 having continuously or intermittently projected or recessed shapes, etc., are formed to sections slightly upper than the base of the internal surface of the continuous underground wall 2. Consequently, uplift working to the bottom slabs 3 by the reaction of a base ground is transmitted to the continuous underground wall 2 through the uplift receiving sections 21, and the floating of the structure body 1 is prevented surely. Accordingly, the penetration section of the continuous underground wall 2 is unnecessitated, and cost is reduced and the term of works is shortened while construction management can be facilitated.
    • 92. 发明专利
    • DEVICE AND METHOD FOR ARRANGING FLEXIBLE REINFORCING BAR
    • JPH101942A
    • 1998-01-06
    • JP15728596
    • 1996-06-18
    • TAISEI CORPTONE KKSEIWA KIKO KK
    • HIRAOKA HIROSHIARAI MASAOARIYAMA MOTOSHIGEKIDA HIROKONISHIMURA AKIRATOKUNAGA SUSUMUURAKAWA NOBUYUKI
    • E02D5/20E04G21/12
    • PROBLEM TO BE SOLVED: To provide a device and method for continuously arranging a reinforcing bar, in a construction step of an underground continuous wall, in which a flexible reinforcing bar is used. SOLUTION: A reinforcing bar curing base 29 comprising a beam material is provided at the top end of a continuous wall construction groove and a reinforcing bar arranging device comprising a frame body 10, a reinforcing bar feed means, and a reinforcing bar guiding means is provided on the upper part of the groove. Reinforcing bars are delivered by the reinforcing bar feed means and after a required number of reinforcing bars are formed into a predetermined bundled state by means of the reinforcing bar guiding means, the bars are bundled together at a predetermined pitch to form main reinforcing bars S. And the bars S are pulled out to the base 29 and a lower frame F1 is inserted into the interior of the bars S so as to be suspended therein. Next, while a horizontal reinforcing bar panel Y is being attached to the bars S, the frame F1 is lowered to the groove and an intermediate frame and a top frame are attached at a predetermined interval. Top parts of the main reinforcing bars are fixed to the base 29 using a wedge member and the main bars S are cut off at a level above the fixed point. And concrete is placed up to the lower part of the base 29 to construct a continuous wall and then the base 29 is removed.
    • 93. 发明专利
    • ERECTION OF REINFORCEMENT AND DEVICE THEREFOR
    • JPH09296444A
    • 1997-11-18
    • JP13441896
    • 1996-05-01
    • TAISEI CORP
    • HIRAOKA HIROSHIARAI MASAOARIYAMA MOTOSHIGEKIDA HIROKO
    • E02D5/34E02D5/38E04G21/12
    • PROBLEM TO BE SOLVED: To dispense with a high working space at the upper part of an exavation hole, by attaching lateral reinforcements taken out of a containing device of the lateral reinforcements to the periphery of vertical reinforcements in turn while inserting a plurality of vertical reinforcements at a specified position in an excavated hole. SOLUTION: A containing device 2 of lateral reinforcements is installed at the inner peripheral face of the opening end of an excavated hole 1. A guide frame 5 is arranged above a curing base 4 by supporting it by legs 51. Required number of vertical flexible reinforcements 6 drawn from a drum are inserted in the guide pipes 52 corresponding thereto respectively and inserted into the excavated hole 1 after a shape-retaining frame has been fitted. Lateral reinforcements 3 taken out of the containing device 2 are fitted to the periphery of the vertical flexible reinforcements 6 by welding or the like in parallel to the above insertion work. The lateral reinforcements 3 are urged so as to be extruded upward and hence, they can be taken out of the containing space 23 of the lateral reinforcements with a little force.