会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 1. 发明公开
    • Sheet counter and stacker system
    • 表格计数器和堆叠器系统
    • EP0192211A3
    • 1987-06-16
    • EP86101941
    • 1986-02-15
    • LITTLETON INDUSTRIAL CONSULTANTS, INC.
    • Littleton, Francis John
    • B65H31/26B65H29/66B65H29/70
    • B65H33/12B65H29/66B65H29/6627B65H29/70B65H31/26B65H2301/4212G06M1/101Y10S414/115
    • A system for counting and stacking a continuous stream of shingled or overlapping sheets in which the shingled sheets are transported by a first conveyor and fed into an optional counting means for individually counting the sheets. From the optical counting means, the sheets are fed into a second conveyor which imparts a concave transverse bow to the sheets thereby providing rigidity to the sheets. The sheets exit the second conveyor and are collected by a recovery means for stacking. The second conve..or further includes an insertion means activated by the optical counter for separating the stream of sheets. The action of the insertion means separates the stream of sheets so that a predetermined number of sheets are collected and stacked by the receiving means while the insertion means temporarily supports the continuing stream of sheets. After removal of the completed stack of sheets, the insertion means retracts to its original position thereby transferring the newly forming stack of sheets to the receiving means without interrupting the continuous stream of sheets.
    • 一种用于对连续的带状或重叠片材的流进行计数和堆叠的系统,其中带状的片材由第一传送器输送并被馈送到用于单独计数片材的光学计数装置。 从光学计数装置,片材被送入第二传送器,其向片材施加凹的横向弓形,从而为片材提供刚性。 片材离开第二输送机,并由用于堆叠的回收装置收集。 第二传送器还包括由光学计数器激活以分离片材流的插入装置。 插入装置的作用是分离纸张流,使得预定数量的纸张被接收装置收集和堆叠,同时插入装置临时支撑持续的纸张流。 在完成堆叠的纸张的移除之后,插入装置缩回到其原始位置,从而将新形成的纸张堆叠传送到接收装置,而不中断纸张的连续流。
    • 4. 发明公开
    • Overhead work suspension conveyor
    • HochliegendeAufhängfördererfürWerkstücke。
    • EP0603426A1
    • 1994-06-29
    • EP92121806.1
    • 1992-12-22
    • MITSUBISHI JIDOSHA KOGYO KABUSHIKI KAISHA
    • Kakida, TakuyaInoue, NoriyukiOkada, ShoichiNakamura, YoshikiIkeda, WakaharuMikami, AkiraKimura, AkiyoshiAihara, MasayukiFujiwara, HisashiWatanabe, Yuji
    • B62D65/00
    • B62D65/18Y10S414/115
    • An endless feeder rail (1) is arranged at a high altitude. A transfer position (2) is set in a path defined by the feeder rail. Corresponding to the transfer position, a loading position (3) is set at a lower altitude. A work-loading traverser (4) extends between these positions. Plural running carriages (1A) (see FIG. 2) are arranged along the rail so that each of the carriages is temporarily stopped at the transfer position. From a work storage (8), a piece of work is loaded on a work loading frame (7) by a worker (9). A loading traverser mechanism (11) lifts the work piece in a suspended position from the loading position (3) to the transfer position (2), where the work piece is transferred onto a work receiving jig (5) of one of the carriage for its conveyance along the rail. The frame (7) is arranged pivotally so that it assumes an inclined position at the position (3) but a horizontal position at the position (2) to facilitate the loading and transfer of the work piece.
    • 在高空设置无端的送料轨(1)。 传送位置(2)设置在由馈电轨限定的路径中。 对应于传送位置,将装载位置(3)设定在较低的高度。 工件加载横移器(4)在这些位置之间延伸。 多个行进车架(1A)(参见图2)沿着轨道布置,使得每个托架临时停在转移位置。 从工作存储(8)中,工作人员(9)将一件工作装载在工作装载框架(7)上。 装载横移机构(11)将工件从装载位置(3)提升到悬挂位置到传送位置(2),其中工件被转移到一个托架的工件接收夹具(5)上,用于 沿铁路运输。 框架(7)枢转地布置,使得其在位置(3)处呈现倾斜位置,但在位置(2)处呈现水平位置,以便于工件的装载和传送。