    • 1. 发明公开
    • Piping system
    • Rohrleitungssystem
    • EP2447587A2
    • 2012-05-02
    • EP11185929.4
    • 2011-10-20
    • Toyo Engineering Corporation
    • Noda, Kensuke
    • F16L51/03
    • F16L51/03F16L51/035
    • Provided is a piping system that includes: a main pipe; a first pipe member (5) connected to the equipment nozzle (6), and connected to an input terminal (2) of the main pipe via a first bellows (4); a second pipe member (7) having one end connected to a side part of the main pipe; a third pipe member (9) connected to the other end of the second pipe member via a second bellows (8); first and second tie rod (12) support members fixed to the first and third pipe members; tie rods that interconnect the first and second tie rod support members (10,11); and an anchor (13) that sets a portion of the main pipe near the first bellows (4) as a fixed point. Lengths of the pipe members between the first and second tie rod support members (12) are determined so that the first bellows (4) contracts by thermal expansion of the equipment nozzle, the first pipe member, and the pipe member of the main pipe below the anchor, and the second bellows contracts by an amount equally to that of the first bellows by thermal expansion of all the pipe members between the first and second tie rod support members.
    • 提供一种管道系统,其包括:主管; 连接到设备喷嘴(6)并经由第一波纹管(4)连接到主管的输入端(2)的第一管件(5); 第二管构件(7),其一端连接到主管的侧部; 经由第二波纹管(8)连接到所述第二管件的另一端的第三管件(9); 第一和第二连杆(12)固定到第一和第三管构件的支撑构件; 连接第一和第二拉杆支撑构件(10,11)的拉杆; 以及将主管的一部分靠近第一波纹管(4)设置为固定点的锚(13)。 确定第一和第二拉杆支撑构件(12)之间的管构件的长度,使得第一波纹管(4)通过设备喷嘴,第一管构件和主管的管构件的热膨胀而下降 锚固件和第二波纹管通过第一和第二拉杆支撑构件之间的所有管构件的热膨胀而等同于第一波纹管的量。
    • 2. 发明公开
    • Piping system
    • 管道
    • EP2447587A3
    • 2015-01-21
    • EP11185929.4
    • 2011-10-20
    • Toyo Engineering Corporation
    • Noda, Kensuke
    • F16L51/03
    • F16L51/03F16L51/035
    • Provided is a piping system that includes: a main pipe; a first pipe member (5) connected to the equipment nozzle (6), and connected to an input terminal (2) of the main pipe via a first bellows (4); a second pipe member (7) having one end connected to a side part of the main pipe; a third pipe member (9) connected to the other end of the second pipe member via a second bellows (8); first and second tie rod (12) support members fixed to the first and third pipe members; tie rods that interconnect the first and second tie rod support members (10,11); and an anchor (13) that sets a portion of the main pipe near the first bellows (4) as a fixed point. Lengths of the pipe members between the first and second tie rod support members (12) are determined so that the first bellows (4) contracts by thermal expansion of the equipment nozzle, the first pipe member, and the pipe member of the main pipe below the anchor, and the second bellows contracts by an amount equally to that of the first bellows by thermal expansion of all the pipe members between the first and second tie rod support members.