会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 1. 发明授权
    • Distributed control system
    • 分布式控制系统
    • EP0546339B1
    • 1996-07-03
    • EP92119369.4
    • 1992-11-12
    • Yokogawa Electric Corporation
    • Shioe, YasuhikoAkiyama, ChujiShirai, ToshiakiSakamoto, HideyukiYasui, HitoshiIshikawa, MakioMatsukawa, Hideo
    • G05B19/042G06F11/00
    • G06F11/0757G05B19/0428G06F11/1417
    • A distributed control system including a control station that takes charge of control operation, and a remote input/output device that is connected to the control station through a remote input/output bus. In a normal state, cyclic scan transmission is carried out by using the remote input/output bus so that input/output data handled by the control station and input/output data on the remote input/output device side are maintained equivalently. The control station is provided with a continuation transmission service means that first performs transmission for urgent output only and then performs normal cyclic scan transmission service after the completion of the transmission for urgent output, an initialization start transmission service means that first performs cyclic scan transmission for input only, and an interruption duration measuring means that measures a period of transmission interruption duration of the remote input/output bus. When the result of measurement made by the interruption duration measuring means is shorter than a predetermined time, the continuation transmission service means is activated, whereas, when the result of measurement by the interruption duration measuring means is longer than the predetermined time, the initialization start transmission service means is activated. Thus, when the power supply recovers from a power failure, for example, the system can recover from the transmission interruption state rapidly and shift to the normal process control operation promptly.
    • 2. 发明公开
    • Distributed control system
    • Verteiltes Steuersystem。
    • EP0546339A1
    • 1993-06-16
    • EP92119369.4
    • 1992-11-12
    • Yokogawa Electric Corporation
    • Shioe, YasuhikoAkiyama, ChujiShirai, ToshiakiSakamoto, HideyukiYasui, HitoshiIshikawa, MakioMatsukawa, Hideo
    • G05B19/042G06F11/00
    • G06F11/0757G05B19/0428G06F11/1417
    • A distributed control system including a control station that takes charge of control operation, and a remote input/output device that is connected to the control station through a remote input/output bus. In a normal state, cyclic scan transmission is carried out by using the remote input/output bus so that input/output data handled by the control station and input/output data on the remote input/output device side are maintained equivalently. The control station is provided with a continuation transmission service means that first performs transmission for urgent output only and then performs normal cyclic scan transmission service after the completion of the transmission for urgent output, an initialization start transmission service means that first performs cyclic scan transmission for input only, and an interruption duration measuring means that measures a period of transmission interruption duration of the remote input/output bus. When the result of measurement made by the interruption duration measuring means is shorter than a predetermined time, the continuation transmission service means is activated, whereas, when the result of measurement by the interruption duration measuring means is longer than the predetermined time, the initialization start transmission service means is activated. Thus, when the power supply recovers from a power failure, for example, the system can recover from the transmission interruption state rapidly and shift to the normal process control operation promptly.
    • 包括负责控制操作的控制站和通过远程输入/输出总线连接到控制站的远程输入/输出设备的分布式控制系统。 在正常状态下,通过使用远程输入/输出总线执行循环扫描传输,使得由控制站处理的输入/输出数据和远程输入/输出设备侧的输入/输出数据保持等效。 控制站设置有继续传输服务装置,其首先执行用于紧急输出的传输,然后在紧急输出的传输完成之后执行正常的循环扫描传输服务;初始化开始传输服务装置,其首先执行循环扫描传输, 以及用于测量远程输入/输出总线的传输中断持续时间的中断持续时间测量装置。 当由中断持续时间测量装置进行的测量结果比预定时间短时,继续发送服务装置被激活,而当中断持续时间测量装置的测量结果比预定时间长时,初始化开始 传输服务装置被激活。 因此,当电源从电源故障恢复时,例如,系统可以快速地从传输中断状态恢复,并且迅速转移到正常的处理控制操作。