会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 3. 发明公开
    • Electrical power system stability
    • Stabilitäteines elektrischen Stromsystems
    • EP2824523A2
    • 2015-01-14
    • EP14176383.9
    • 2014-07-09
    • The Boeing Company
    • Karimi, Kamiar J.Solodovnik, Eugene V.Lewis, Zachary R.White, Jeffrey Joseph
    • G05B17/02G05B23/02
    • G06F17/50B64D2221/00G05B17/02G05B23/0256G06F17/5022G06F2217/78H02J2003/007Y04S40/22
    • A method and apparatus for establishing a validated stable design (475) for a stable electrical power system (1210). An initial design (412) for an electrical power system (100) is established. The initial design (412) for the electrical power system (100) satisfies design requirements (414). The initial design (412) for the electrical power system (100) is simulated for a plurality of simulated operating conditions (426) for the electrical power system (100) to generate simulation data (421). Stability parameter requirements (436) for a stable design (437) for the electrical power system (100) are established from the simulation data (421). A hardware implementation of the stable design (437) for the electrical power system (100) is tested to generate hardware testing data (472). The stable design (437) for the electrical power system (100) is validated using the hardware testing data (472) to establish a validated stable design (475) for the electrical power system (100).
    • 一种用于建立用于稳定电力系统(1210)的经验证的稳定设计(475)的方法和装置。 建立了用于电力系统(100)的初始设计(412)。 电力系统(100)的初始设计(412)满足设计要求(414)。 模拟用于电力系统(100)的多个模拟操作条件(426)的用于电力系统(100)的初始设计(412)以产生模拟数据(421)。 根据模拟数据(421)建立用于电力系统(100)的稳定设计(437)的稳定性参数要求(436)。 对电力系统(100)的稳定设计(437)的硬件实现进行测试以产生硬件测试数据(472)。 使用硬件测试数据(472)验证电力系统(100)的稳定设计(437),以建立用于电力系统(100)的验证稳定设计(475)。
    • 4. 发明公开
    • Power management control system and method
    • 电源管理控制系统和方法
    • EP2709230A2
    • 2014-03-19
    • EP13183474.9
    • 2013-09-09
    • The Boeing Company
    • Fu, Sheau-Wei J.Karimi, Kamiar J.Mesbahi, MehranZelazo, Daniel
    • H02J3/00G06Q10/04H02J4/00
    • G05B17/02B64D2221/00G06Q10/047G06Q10/06G06Q50/06H02J3/14H02J2003/146Y02T50/54
    • A system to control a power distribution system (102) includes a system controller (110) configured to determine an allocation of power during a first time period for each of a plurality of subsystems. The system also includes a subsystem controller (130) communicatively coupled to the system controller. The subsystem controller is associated with a device (144) and configured to receive power allocation data indicating the allocation of power for the device from the system controller. The subsystem controller is further configured to receive operation request data indicating a request to operate the device and produce a model operation of the device for a second time period based on the power allocation data, the operation request data, and a cost-utility function associated with the device. The subsystem controller is also configured to communicate, to the system controller, projected power demand data associated with the modeled operation of the device during the second time period.
    • 一种用于控制配电系统(102)的系统包括系统控制器(110),该系统控制器(110)被配置为确定多个子系统中的每个子系统在第一时间段期间的功率分配。 该系统还包括通信地耦合到系统控制器的子系统控制器(130)。 子系统控制器与设备(144)相关联,并被配置为从系统控制器接收指示设备功率分配的功率分配数据。 子系统控制器进一步被配置为接收指示操作设备的请求的操作请求数据,并且基于功率分配数据,操作请求数据以及与成本效用函数关联的成本 - 效用函数在第二时间段内产生设备的模型操作 与设备。 子系统控制器还被配置为向系统控制器传送与在第二时间段期间对设备的建模操作相关联的预计电力需求数据。