会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 1. 发明公开
    • WET METALLURGY METHOD FOR NICKEL OXIDE ORE
    • EP3550040A1
    • 2019-10-09
    • EP17876261.3
    • 2017-11-16
    • Sumitomo Metal Mining Co., Ltd.
    • YONEYAMA TomoakiSHIBAYAMA Keisuke
    • C22B23/00C22B3/06C22B3/44
    • Disclosed herein is a hydrometallurgical method for nickel oxide ore based on high pressure acid leaching which is capable of increasing the recovery rate of nickel in a dezincification step of removing zinc contained in the ore.
      The hydrometallurgical method includes: a leaching step S1 in which nickel oxide ore is subjected to acid leaching under high pressure to obtain a leachate; a neutralization step S3 in which a neutralizer is added to the leachate to generate a neutralized precipitate, and the neutralized precipitate is removed to obtain a post-neutralization solution; a dezincification step S4 in which hydrogen sulfide gas is blown into the post-neutralization solution to generate a zinc precipitate, and the zinc precipitate is removed to obtain a post-dezincification solution; and a nickel recovery step S5 in which a sulfurizing agent is added to the post-dezincification solution to recover nickel as a sulfide, wherein the hydrogen sulfide gas is blown into two or more reaction tanks connected in series to allow the post-neutralization solution to flow therethrough in order in such a manner that an amount of the hydrogen sulfide gas blown into the second and following reaction tanks from top is adjusted to 50% or more but 90% or less of a total amount of the hydrogen sulfide gas blown into all the reaction tanks.
    • 3. 发明公开
    • HYDROMETALLURGICAL METHOD FOR REFINING NICKEL OXIDE ORE
    • EP3524700A1
    • 2019-08-14
    • EP17858474.4
    • 2017-10-05
    • Sumitomo Metal Mining Co., Ltd.
    • MIYAMOTO TakashiSHIBAYAMA Keisuke
    • C22B23/00
    • Disclosed herein is a hydrometallurgical method for refining nickel oxide ore in which a filtration device is prevented from being quickly clogged to improve production efficiency.
      The hydrometallurgical method for refining nickel oxide ore includes: a leaching step in which nickel oxide ore is subjected to acid leaching under high pressure; a solid-liquid separation step in which an obtained leach slurry is washed and then subjected to solid-liquid separation to obtain a leachate containing the nickel; a neutralization step in which a neutralizer and a flocculant are added to the leachate to obtain a neutralized precipitate, and then the neutralized precipitate is separated by solid-liquid separation from a post-neutralization solution containing nickel; a dezincification step in which a sulfurizing agent is added to the post-neutralization solution to obtain a slurry containing zinc sulfide, and the slurry is subjected to solid-liquid separation to obtain the zinc sulfide and a post-dezincification solution; and a nickel recovery step in which a sulfurizing agent is added to the post-dezincification solution to obtain a mixed sulfide containing the nickel, and the mixed sulfide is separated by solid-liquid separation from a post-sulfurization solution, wherein an amount of the neutralizer added is adjusted so that a Fe concentration of the post-neutralization solution obtained in the neutralization step is 1.25 g/L or less.
    • 5. 发明公开
    • WET SMELTING PLANT FOR NICKEL OXIDE ORE AND METHOD FOR OPERATING SAME
    • HYDROMETALLURGISCHE ANLAGEFÜRNICKELOXIDERZ UND BETRIEBSVERFAHRENDAFÜR
    • EP2492364A1
    • 2012-08-29
    • EP10824776.8
    • 2010-10-01
    • Sumitomo Metal Mining Co., Ltd.
    • NAKAI OsamuKITAZAKI ToruHEGURI ShinichiOZAKI YoshitomoSHIBAYAMA Keisuke
    • C22B23/00C22B3/44
    • C22B23/04C22B3/02C22B23/0407Y02P10/234
    • In a hydrometallurgical plant of a nickel laterite ore having a plurality of lines of treatment facilities, the hydrometallurgical plant of the nickel laterite ore which is, even when a serious trouble will occur in said treatment facilities, capable of minimizing decrease in throughput caused by this, and restoring a normal operation state early, after eliminating the serious trouble, and an operation method thereof.
      A hydrometallurgical plant of a nickel laterite ore having a plurality of lines, as treatment facilities including a pretreatment step, a leaching step, a solid-liquid separation step, a neutralization step, a zinc removal step, a sulfurization step and a detoxification step as one line, wherein a coupling pipeline having a valve is installed between a liquid sending pipeline from the solid-liquid separation step to the neutralization step in each line and/or between a liquid sending pipeline from the sulfurization step to the detoxification step in each line.
    • 在具有多条处理设备的镍红土矿的湿法冶金设备中,即使在所述处理设备中将发生严重故障的镍红土矿石的湿法冶金设备也能够最小化由此产生的吞吐量降低 并且在消除严重故障之后提前恢复正常操作状态及其操作方法。 一种具有多条线的镍红土矿的湿法冶金装置,作为包括预处理步骤,浸出步骤,固液分离步骤,中和步骤,除锌步骤,硫化步骤和解毒步骤的处理设备,作为 一条线,其中具有阀的联接管道安装在从固液分离步骤到每条生产线中的中和步骤的送液管道之间和/或从每个生产线中的硫化步骤到排毒步骤的送液管道之间 。