会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 3. 发明公开
    • METHOD AND ELEVATOR ARRANGEMENT
    • EP3763654A1
    • 2021-01-13
    • EP19186073.3
    • 2019-07-12
    • KONE Corporation
    • Haapaniemi, MarkkuRäsänen, MattiSaarela, SamiVenho, AnssiMikkonen, JanneLanz, OttoViita-aho, TarvoKere, Petri
    • B66B17/20B66B11/00
    • The invention relates to a method for transporting construction material and/or equipment into and inside a building (1) under construction, wherein the building (1) under construction comprises plurality of vertically displaced floors (F0-Fn), the method comprising providing a control system (11) configured to automatically operate one or more transporting devices (2-6,GE), including at least an elevator (GE); providing a storage (8) at the construction site of the building; and transporting into the storage (8) at the construction site of the building (1) under construction plurality of transport containers (9) containing construction material and/or equipment; storing said transport containers (9) in the storage (8); and delivering transport containers (9) belonging to said plurality of transport containers from said storage (8) to different destination floors (F1-Fn), the delivering comprising obtaining an order to deliver a transport container (9), the order identifying the transport container (9) to be delivered; and retrieving the transport container (9) identified in the order from the storage (8); and moving said transport container (9) at least_horizontally to a container loading floor (F0) of the building (1) under construction; and loading said transport container (9) on the load receiving unit (7) for being moved to its destination floor; and obtaining the destination floor information indicating the destination floor of said container (9); and moving the load receiving unit (7) vertically in the elevator shaft (S) to the destination floor of said transport container (9); and unloading said transport container (9) from the load receiving unit (7) to the destination floor of said transport container (9). The invention also relates to a method for constructing a building and an arrangement for transporting construction material, which implement the method for transporting construction material and/or equipment into and inside a building (1) under construction.
    • 4. 发明公开
    • METHOD FOR MODERNIZING ELEVATOR SYSTEM
    • EP3904267A1
    • 2021-11-03
    • EP20171548.9
    • 2020-04-27
    • KONE Corporation
    • Haapaniemi, MarkkuRäsänen, MattiViita-aho, TarvoKere, PetriLaine, JanneÖsterman, JariMustalahti, JormaVenho, AnssiHägg, JoriLanz, Otto
    • B66B19/00
    • The invention relates to a method for modernizing an elevator system, which elevator system comprises a first elevator (1) comprising a first car (2) in a first hoistway (3), a second elevator (4), comprising a second car (5) in a second hoistway (6), the method comprising using the first and second car (2,5) for transporting passengers and/or goods between vertically displaced floors of a building (7), and thereafter removing the first elevator car from use for transporting passengers and/or goods between vertically displaced floors, and thereafter installing a construction time elevator (8) into the lower end of the first hoistway (3), the traveling zone (Z3) of the car (9) of the construction time elevator (8) covering only partially the height of the first hoistway (3); and thereafter using the car (9) of the construction time elevator (8) and the second car (5) simultaneously for transporting passengers and/or goods between vertically displaced floors of the building (7), during which using the method comprises performing construction work in the first hoistway (3) above the traveling zone (Z3) of the car (9) of the construction time elevator (8); and thereafter changing the traveling zone (Z3) of the car (9) of the construction time elevator (8) to extend higher (Z5) in the hoistway (3), and thereafter using the car (9) of the construction time elevator (8) and the second car (5) simultaneously for transporting passengers and/or goods between vertically displaced floors, during which using the method comprises performing construction work in the first hoistway (3) above the traveling zone (Z5) of the car (9) of the construction time elevator.
    • 7. 发明公开
    • METHOD AND ELEVATOR ARRANGEMENT
    • EP3763652A1
    • 2021-01-13
    • EP19186070.9
    • 2019-07-12
    • KONE Corporation
    • Haapaniemi, MarkkuRäsänen, MattiSaarela, SamiVenho, AnssiMikkonen, JanneLanz, OttoViita-aho, TarvoKere, Petri
    • B66B1/24
    • The invention relates to a method for managing flow of people and goods within a building (1) under construction, comprising providing one or more elevator control systems (4,8;4') for automatically controlling movement of elevator cars; providing a first passenger elevator (PE1), the first passenger elevator comprising a first passenger elevator car (3) for transporting people, the first passenger elevator car (3) being vertically movable in an elevator hoistway (2) formed inside the building (1) under construction, vertical movement of the car (3) being automatically controlled by an elevator control system (4;4'), the first passenger elevator car (3) comprising an interior delimited by floor, walls, ceiling and at least one automatic door (5); and providing a goods elevator (GE), the goods elevator comprising a goods elevator car (7) for transporting goods , the goods elevator car (7) being vertically movable beside the first passenger elevator car (3) in an elevator hoistway (6) formed inside the building (1) under construction, vertical movement of the goods elevator car (7) being automatically controlled by an elevator control system (8;4'), the goods elevator car (7) comprising at least a transport platform (7a); using the first passenger elevator (PE1) to transport passengers between floors of the building (1) under construction; and using the goods elevator (GE) to transport goods between floors (F0-Fn) of the building (1) under construction. The invention also relates to an arrangement for managing flow of people and goods within a building (1) under construction, which arrangement implements the method.