会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 3. 发明公开
    • Power transmission chain, method for manufacturing the same, and power transmission apparatus
    • Kraftübertragungskette,Verfahren zu ihrer Herstellung undKraftübertragungsvorrichtung
    • EP1801454A2
    • 2007-06-27
    • EP06026505.5
    • 2006-12-20
    • JTEKT CORPORATION
    • Yasuhara, ShinjiToyota, Hiroshi
    • F16G13/06F16G5/18
    • F16G5/18B21L15/00B21L15/005
    • Larger pre-tension is applied to each link (11) such that residual compressive stress is larger at the portion of the link (11) facing the inside of a chain than the outside. Assuming that for each of the links (11) in a state that pre-tension is not applied, a predetermined pitch is P, a first inclination angle of a fixing portion of the front inserting portion with respect to a chain proceeding direction is α, and a second inclination angle of a fixing portion of the rear inserting portion with respect to a chain proceeding direction is β, when the pre-tension is applied to each of the links, the pitch changes into P+ΔP, the first inclination angle changes into α-Δα and the second inclination angle changes into β+Δβ where ΔP > 0, Δα > 0, and Δβ > 0.
    • 对每个链节(11)施加更大的预张力,使得在链节(11)的面向链内部的部分处的残余压应力大于外部。 假设对于在不施加预张力的状态下的每个连杆(11),预定间距为P,前插入部分相对于链条行进方向的固定部分的第一倾斜角度为±, 并且后插入部分相对于链条行进方向的固定部分的第二倾斜角度为“2”,当将预张力施加到每个链节时,间距变为P +“P,第一倾斜角度变化 “±”,第二个倾斜角度变为“+”²,其中“P> 0”,“0”和“²”0。