会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 2. 发明公开
    • Escalator installation method
    • Einbauverfahrenfüreine Rolltreppe
    • EP1108674A2
    • 2001-06-20
    • EP00105220.8
    • 2000-03-13
    • Hitachi, Ltd.Hitachi Building Systems Co., Ltd.
    • Yamaguchi, Yukihiro, Hitachi Ltd., Intel. Prop. GrYamaki, Masamitsu, Hitachi Build. Systems Co. Ltd.Saito, Chuichi, Hitachi Ltd., Intell. Prop. Group
    • B66B21/00
    • B66B21/00
    • An object of the present invention is to provide an escalator installation method by which the installation operation can be conducted with the high operation efficiency and an escalator can be stably installed. In an architectural structure 6 having a stairway 7, the present invention comprises: a first process for forming a lower pit 11 in a lower floor 10 positioned on the lower side of the stairway 7; a second process for forming an upper pit 9 in an upper floor 8 positioned on the upper side of the stairway 7; and a third process for accommodating a lower flat portion 14 of an escalator 1 constituted by an integral structure in the lower pit 11 with the part of the stairway 7 positioned between the upper pit 9 and the lower pit 11 being maintained so as not to be drilled, accommodating an upper flat portion 12 in the upper pit 9, and setting an inclined portion 13 of the escalator 13 above the part of the stairs 7 positioned between the upper pit 9 and the lower pit 11.
    • 本发明的目的是提供一种自动扶梯安装方法,通过该自动扶梯安装方法可以以高的操作效率进行安装操作,并且可以稳定地安装自动扶梯。 在具有楼梯7的建筑结构6中,本发明包括:第一工序,用于在位于楼梯7的下侧的下层10中形成下坑11; 用于在位于楼梯间7的上侧的上层8中形成上坑9的第二过程; 并且第三工序用于容纳由下部凹坑11中的一体结构构成的自动扶梯1的下部平坦部分14,其中台阶7的一部分位于上部凹坑9和下部凹坑11之间,以保持不会 钻孔,将上部平坦部分12容纳在上部凹坑9中,并且将自动扶梯13的倾斜部分13设置在位于上部凹坑9和下部凹坑11之间的楼梯7的部分之上。<图像>