会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 2. 发明公开
    • Structure and method of connecting I-Type prestressed concrete beams using steel brackets
    • 用于连接施工和方法I型预应力用钢支架混凝土梁
    • EP1548190A2
    • 2005-06-29
    • EP04012158.4
    • 2004-05-22
    • Dongyang Construction Co., Ltd.
    • Kim, Won-keunKim, Moon-palShin, Hyun-keePark, Seoung-kyooKim, Tae-hyoungSon, Young-ho
    • E01D2/02E01D2/00E01D101/28
    • E01D2/02E01D2/00E01D2101/285
    • A structure and method of connecting a plurality of PSC-I beams (PSC-I beams) to each other using steel brackets. The beam connecting structure, each having a sheath pipe therein, includes an end plate which is mounted on each of both ends of each of the PSC-I beams, with a through hole provided on an upper portion of the end plate to correspond to the sheath pipe embedded in each of the PSC-I beams; a steel bracket integrally which is provided on the end plate to be perpendicular to the end plate; a bracket coupling plate to integrally couple the aligned steel brackets to each other; a bottom connecting plate which is provided on lower ends of the aligned steel brackets to connect the steel brackets to each other; a connecting sheath pipe which is provided between the PSC-I beams so that both ends of the connecting sheath pipe are respectively inserted into the through holes of the neighboring end plates of the PSC-I beams while the PSC-I beams are arranged linearly; a prestress strand which is inserted in the sheath pipes of the PSC-I beams and the connecting sheath pipe; and a concrete part which is filled in a space between the PSC-I beams to embed the aligned steel brackets, the bracket coupling plate and the connecting sheath pipe in the concrete part.
    • 的结构和连接PSC-I梁的多个方法(PSC-I梁)海誓山盟使用钢支架。 梁连接结构,每一个都具有鞘管在其中,包括在端板的所有其安装在每个各所述PSC-I梁的两端的,与在对应于所述端板的上部设置在通孔 嵌入每个PSC-I梁的鞘管; 一个钢支架一体所有,其设置在所述端板以垂直于端板; 支架联接板一体耦合对准钢括号海誓山盟; 其设置在对齐的钢支架固定到钢支架连接到海誓山盟的下端的底部连接板所有; 连接鞘管全部被所述PSC-I之间,设置光束,并在连接鞘管的两端分别插入而PSC-I束线性排列的通过PSC-I的邻接端板的通孔梁; 预应力海滩所有被插入在PSC-I梁和连接护套管的鞘管; 和一个混凝土部分中的所有其被填充在PSC-I之间的空间波束嵌入对准的钢支架,所述支架联接板和连接管鞘在混凝土部分。