会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 6. 发明公开
    • METHOD FOR DETERMINING AN AMOUNT OF BUILD MATERIAL WHICH IS TO BE APPLIED IN A BUILD PLANE AND DOSING DEVICE COMPRISING A CONTROL UNIT USING THE METHOD
    • EP3521027A1
    • 2019-08-07
    • EP18154525.2
    • 2018-01-31
    • CL Schutzrechtsverwaltungs GmbH
    • Bokkes, Tobias
    • B33Y50/00B29C64/393B29C64/205B29C64/153
    • Method for determining an amount of build material (3) which is to be applied in a build plane (BP) of an apparatus (1) for additively manufacturing at least one three-dimensional object (2) by means of successive layerwise selective irradiation and consolidation of layers of build material (3) applied in the build plane (BP) of the apparatus (1) by means of at least one energy beam (4), the method comprising the steps of:
      - subdividing at least a part of the build plane (BP), particularly the complete build plane (BP), of the apparatus (1), in which build plane (BP) build material (3), which is to be selectively irradiated and consolidated during an additive manufacturing process of at least one three-dimensional object (2) by means of the apparatus (1), is to be applied, into a plurality of build plane elements (BPE),
      - categorizing the build plane elements (BPE) in a first category (BPE1), which indicates that a respective build plane element (BPE) is located in an area of the build plane (BP), which is to be selectively irradiated and consolidated during the selective irradiation and consolidation of the respective layer, or in at least one second category (BPE2), which indicates that a respective build plane element (BPE) is not located in an area of the build plane (BP), which is to be selectively irradiated and consolidated during the selective irradiation and consolidation of the respective layer, and
      - determining the amount of build material (3) which is to be applied in the respective layer on basis of the number of build plane elements (BPE) which have been categorized in the first category (BPE1) and/or the number of build plane elements (BPE) which have been categorized in the at least one second category (BPE2).