会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 1. 发明公开
    • Method for monitoring a passive optical network using monitoring units
    • 用于监视使用监视单元的无源光网络的方法
    • EP2086133A1
    • 2009-08-05
    • EP08001689.2
    • 2008-01-30
    • Alcatel-Lucent Deutschland AG
    • Straub, MichaelSchmuck, HaraldJentsch, LotharHehmann, Jörg
    • H04B10/207H04L12/44H04J3/14
    • H04J3/14H04B10/27H04B10/272H04J3/1694H04L12/12Y02D50/40
    • A method for monitoring a passive optical network (1), PON, having a tree-like structure with a main line (3) and at least two branches (6.1 to 6.3), comprising: transmitting a wake-up signal (10) from the main line (3) to at least two monitoring units (DPM1 to DPM3) arranged in the at least two branches (6.1 to 6.3), in each of the monitoring units (DPM1 to DPM3), detecting the wake-up signal (10) and transmitting a response signal (A, B, C) back to the main line (3), each of the monitoring units (DPM1 to DPM3) generating a pre-defined time delay (Δt A to Δt c ) between the detection of the wake-up signal (10) and the start of the transmission of the response signal (A, B, C), and receiving the response signals (A, B, C) at the main line (3), the receiving times (R1 to R3) of the response signals (A, B, C) being different from each other, the difference between the receiving times (R1 to R3) being adjusted by the pre-defined time delays (Δt A to Δt c ) of the monitoring units (DPM1 to DPM3).
    • 从发射唤醒信号(10):一种用于监测无源光网络(1)中,PON,其具有带主干线(3)和至少两个分支(6.1到6.3)的树状结构的方法,包括 主干线(3)连接到至少两个监视在至少两个分支(6.1至6.3),其布置单元(DPM1到DPM3),(在每个监视单元(DPM1到DPM3)中检测唤醒信号10 )和发送响应信号(A,B,C)返回到主线路(3),每个所述监测单元(DPM1到DPM3)生成在检测之间的预定义的时间延迟(“T A为” TC) 所述唤醒信号(10)和所述响应信号(A,B,C),的传输的开始和接收响应信号(A,B,C)在所述主线路(3),接收时刻的 的响应信号的(R1至R3)(A,B,C)是彼此不同的,(R1至R3)的接收时间之间的差被预先定义的时间延迟调整(“T A为” TC) 监测单位 (DPM1到DPM3)。