会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 5. 发明公开
    • CABLE CONNECTION HOUSING PROVIDING MULTIPLE METHODS FOR WATERPROOFING MAIN CABLES
    • MEHRERE方法ZUR WASSERABDICHTUNG VON HAUPTKABELN BEREITSTELLENDESKABELVERBINDUNGSGEHÄUSE
    • EP2429049A1
    • 2012-03-14
    • EP09844238.7
    • 2009-05-06
    • Chi, Yu-Fen
    • HSING, Chih Kuang
    • H02G15/18H02G3/08
    • H02G15/013H02G15/007H02G15/06
    • The present invention relates to a communication cable splice box that is capable of different ways to waterproof the main cable, the cable splice box comprises a protective cover and at least a cable entry end, the cable entry space has at least three hollow cylindrical columns, one of the hollow cylindrical columns can provide entry for two main cables that are preparing for heat shrink waterproofing into the cable splice box, the two remaining hollow cylindrical columns each provides entry for one main cable that is preparing for elastic rubber tube-shrinkable waterproofing into the cable splice box. This can improve in the prior art and solve the array of waterproofing problems encountered in the entry opening of the main cable of the telecommunication cable splice box.
    • 本发明涉及一种能够以不同的方式防水主缆的通信电缆接头盒,该电缆接头盒包括保护盖和至少一个电缆入口端,电缆入口空间具有至少三个中空的圆柱形柱, 其中一个中空的圆柱体可以为准备热收缩防水的两条主要电缆进入电缆接头盒,另外两个空心圆柱体为每个主电缆提供入口,该电缆正在为弹性橡胶管收缩防水而准备 电缆拼接盒。 这可以在现有技术中得到改善,并且解决了在通信电缆拼接盒的主电缆的进入开口中遇到的防水问题的阵列。
    • 6. 发明公开
    • CABLE CONNECTION CASING
    • KABELVERBINDUNGSGEHÄUSE
    • EP2950411A1
    • 2015-12-02
    • EP13873118.7
    • 2013-01-23
    • Chi, Yu-Fen
    • HSING, Chih-Kuang
    • H02G15/18H02G15/00G02B6/44
    • G02B6/4446H02G15/013H02G15/115H02G15/1833
    • A cable connection casing (1) comprises a pillar (5), wherein a waterproof structure is formed between the pillar (5) and a cable. When the cable connection casing is carrying out halfway guiding branch connection, the pillar coordinates with an elastic contracting sleeve (13) to perform waterproof processing, so as to solve the technical problems in the prior art that when the cable connection casing which uses the elastic contracting sleeve to perform waterproof processing is carrying out the halfway guiding branch connection, the operation is difficult to handle, the cost is high, and the construction quality is inconsistent.
    • 电缆连接壳体(1)包括柱(5),其中在柱(5)和电缆之间形成防水结构。 当电缆连接壳体正在进行中途导引支路连接时,支柱与弹性收缩套筒(13)协调进行防水处理,以解决现有技术中的技术问题,当使用弹性的电缆连接套管 承包套进行防水加工正在进行中途引导分支连接,操作难处理,成本高,施工质量不一致。