会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 3. 发明公开
    • GRÜNDUNGSPFAHL UND VERFAHREN ZUM HERSTELLEN EINER GRÜNDUNG FÜR EIN BAUWERK IM WASSER
    • GRÜNDUNGSPFAHL
    • EP2702209A2
    • 2014-03-05
    • EP12715845.9
    • 2012-04-16
    • Herrenknecht AG
    • PETERS, MarcREICH, Thorsten
    • E02D27/42
    • E02D27/42E02D27/425
    • The invention relates to a foundation pile for producing a foundation for a structure in water, in particular an offshore structure, having a portion (12) situated in the ground (4) and in which the outer diameter (19) increases towards the water bed (26), and the outer diameter (19) is designed as a function of the distribution of bending moment (16) acting on the pile (10), and to a method for producing a foundation for a structure in water, preferably an offshore structure, in which a pile (10) is lowered in the ground (11) into an opening (21), wherein the opening (21) in the ground (11) is produced using boring technology, an overcut (22) is generated during boring such that the opening (21) is larger than the pile (10), and the overcut (22) is filled with a suspension, wherein the pile (10) is introduced with an increasing outer diameter (19) into the opening (21), and wherein the outer diameter (19) increases towards the water bed (26).
    • 本发明涉及一种用于生产用于水中的结构的基础的基础桩,特别是海上结构,其具有位于地面(4)中的部分(12),并且外径(19)朝向水床 (26),并且外径(19)被设计为作用在桩(10)上的弯矩(16)的分布的函数,以及用于生产用于水中的结构的基础的方法,优选地在海上 结构,其中桩(10)在地面(11)中下降到开口(21)中,其中通过钻孔技术制造地面(11)中的开口(21),在 使得开口(21)比桩(10)大,并且过度切口(22)填充有悬架,其中,桩(10)以增加的外径(19)引入到开口(21)中 ),并且其中所述外径(19)朝向所述水床(26)增加。