会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 128. 发明公开
    • CUTOFF VALVE
    • 截止阀
    • EP1798456A1
    • 2007-06-20
    • EP05768829.3
    • 2005-07-27
    • MIURA CO., LTD.
    • TAKEDA, TomohisaKITAYAMA, Masato
    • F16K1/34F16K31/06
    • F16K31/0655F16K1/443Y10T137/86944Y10T137/8704
    • A valve body (11) is formed by separably superimposing, one upon the other, a large diameter first valve body portion (11a) in contact with a first valve seat portion (7a) formed on the inlet side of a valve hole (8), and small diameter second valve body portion (11b) in contact with a second valve seat portion (7b) formed on the outlet side of the valve hole (8). The first valve body portion (11a) is formed of an elastic material, and at least the portion of the second valve body portion (11b) other than the portion in contact with the second valve seat portion (7b) is formed of a rigid material. At the center of the first valve body portion (11a) , there is formed a through-hole (18) through which the valve operating shaft (10) is passed. The forward end of the valve operating shaft (10) passed through the through-hole (18) is connected to the second valve body portion (11b). Between the firstvalvebodyportion (11a) and the valve operating shaft (10), a first valve body portion moving means (19) is provided, which is adapted to effect mutual engagement at the time of valve opening to move the central portion of the first valve body portion (11a) away from the second valve body portion (11b). At the connecting portion of the forward end of the valve operating shaft (10) and the second valve body portion (11b), a second valve body portion valve opening operation delaying means (20) is provided, which delays, at the time of valve opening, the valve opening operation of the second valve body portion (11b), and gives priority to the operation of moving the first valve body portion (11a) by the first valve body portion moving means (19).
      As a result, in the valve body (11), composed of the first valve body portion (11a) and the second valve body portion (11b), even if the outer diameter of the first valve body portion (11a) on the fluid inlet side on which the fluid pressure acts is large, it is possible to open the valve with a smaller force than in the prior art.
    • 一个阀体(11)通过相互可分离地叠置一个大直径的第一阀体部分(11a)与形成在阀孔(8)入口侧的第一阀座部分(7a)接触, 以及与形成在阀孔(8)的出口侧上的第二阀座部分(7b)接触的小直径第二阀体部分(11b)。 第一阀体部(11a)由弹性材料形成,第二阀体部(11b)的与第二阀座部(7b)接触的部分以外的至少一部分由刚性材料 。 在第一阀体部分(11a)的中心形成有供阀操作轴(10)穿过的通孔(18)。 穿过通孔(18)的气门操作轴(10)的前端连接到第二阀体部分(11b)。 在第一阀体部分(11a)和阀门操作轴(10)之间设置有第一阀体部分移动装置(19),该第一阀体部分移动装置适于在阀门打开时实现相互接合以移动第一阀门 (11a)远离第二阀体部分(11b)。 在阀操作轴(10)的前端与第二阀体部(11b)的连接部设置有第二阀体部开阀动作延迟机构(20),该第二阀体部开阀动作延迟机构(20)在阀 打开第二阀体部分(11b)的阀门打开操作,并且优先考虑由第一阀体部分移动装置(19)移动第一阀体部分(11a)的操作。 其结果是,在由第一阀体部(11a)和第二阀体部(11b)构成的阀体(11)中,即使流体入口的第一阀体部(11a)的外径 流体压力起作用的一侧较大,所以可以以比现有技术更小的力打开阀。